APL 570 Certification Prep
API 578 Practice Questions
This following study aid helps you learn the content of API RP-578, Material
Verification Program for New and Existing Alloy Piping Systems. There will be
about 5 questions from this document on the API 570 exam, We do not spend
class time on this publication. So it is important that you become familiar with this
content in your personal study sessions.
The questions in this study aid are in the same order as API 578. The answer key
with references is in the back of this guide. It is helpful to read through API 578
before working on this exercise! (Questions in Vellow are Open Book Quester!
MSTS
API 578 provides guidelines for a material assurance system to verify:
aoge
all materials.
all alloy materials.
only non-ferrous materials.
only high-alloy materials.
The material verification program specified by API 578 covers
a. only pressure-containing components.
b. only pipe, and fittings.
c. only pipe, fittings, and welds.
d. _ pressure-containing and non-pressure containing components,
An alloy material is any metallic material that contains alloying elements that
are added:
a. only to improve mechanical properties
b. only to improve corrosion resistance.
c. to improve either mechanical properties or corrosion resistance
An inspection lot includes:
aoge
all materials from a common source.
all materials included on the same purchase order.
all materials of the same material type (i.e. 316 SS)
all materials from a common source, of the same material type and
same heat.
1 February 2013,APL 570 Certification Prep
API 578 Practice Questions
5. For construction and repair activities a written material verification
program should be established by the:
a. API 570 Authorized Inspector.
b. Engineering Organization
cc. Owner/User.
d. Repair Organization.
6. The material verification program should cover PMI testing of materials
a. during construction of piping systems.
b. _ in existing piping systems.
cc. during repairs and alterations of piping systems
d. _ inexisting piping systems and during construction, repairs and
alterations of piping systems.
7. During repairs, random PMI sampling of new components is most appropriate
for:
a. low-risk piping systems.
b. _ low alloy piping systems,
¢. stainless steel piping systems.
d. ferritic steel piping systems.
e. all piping systems.
8 Who has the responsibility to determine the extent of PMI performed?
APL 570 Authorized Inspector
Owner/User
Piping Engineer
Repair Organization
aoge
9. During construction the Owner should consider 100% PMI of new
components on:
a. all piping systems.
b. all alloys above P-5
c. exotic alloys
d. high-risk piping systems.
MSTS 2 February 2013,APL 570 Certification Prep
API 578 Practice Questions
a. Benzene
b. Hydrofluoric acid (HF)
cc. Sulfuric acid
d. Wet hydrogen sulfide
11. Who is responsible to assure that the material verification program meets
the guidelines of API 578?
a. Authorized Inspector
b. Examiner
cc. Owner/User
d.
Piping Engineer
12. Who is responsibility to verify the adequacy of the material verification
program that is performed by material suppliers?
a. APL PMI Specialist
b. Authorized Inspector
c. Piping Engineer
d. Owner/User
13, Who has the responsibility to review and approve the adequacy of the PMI
program used by fabricators?
a. API 570 Authorized Inspector
b. API 578 Certified Inspector
c. Engineering Organization
d. Owner/User
e. Repair Organization
14. A mill test report:
eliminates the need for further material verification.
is a report showing material discrepancies
is an important part of the material qualify assurance program.
is issued by the owner upon receipt of materials.
aoge
MSTS 3 February 2013,APL 570 Certification Prep
API 578 Practice Questions
MSTS
During construction, which of the following alloy components does not need
to be covered by a material verification program?
Bolts
Expansion Joints
Gaskets
Pressure containing welds
All the above components need to be checked
paoge
During alloy welding
a. one electrode from each pallet should be identified
b. two electrodes from each pallet should be identified.
c. one electrode from each lot or package should be identified.
d. two electrodes from each lot or package should be identified.
Tf alloy element(s) are contained in the flux of a welding electrode, PMI
testing:
a. is not necessary.
b. _ isnot necessary provided appropriate documentation is provided by
the supplier,
¢. could be conducted on any of the production welds.
d. could be conducted on a “weld button” prior to production welds.
New longitudinal welded alloyed pipe should:
a. never be used.
b. always receive random PMT testing of weld and base metal
c. receive random PMI testing of weld and base metal if there is a
reason to suspect problems.
d. always receive 100% PMI testing of weld and base metal
PMI of autogenous welds is:
always required.
never required.
not required if the weld rod was PMI tested.
not required if the base metal was PMI tested
aeoe
4 February 2013,APL 570 Certification Prep
API 578 Practice Questions
20.
