0% found this document useful (0 votes)
172 views12 pages

API 570 Certification Prep - MSTS Training - Api-570-Certification-1

Uploaded by

kerem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
172 views12 pages

API 570 Certification Prep - MSTS Training - Api-570-Certification-1

Uploaded by

kerem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 12
APL 570 Certification Prep API 578 Practice Questions This following study aid helps you learn the content of API RP-578, Material Verification Program for New and Existing Alloy Piping Systems. There will be about 5 questions from this document on the API 570 exam, We do not spend class time on this publication. So it is important that you become familiar with this content in your personal study sessions. The questions in this study aid are in the same order as API 578. The answer key with references is in the back of this guide. It is helpful to read through API 578 before working on this exercise! (Questions in Vellow are Open Book Quester! MSTS API 578 provides guidelines for a material assurance system to verify: aoge all materials. all alloy materials. only non-ferrous materials. only high-alloy materials. The material verification program specified by API 578 covers a. only pressure-containing components. b. only pipe, and fittings. c. only pipe, fittings, and welds. d. _ pressure-containing and non-pressure containing components, An alloy material is any metallic material that contains alloying elements that are added: a. only to improve mechanical properties b. only to improve corrosion resistance. c. to improve either mechanical properties or corrosion resistance An inspection lot includes: aoge all materials from a common source. all materials included on the same purchase order. all materials of the same material type (i.e. 316 SS) all materials from a common source, of the same material type and same heat. 1 February 2013, APL 570 Certification Prep API 578 Practice Questions 5. For construction and repair activities a written material verification program should be established by the: a. API 570 Authorized Inspector. b. Engineering Organization cc. Owner/User. d. Repair Organization. 6. The material verification program should cover PMI testing of materials a. during construction of piping systems. b. _ in existing piping systems. cc. during repairs and alterations of piping systems d. _ inexisting piping systems and during construction, repairs and alterations of piping systems. 7. During repairs, random PMI sampling of new components is most appropriate for: a. low-risk piping systems. b. _ low alloy piping systems, ¢. stainless steel piping systems. d. ferritic steel piping systems. e. all piping systems. 8 Who has the responsibility to determine the extent of PMI performed? APL 570 Authorized Inspector Owner/User Piping Engineer Repair Organization aoge 9. During construction the Owner should consider 100% PMI of new components on: a. all piping systems. b. all alloys above P-5 c. exotic alloys d. high-risk piping systems. MSTS 2 February 2013, APL 570 Certification Prep API 578 Practice Questions a. Benzene b. Hydrofluoric acid (HF) cc. Sulfuric acid d. Wet hydrogen sulfide 11. Who is responsible to assure that the material verification program meets the guidelines of API 578? a. Authorized Inspector b. Examiner cc. Owner/User d. Piping Engineer 12. Who is responsibility to verify the adequacy of the material verification program that is performed by material suppliers? a. APL PMI Specialist b. Authorized Inspector c. Piping Engineer d. Owner/User 13, Who has the responsibility to review and approve the adequacy of the PMI program used by fabricators? a. API 570 Authorized Inspector b. API 578 Certified Inspector c. Engineering Organization d. Owner/User e. Repair Organization 14. A mill test report: eliminates the need for further material verification. is a report showing material discrepancies is an important part of the material qualify assurance program. is issued by the owner upon receipt of materials. aoge MSTS 3 February 2013, APL 570 Certification Prep API 578 Practice Questions MSTS During construction, which of the following alloy components does not need to be covered by a material verification program? Bolts Expansion Joints Gaskets Pressure containing welds All the above components need to be checked paoge During alloy welding a. one electrode from each pallet should be identified b. two electrodes from each pallet should be identified. c. one electrode from each lot or package should be identified. d. two electrodes from each lot or package should be identified. Tf alloy element(s) are contained in the flux of a welding electrode, PMI testing: a. is not