Program of Works Sample

The document provides a program of works listing various construction items, quantities, and units. It includes the construction of a field office, survey and staking, signboards, earthworks like clearing, excavation and embankment, subbase and pavement works, a 1 unit RCDG bridge including excavation, concrete, rebar, and railings, drainage structures like culverts and canals, slope protection, guardrails, signs, and pavement markings. The program of works contains detailed information to guide the implementation of a road construction project.

Uploaded by

miki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
876 views1 page

Program of Works Sample

The document provides a program of works listing various construction items, quantities, and units. It includes the construction of a field office, survey and staking, signboards, earthworks like clearing, excavation and embankment, subbase and pavement works, a 1 unit RCDG bridge including excavation, concrete, rebar, and railings, drainage structures like culverts and canals, slope protection, guardrails, signs, and pavement markings. The program of works contains detailed information to guide the implementation of a road construction project.

Uploaded by

miki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROGRAM OF WORKS

Item No. Scope of Work Quantity Unit


PART A FACILITIES FOR THE ENGINEER
A.1.1 (3) Construction of Field Office for the Engineer, (6m x 6m) 1.00 Lump sum
PART B OTHER GENERAL REQUIREMENTS
B.4(1) Construction Survey & Staking 1.70 km.
B.9 MOBILIZATION & DEMOBILIZATION 1.00 Lump Sum
B.5 Project Billboard/ Signboard 2.00 Each
PART C EARTHWORKS
100 (1) CLEARING AND GRUBBING 0.34 Has.
100 (3) a1 INDIVIDUAL REMOVAL OF TREES (150 - 300 mm ø) - small 124.00 Each
101 (3) b1 Removal of Actual Structures/Obstruction (0.15 m thick - PCCP) 626.60 sq.m.
102 (2) SURPLUS COMMON EXCAVATION 11,298.30 cu.m.
104 (1) a Embankment from roadway excavation (Common Soil) 6,258.79 cu.m.
105 (1) a SUBGRADE PREPARATION (COMMON MATERIAL) 5,103.00 sq.m.
PART D SUBBASE AND BASE COURSE
200 (1) Aggregate Subbase Course 4,213.36 cu.m.
PART E SURFACE COURSES
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced), 0.20 m thick - 14 days 11,479.41 sq.m.
PART F 1 UNIT RCDG BRIDGE (18.00 METERS)
103 (2) a Bridge Excavation (Common Soil) 225.12 cu.m.
103 (3) FOUNDATION FILL 121.94 cu.m
103 (5) a Shoring, cribbing and related works (Shoring) 1.00 lumpsum
103 (5) b Shoring, cribbing and related works (Cribbing) 1.00 lumpsum
311 (2) e1 Portland Cement Concrete Pavement (Reinforced), 0.28 m thick - 14 days 59.04 sq.m.
401 (2) a Concrete Railing (Standard) 36.00 mtrs
404 (1) a REINFORCING STEEL (Grade 40) 1,942.79 kgs.
404 (1) b REINFORCING STEEL (Grade 60) 44,145.03 kgs.
405 (1) b3 STRUCTURAL CONCRETE, CLASS A (27.58 Mpa - 28 days) 200.16 cu.m.
407 (8) LEAN CONCRETE, Class B (16.5 Mpa) 0.42 cu.m.
506 (1) STONE MASONRY 155.95 cu.m.
PART G-1 DRAINAGE & SLOPE PROTECTION STRUCTURES (PIPE CULVERT)
101 (4) a3 Removal of Actual Structures/Obstruction, (910mmø RCPC) 28.00 ln.m.
101 (4) a5 Removal of Actual Structures/Obstruction, (1220mmø RCPC) 14.00 ln.m.
101 (4) a6 Removal of Actual Structures/Obstruction, (1520mmø RCPC) 7.00 ln.m.
103 (6) a Pipe culverts and drain excavation (Common Soil) 301.92 cu.m.
103 (1) a Structure Excavation (Common Soil) 36.36 cu.m.
103 (3) FOUNDATION FILL 15.80 cu.m
500 (1) a3 PIPE CULVERTS, 910 mm. ø (CLASS II RCPC) 60.00 ln.m.
500 (1) a6 PIPE CULVERTS, 1520 mm. ø (CLASS II RCPC) 10.00 ln.m.
506 (1) Stone Masonry 83.01 cu.m.
PART G-2 DRAINAGE & SLOPE PROTECTION STRUCTURES (LINE CANAL)
103 (1) a Structure Excavation (Common Soil) 248.40 cu.m.
405 (2) d STRUCTURAL CONCRETE, CLASS B (16.50 Mpa) 42.27 cu.m.
506 (1) Stone Masonry 73.78 cu.m.
PART G-3 DRAINAGE & SLOPE PROTECTION STRUCTURES (SLOPE PROTECTION)
103 (1) a Structure Excavation (Common Soil) 56.86 cu.m.
505 (2) a Grouted Riprap , Class A 285.50 cu.m.
PART H MISCELLANEOUS STRUCTURES
603 (3) a1 METAL GUARDRAIL (METAL BEAM) Including POST, (Single, W-Beam) 160.02 Ln.m.
603 (4) a METAL BEAM END PIECE (Fish Tail) 8.00 each
605 (1) c3 WARNING SIGNS (900 mm, W1-3C) 4.00 each
605 (1) ar1 WARNING SIGNS ( 600 mm x 400 mm , W8-1A) 1.00 each
606 (1) a1 PAVEMENT MARKINGS (Premixed Reflectorized - White) 420.55 sq.m.
605 (6) e1 HAZARD MARKERS (450x600mm - CHEVRON SIGNS ) 26.00 each