Procedure Manual - IMS: Locomotive Workshop, Northern Railway, Lucknow

This procedure outlines requirements for preserving raw materials, products, and other key outputs at Locomotive Workshop, Northern Railway in Lucknow, India. The SSE In-charge is responsible for implementing and managing the procedure. Specific handling, storage, packaging and preservation requirements are defined to prevent damage during transit and protect materials from weather conditions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
223 views2 pages

Procedure Manual - IMS: Locomotive Workshop, Northern Railway, Lucknow

This procedure outlines requirements for preserving raw materials, products, and other key outputs at Locomotive Workshop, Northern Railway in Lucknow, India. The SSE In-charge is responsible for implementing and managing the procedure. Specific handling, storage, packaging and preservation requirements are defined to prevent damage during transit and protect materials from weather conditions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

LOCOMOTIVE WORKSHOP, NORTHERN RAILWAY, LUCKNOW

Procedure Manual - IMS DOC. NO. : PM/LW/SMT/13

ISO 9001:2015, ISO 14001:2015 & ISSUE/REV NO.-1/0Date : 15-09-2019

ISO 45001: 2018

Procedure: Preservation Procedure


1. SUMMARY

1.1. This procedure defines the requirements for preserving and protecting product, raw materials,
or other key process outputs.
1.2. The SSE In-charge is responsible for implementation and management of this procedure.
2. REVISION AND APPROVAL

Rev. Date Nature of Changes Approved By


[Rev [Procedure
[Date of
Number Original issue. Approver
Issue]
] Name]

3. HANDLING & LABELING

3.1. Proper handling of all documents and other materials is performed.


3.2. Specific handling requirements for operations will be defined in the appropriate work
instructions, as per Customer, where applicable.
3.3. Customer-mandated handling requirements have been defined on the order documentation.
3.4. Labeling of special handling requirements (such as hazard warnings) will be utilized as
required.
4. STORAGE & PROTECTION

4.1. All documents are stored in a manner that prevents nonconformance. Location Matrix has
been drawn and the material is kept in marked location
4.2. Locomotive Workshop, Northern Railway, Charbagh, Lucknow follows all the instruction as
mentioned by the client for the project activities.
4.3. The Factory Manager reviews any recurrent material damage linked to currently approved
protection methods to ensure changes are made to properly protect materials.

Page 1 of 2
LOCOMOTIVE WORKSHOP, NORTHERN RAILWAY, LUCKNOW

Procedure Manual - IMS DOC. NO. : PM/LW/SMT/13

ISO 9001:2015, ISO 14001:2015 & ISSUE/REV NO.-1/0Date : 15-09-2019

ISO 45001: 2018

4.4. Material is stacked to prevent damage from contact with other parts or crushing or falling. If
required, material is used to separate from other material to prevent damage.
4.5. Special safety is taken by wearing protective gloves, Safety shoes and Helmets during
Handling.
4.6. All parts and materials are protected from weather conditions that could adversely affect them.
5. PACKAGING

5.1. Good accepted packaging practices that maintain product conformance and integrity through
delivery are Maintained as received. Customer-mandated packaging requirements are
captured and utilized when required.
6. PRESERVATION DURING TRANSIT

6.1. Product is suitably maintained during project to prevent nonconformance.

Page 2 of 2