necessary. b. _ isnot necessary provided appropriate documentation is provided by the supplier, ¢. could be conducted on any of the production welds. d. could be conducted on a “weld button” prior to production welds. New longitudinal welded alloyed pipe should: a. never be used. b. always receive random PMT testing of weld and base metal c. receive random PMI testing of weld and base metal if there is a reason to suspect problems. d. always receive 100% PMI testing of weld and base metal PMI of autogenous welds is: always required. never required. not required if the weld rod was PMI tested. not required if the base metal was PMI tested aeoe 4 February 2013, APL 570 Certification Prep API 578 Practice Questions 20. 21, 22. Who has the responsibility to determine the extent of PMI testing required on existing piping systems? aoge APL Authorized Inspector Engineering Organization Owner/User Repair Organization When prioritizing the need for PMI on existing piping systems, which of the following is nota factor to consider? pangs Age of the facility Consequence of failure Likelihood of failure Plant experience with inadvertent material substitutions Reason for the alloy Incorrect substitution of carbon steel is most likely to be found in: aoge chrome systems. stainless systems. any ferritic systems. any non-ferrous systems. 24. MSTS paoge Cc Cr Cu Fe Ni Low silicon carbon steel can corrode rapidly when exposed to aeoe hydrogen-free sulfidation. hydrogen-rich sulfidation, hydrogen-free oxidation. hydrogen-rich oxidation. 5 February 2013, APL 570 Certification Prep API 578 Practice Questions . a «0.10%, b. > 0.10%. cc <0.25%, dd. >0.25%. 26. The owner decides to conduct PMI testing on some existing piping systems. Which of the following is a major factor in prioritizing the pipe? a. The effectiveness of the construction & maintenance practices b. The effectiveness of the inspection practices cc. Age of the unit d. Line size 27. Which of the following piping components is most likely to have a substitution with the wrong material? A 20’ length of 6 NPS pipe Weld-neck flange Expansion joint Bolting aoge 28. Which of the following piping components is most likely to have a substitution with the wrong material? A 10’ length of 6 NPS 316L SS pipe 6 NPS Gate valve 4.NPS Monel elbow Slip-on flange aoge 29. Who has the responsibility to determine the extent of PMT testing required during repairs and alterations of piping systems? APL 578 Authorized Inspector Engineering Organization Owner/User Repair Organization aeoe MSTS 6 February 2013, APL 570 Certification Prep API 578 Practice Questions 30. 31, 32 33, 34 MSTS Who has the responsibility to evaluate the effectiveness of a PMI program during repairs and alterations? APL Authorized Inspector Examiner Owner/User Piping Engineer Repair Organization paoge During repairs and alterations the Owner should: use NACE certified examiners. have a written procedure describing their PMI program, PMI test 100% of all materials. PMI test 100% of all alloy materials. aoge PML testing at the warehouse is done by only checking material stampings. accomplished by the Authorized Inspector. not important since materials will be checked during fabrication. not an important part of the material verification program not a substitute for PMI testing required during fabrication. paoge In the petrochemical industry, one common material mix-up problem occurs: a. when temporarily removing spool pieces. b. when sending pumps out for repair. c. by using carbon steel in a 300 series stainless steel system d. _ by using 300 series stainless steel in a carbon steel system Identification of materials by visual stamps or markings: a. is not an important part of the material verification program. b. isnot a substitute for PMI testing. c. _ is important only on high alloy materials. d. should only be done by inspectors. 7 February 2013 APL 570 Certification Prep API 578 Practice Questions 35. How do portable X-Ray Fluorescence PMI tools work? a. Radiation waves excite the materials and the material emits a different spectrum of radiation that can be analyzed, b. Radiation waves excite the materials and the material emits a different spectrum of light that can be analyzed c. Sound waves excite the materials and the material emits a different spectrum of radiation that can be analyzed d. Sound waves excite the materials and the material emits a different spectrum of light that can be analyzed 36. PMI tools that use X-Ray fluorescence can not detect: a. carbon b. chrome. c. iron, d. molybdenum. 