21,
22.
Who has the responsibility to determine the extent of PMI testing required
on existing piping systems?
aoge
APL Authorized Inspector
Engineering Organization
Owner/User
Repair Organization
When prioritizing the need for PMI on existing piping systems, which of the
following is nota factor to consider?
pangs
Age of the facility
Consequence of failure
Likelihood of failure
Plant experience with inadvertent material substitutions
Reason for the alloy
Incorrect substitution of carbon steel is most likely to be found in:
aoge
chrome systems.
stainless systems.
any ferritic systems.
any non-ferrous systems.
24.
MSTS
paoge
Cc
Cr
Cu
Fe
Ni
Low silicon carbon steel can corrode rapidly when exposed to
aeoe
hydrogen-free sulfidation.
hydrogen-rich sulfidation,
hydrogen-free oxidation.
hydrogen-rich oxidation.
5 February 2013,APL 570 Certification Prep
API 578 Practice Questions
.
a «0.10%,
b. > 0.10%.
cc <0.25%,
dd. >0.25%.
26. The owner decides to conduct PMI testing on some existing piping systems.
Which of the following is a major factor in prioritizing the pipe?
a. The effectiveness of the construction & maintenance practices
b. The effectiveness of the inspection practices
cc. Age of the unit
d. Line size
27. Which of the following piping components is most likely to have a
substitution with the wrong material?
A 20’ length of 6 NPS pipe
Weld-neck flange
Expansion joint
Bolting
aoge
28. Which of the following piping components is most likely to have a
substitution with the wrong material?
A 10’ length of 6 NPS 316L SS pipe
6 NPS Gate valve
4.NPS Monel elbow
Slip-on flange
aoge
29. Who has the responsibility to determine the extent of PMT testing required
during repairs and alterations of piping systems?
APL 578 Authorized Inspector
Engineering Organization
Owner/User
Repair Organization
aeoe
MSTS 6 February 2013,APL 570 Certification Prep
API 578 Practice Questions
30.
31,
32
33,
34
MSTS
Who has the responsibility to evaluate the effectiveness of a PMI program
during repairs and alterations?
APL Authorized Inspector
Examiner
Owner/User
Piping Engineer
Repair Organization
paoge
During repairs and alterations the Owner should:
use NACE certified examiners.
have a written procedure describing their PMI program,
PMI test 100% of all materials.
PMI test 100% of all alloy materials.
aoge
PML testing at the warehouse is
done by only checking material stampings.
accomplished by the Authorized Inspector.
not important since materials will be checked during fabrication.
not an important part of the material verification program
not a substitute for PMI testing required during fabrication.
paoge
In the petrochemical industry, one common material mix-up problem occurs:
a. when temporarily removing spool pieces.
b. when sending pumps out for repair.
c. by using carbon steel in a 300 series stainless steel system
d. _ by using 300 series stainless steel in a carbon steel system
Identification of materials by visual stamps or markings:
a. is not an important part of the material verification program.
b. isnot a substitute for PMI testing.
c. _ is important only on high alloy materials.
d. should only be done by inspectors.
7 February 2013APL 570 Certification Prep
API 578 Practice Questions
35. How do portable X-Ray Fluorescence PMI tools work?
a. Radiation waves excite the materials and the material emits a
different spectrum of radiation that can be analyzed,
b. Radiation waves excite the materials and the material emits a
different spectrum of light that can be analyzed
c. Sound waves excite the materials and the material emits a
different spectrum of radiation that can be analyzed
d. Sound waves excite the materials and the material emits a
different spectrum of light that can be analyzed
36. PMI tools that use X-Ray fluorescence can not detect:
a. carbon
b. chrome.
c. iron,
d. molybdenum.
37. How does Portable Optical Emission Spectrometry determine the elements
ina material?
a. Anelectric arc causes a spectrum of light to be emitted from the
tested material. The light is analyzed
. An electric arc causes a spectrum of radiation to be emitted from
the tested material. The radiation is analyzed.
¢. X-rays striking the material cause a spectrum of radiation to be
emitted from the tested material. The radiation is analyzed.
d. Specific chemicals deposited on the tested material cause a
spectrum of colors to be emitted. The colors are analyzed.
e. The surface is polished and etched. A replication is preformed and
is analyzed with a microscope.
MSTS 8 February 2013,APL 570 Certification Prep
API 578 Practice Questions
38.
