Question Results
Score 0 of 1
Question:
An organization has experienced several incidents of extended network outages that have exceeded
tolerance. Which of the following should be the risk practitioner’s FIRST step to address this situation?
Response:
Score 0 of 1
Question:
In the project initiation phase of System Development Life Cycle, there is information on project
initiated by which of the following role carriers?
Response:
CRO
CIO
Business management
Sponsor
Score 1 of 1
Question:
Security measures implemented to ensure that processes are performed to a certain standard, degree,
or depth are called __________.
Response:
Requirements
Risks
Controls
Objectives
Score 0 of 1
Question:
The __________ framework is not IT security–centric and was developed with organizational
governance in mind.
Response:
COBIT
CRISC
Score 1 of 1
Question:
When determining which control deficiencies are most significant, which of the following would provide
the MOST useful information?
Response:
Benchmarking assessments
Score 1 of 1
Question:
Risk analysis should address the potential size and likelihood of loss.
Risk analysis should assume an equal degree of protection for all assets.
Risk analysis should give more weight to the likelihood than the size of loss.
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
Which of the following is the process of numerically analyzing the effects of identified risks on the
overall enterprise's objectives?
Response:
Identifying Risks
Score 0 of 1
Question:
Which of the following would be the BEST way to help ensure the effectiveness of a data loss prevention
(DLP) control that has been implemented to prevent the loss of credit card data?
Response:
Score 1 of 1
Question:
What process would help you deal with risks that require an exemption to policy?
Response:
Score 0 of 1
Question:
You are the project manager of RFT project. You have identified a risk that the enterprise's IT system and
application landscape is so complex that, within a few years, extending capacity will become difficult and
maintaining software will become very expensive.
To overcome this risk the response adopted is re-architecture of the existing system and purchase of
new integrated system. In which of the following risk prioritization options would this case be
categorized?
Response:
Deferrals
Quick win
Contagious risk
Score 1 of 1
Question:
Response:
Mitigation
Transference
Sharing
Exploiting
Score 1 of 1
Question:
Response:
Risk mitigation
Risk management
Risk analysis
Risk monitoring
Score 0 of 1
Question:
Which of the following risks is the risk that happen with an important business partner and affects a
large group of enterprises within an area or industry?
Response:
Operational risk
Reporting risk
Contagious risk
Systemic risk
Score 1 of 1
Question:
Which of the following is a performance measure that is used to evaluate the efficiency of an investment
or to compare the efficiency of a number of different investments?
Response:
Return On Investment
Score 1 of 1
Question:
FISMA requires federal agencies to protect IT systems and data. How often should compliance be
audited by an external organization?
Response:
Never
Annually
Quarterly
Score 0 of 1
Question:
Which of the following items is considered as an objective of the three dimensional model within the
framework described in COSO ERM?
Response:
Monitoring
Risk assessment
Financial reporting
Control environment
Score 1 of 1
Question:
Which of the following risk responses include feedback and guidance from well-qualified risk officials
and those internal to the project?
Response:
Risk Acceptance
Expert judgment
Risk transfer
Score 1 of 1
Question:
Which of the following control is used to ensure that users have the rights and permissions they need to
perform their jobs, and no more?
Response:
Access control
Score 0 of 1
Question:
You are the project manager of GHT project. You have applied certain control to prevent the
unauthorized changes in your project. Which of the following control you would have applied for this
purpose?
Response:
Access control
Score 1 of 1
Question:
Which of the following controls do NOT come under technical class of control?
Response:
Access Control
Score 0 of 1
Question:
Response:
ISA 62443-3-3:2013
ISO/IEC 15408
COBIT 5
Question:
Response:
Integrity of data
Confidentiality of data
Availability of data
Reliability of data
Score 0 of 1
Question:
Response:
Deterrent control
Preventative control
Detective control
Compensation control
Score 0 of 1
Question:
Which of the following regulations requires a formalized risk management program in order to protect
electronic patient health information?
Response:
PCI-DSS
HIPAA
GLBA
FISMA
Score 1 of 1
Question:
For which of the following risk management capability maturity levels do the statement given below is
true?
"Real-time monitoring of risk events and control exceptions exists, as does automation of policy
management"
Response:
Level 5
Level 0
Level 2
Level 3
Score 0 of 1
Question:
Which of the following controls focuses on operational efficiency in a functional area sticking to
management policies?
Response:
Administrative control
Detective control
Operational control
Score 1 of 1
Question:
Response:
The lack of any significant differences between perpetual levels and actual levels of goods.
Reports that show orders that were rejected for credit limitations.
Reports that provide information about any unusual deviations and individual product margins.
Score 1 of 1
Question:
The BEST way to determine the likelihood of a system availability risk scenario is by assessing the:
Response:
Score 1 of 1
Question:
You are the risk professional of your enterprise. You need to calculate potential revenue loss if a certain
risks occurs.
Your enterprise has an electronic (e-commerce) web site that is producing US $1 million of revenue each
day, then if a denial of service (DoS) attack occurs that lasts half a day creates how much loss?
Response:
US $1 million loss
US $100,000 loss
US $500,000 loss
US $250,000 loss
Score 1 of 1
Question:
Which of the following are the security plans adopted by the organization?
Each correct answer represents a complete solution. Choose all that apply.
Response:
Backup plan
Score 0 of 1
Question:
Response:
Automated tools
RMIS
Manual control
Segregation of duties
Score 0 of 1
Question:
Which the following collects information about different actors and negative events that could exploit
the vulnerabilities in a system?
Response:
Threat assessment
Compliance assessment
Penetration test
Vulnerability assessment
Score 1 of 1
Question:
Which of the following will significantly affect the standard information security governance model?