37. How does Portable Optical Emission Spectrometry determine the elements ina material? a. Anelectric arc causes a spectrum of light to be emitted from the tested material. The light is analyzed . An electric arc causes a spectrum of radiation to be emitted from the tested material. The radiation is analyzed. ¢. X-rays striking the material cause a spectrum of radiation to be emitted from the tested material. The radiation is analyzed. d. Specific chemicals deposited on the tested material cause a spectrum of colors to be emitted. The colors are analyzed. e. The surface is polished and etched. A replication is preformed and is analyzed with a microscope. MSTS 8 February 2013, APL 570 Certification Prep API 578 Practice Questions 38. 39. 40. 41, MSTS Chemical spot testing is the fastest PMI technique. provides an accurate way to determine the percentage of the types of metals in the material. uses droplets of acids or caustics that are placed on the component Different colors indicated different materials removes a small amount of surface metal that is placed ina filter paper. Small droplets of reagents are used on the sample and different colors indicated different materials. m~pange low chromes. high chromes. 300 series stainless steels. 400 series stainless steels. low chromes and 300 series stainless steels. high chromes and 400 series stainless steels PMI testing equipment should be: aoge calibrated every 4 hrs. calibrated as specified by the manufacturer. used only by the manufacturer's personnel. used by owner/user personnel All personnel performing PMI tests should be: a. b, c. d. qualified by national exam. qualified by the owner/user. knowledgeable about the operation of the PMI test equipment. knowledgeable about the operation of the plant where the PMI is conducted. 9 February 2013, APL 570 Certification Prep API 578 Practice Questions 42. Qualifications for personnel performing PMI testing should be submitted and reviewed by: APL. ASNT. the Authorized Inspection the Owner/User. the Piping Engineer paoge 43. When PMI testing indicates that an alloy is outside the range allowed on the material spec, the component can: a. never be used. b. be used if the alloy percentages exceed requirements. c. be used in low risk piping systems. d. _beused if accepted by the Owner/User following an assessment. 44. Analloy weld overlay is applied to carbon steel base metal. What will occur? Cracking due to differential expansion rates Dilution Lack of Fusion Underbead cracking aoge 45. Analloy weld overlay is applied to carbon steel base metal. Who has the responsibility to establish the minimum alloy requirements of the as- deposited weld metal? a, APL 570 Authorized Inspector b. Engineering Organization cc. Owner/User d. Repair organization 46. What is the appropriate action to take when an incorrect material is located during a PMI sampling of an inspection lot? Inspect 2 more items from the inspection lot. Inspect 50% of the items from the inspection lot. Inspect 100% of the items from the inspection lot. Inspection all items supplied by that manufacturer. A more extensive inspection of the lot should be considered. pance MSTS 10 February 2013, APL 570 Certification Prep API 578 Practice Questions 48. 49. 50. 51. MSTS a. ASME B31.3. b. ASME 16.34. c. NACE 3389. d. PFIES22. Identification of materials by color coding: a. is not an important part of the material verification program. b. is nota substitute for PMI testing, c. _ is important only on high alloy materials. d. should only be done by inspectors. Which of the following is not required when the owner's PMI system requires physical marking of components? a. Whether the marking should remain legible for the component's life b. The name of individual doing the marking c. Tf colors are used, a description of color used for each alloy Marking pens should not contain chlorides or: a. Carbon. b. Chrome. c. Oxides. d. Sulfur. When PMI testing is conducted on a new piping system, the documentation of the PMI results should be kept: until the piping system is operational. 1 year. until piping system is no longer in operation. until piping system is removed/scrapped. forever. pangs ul February 2013, APL 570 Certification Prep API 578 Practice Questions Study Guide Answers: # Ans. Reference # Ans. Reference 1 b 1.0 33. a 443 2. a 1.0 34. ob BA 3. c 31 35. a 5.2.2 4, d 3.4 36. a 5.2.2 5. c 41 37. a 5.2.3 6 d 41 38. d 5.2.5.1 7 a 41 39. 5.2.5.2 8b 41 40. b 53 9 od 41 41 oc 55 10. a 411 42. d 55 11. c 4.21 43. d 6.1. 12. d 4.2.2 44. b 6.2 3. d 422 45. c 62 4c 424 %. ee 63 Be 425 47, d 7Ad oc 426 48. b 711 7d 426 49. b 711/712 1. c | 4.2.61 50. dd 712b 19. d 4.2.6.2 BL od 74 20. ¢ 43.2 21a 43.3 22. a 43.31 23. d 4.3.3.2 24. a 43.3.4 25. a 4.3.3.4 26. a 4.3.3.5 27. od 4.3.4 28. b 4.3.4 29. ¢ 441 30. ¢ 441 31. 0«#b 441 32. 2 442 MSTS 12 February 2013,

You might also like