39.
40.
41,
MSTS
Chemical spot testing
is the fastest PMI technique.
provides an accurate way to determine the percentage of the types
of metals in the material.
uses droplets of acids or caustics that are placed on the component
Different colors indicated different materials
removes a small amount of surface metal that is placed ina filter
paper. Small droplets of reagents are used on the sample and
different colors indicated different materials.
m~pange
low chromes.
high chromes.
300 series stainless steels.
400 series stainless steels.
low chromes and 300 series stainless steels.
high chromes and 400 series stainless steels
PMI testing equipment should be:
aoge
calibrated every 4 hrs.
calibrated as specified by the manufacturer.
used only by the manufacturer's personnel.
used by owner/user personnel
All personnel performing PMI tests should be:
a.
b,
c.
d.
qualified by national exam.
qualified by the owner/user.
knowledgeable about the operation of the PMI test equipment.
knowledgeable about the operation of the plant where the PMI is
conducted.
9 February 2013,APL 570 Certification Prep
API 578 Practice Questions
42. Qualifications for personnel performing PMI testing should be submitted
and reviewed by:
APL.
ASNT.
the Authorized Inspection
the Owner/User.
the Piping Engineer
paoge
43. When PMI testing indicates that an alloy is outside the range allowed on the
material spec, the component can:
a. never be used.
b. be used if the alloy percentages exceed requirements.
c. be used in low risk piping systems.
d. _beused if accepted by the Owner/User following an assessment.
44. Analloy weld overlay is applied to carbon steel base metal. What will occur?
Cracking due to differential expansion rates
Dilution
Lack of Fusion
Underbead cracking
aoge
45. Analloy weld overlay is applied to carbon steel base metal. Who has the
responsibility to establish the minimum alloy requirements of the as-
deposited weld metal?
a, APL 570 Authorized Inspector
b. Engineering Organization
cc. Owner/User
d. Repair organization
46. What is the appropriate action to take when an incorrect material is located
during a PMI sampling of an inspection lot?
Inspect 2 more items from the inspection lot.
Inspect 50% of the items from the inspection lot.
Inspect 100% of the items from the inspection lot.
Inspection all items supplied by that manufacturer.
A more extensive inspection of the lot should be considered.
pance
MSTS 10 February 2013,APL 570 Certification Prep
API 578 Practice Questions
48.
49.
50.
51.
MSTS
a. ASME B31.3.
b. ASME 16.34.
c. NACE 3389.
d. PFIES22.
Identification of materials by color coding:
a. is not an important part of the material verification program.
b. is nota substitute for PMI testing,
c. _ is important only on high alloy materials.
d. should only be done by inspectors.
Which of the following is not required when the owner's PMI system
requires physical marking of components?
a. Whether the marking should remain legible for the component's life
b. The name of individual doing the marking
c. Tf colors are used, a description of color used for each alloy
Marking pens should not contain chlorides or:
a. Carbon.
b. Chrome.
c. Oxides.
d. Sulfur.
When PMI testing is conducted on a new piping system, the documentation
of the PMI results should be kept:
until the piping system is operational.
1 year.
until piping system is no longer in operation.
until piping system is removed/scrapped.
forever.
pangs
ul February 2013,APL 570 Certification Prep
API 578 Practice Questions
Study Guide Answers:
# Ans. Reference # Ans. Reference
1 b 1.0 33. a 443
2. a 1.0 34. ob BA
3. c 31 35. a 5.2.2
4, d 3.4 36. a 5.2.2
5. c 41 37. a 5.2.3
6 d 41 38. d 5.2.5.1
7 a 41 39. 5.2.5.2
8b 41 40. b 53
9 od 41 41 oc 55
10. a 411 42. d 55
11. c 4.21 43. d 6.1.
12. d 4.2.2 44. b 6.2
3. d 422 45. c 62
4c 424 %. ee 63
Be 425 47, d 7Ad
oc 426 48. b 711
7d 426 49. b 711/712
1. c | 4.2.61 50. dd 712b
19. d 4.2.6.2 BL od 74
20. ¢ 43.2
21a 43.3
22. a 43.31
23. d 4.3.3.2
24. a 43.3.4
25. a 4.3.3.4
26. a 4.3.3.5
27. od 4.3.4
28. b 4.3.4
29. ¢ 441
30. ¢ 441
31. 0«#b 441
32. 2 442
MSTS 12 February 2013,