Response:
Number of employees
Score 0 of 1
Question:
For the first time, the procurement department has requested that IT grant remote access to third-party
suppliers. Which of the following is the BEST course of action for IT in responding to the request?
Response:
Score 0 of 1
Question:
Which of the following is the BEST metric to demonstrate the effectiveness of an organization’s change
management process?
Response:
Score 1 of 1
Question:
Which of the following management and governance frameworks incorporates both the Risk IT
Framework and the Val IT framework?
Response:
NIST SP 800-53
ISO/IEC 27001
COBIT 5
Score 0 of 1
Question:
Response:
Permissions on a sensitive network share that allow all users to read the contents
A firewall that successfully blocks all traffic except for that specifically allowed
Score 0 of 1
Question:
Which of the following provides the BEST measurement of an organization’s risk management maturity
level?
Response:
Score 1 of 1
Question:
Which of the following establishes mandatory rules, specifications and metrics used to measure
compliance against quality, value, etc?
Response:
Framework
Standard
Practices
Legal requirements
Score 1 of 1
Question:
Which of the following should be the MOST important consideration when determining controls
necessary for a highly critical information system?
Response:
Score 0 of 1
Question:
All of the following are valid supporting factors in building a business case to justify implementing an IT
control, except which one?
Response:
Security goals
Profitability
Governance
Liability
Score 0 of 1
Question:
Which of the following is a vulnerability associated with the integrity aspect of data management?
Response:
Lack of encryption for sensitive data being transferred between two systems
Faulty backup processes that do not completely back up all sensitive data
Score 1 of 1
Question:
Which of the following frameworks might be used in business governance and IT enterprise
management?
Response:
NIST RMF
ISO 27001
COBIT
Score 1 of 1
Question:
Wendy is about to perform qualitative risk analysis on the identified risks within her project. Which one
of the following will NOT help Wendy to perform this project management activity?
Response:
Stakeholder register
Risk register
Score 0 of 1
Question:
The best way to test the operational effectiveness of a data backup procedure is to:
Response:
Score 1 of 1
Question:
You are the project manager of GHT project. You have identified a risk event on your current project
that could save $670,000 in project costs if it occurs.
Your organization is considering hiring a vendor to help establish proper project management
techniques in order to assure it realizes these savings.
Response:
This is a risk event that should be shared to take full advantage of the potential savings.
This risk event should be accepted because the rewards outweigh the threat to the project.
Score 1 of 1
Question:
You are the project manager of HWD project. It requires installation of some electrical machines. You
and the project team decided to hire an electrician as electrical work can be too dangerous to perform.
Response:
Mitigation
Acceptance
Transference
Avoidance
Score 0 of 1
Question:
You are the project manager for GHT project. You need to perform the Qualitative risk analysis process.
When you have completed this process, you will produce all of the following as part of the risk register
update output except which one?
Response:
Score 0 of 1
Question:
How can ISSE processes assist the control design and implementation process?
Response:
Score 0 of 1
(skipped)
Question:
You are completing the qualitative risk analysis process with your project team and are relying on the
risk management plan to help you determine the budget, schedule for risk management, and risk
categories.
You discover that the risk categories have not been created. When the risk categories should have been
created?
Response:
Score 0 of 1
(skipped)
Question:
A business wants to look at expanding into a developing country where the risks are high along with the
rewards. The business needs to understand which of the following?
(Choose two.)
Response:
Risk response
Risk tolerance
Risk appetite
Risk strategy
Score 0 of 1
(skipped)
Question:
Response:
Risk avoidance
Risk acceptance
Risk prediction
Risk transference
Score 0 of 1
(skipped)
Question:
Which is the MOST important parameter while selecting appropriate risk response?
Response:
Cost of response
Importance of risk
Efficiency of response
Score 0 of 1
(skipped)
Question:
__________ are designed to exploit weaknesses on a system.
Response:
Threat assessments
Penetration tests
Vulnerability assessments
White-box tests
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Which of the following would be considered a direct internal threat to the IT operations management
business process?
Response:
Outside hacker
Market fluctuations
Question:
Which of the following is the MOST effective way to incorporate stakeholder concerns when developing
risk scenarios?
Response:
Score 0 of 1
(skipped)
Question:
Which of the following is the GREATEST advantage of implementing a risk management program?
Response:
Score 0 of 1
(skipped)
Question:
You are the project manager of your enterprise. While performing risk management, you are given a
task to identify where your enterprise stand in certain practice and also to suggest the priorities for
improvements.
Which of the following models would you use to accomplish this task?
Response:
Capability maturity model
Fishbone model
Score 0 of 1
(skipped)
Question:
__________ are considered to be highly probable indicators designed to accurately predict important
levels of risk based on defined thresholds.
Response:
Score 0 of 1
(skipped)
Question:
You are the project manager of GHT project. You and your team have developed risk responses for those
risks with the highest threat to or best opportunity for the project objectives.
What are the immediate steps you should follow, after planning for risk response process?
Response:
Applying controls
Score 0 of 1
(skipped)
Question:
Which of the following are two elements that are critical in risk scenario development?
(Choose two.)
Response:
Likelihood calculation
Impact calculation
Threat assessment
Score 0 of 1
(skipped)
Question:
Response:
NIST SP 800-53
COBIT
PCI-DSS
ISA 62443-2-1:2009
Score 0 of 1
(skipped)
Question:
Your business just went through a major storm that flooded your data center. Members of your
recovery team are attempting to salvage equipment, as well as locate critical data backups.
No one seems to know exactly what they’re supposed to do, and they don’t have the right equipment
available to them. Additionally, there is no coordinated effort within the team to perform specific tasks.
Which of the following vulnerabilities most likely led up to this scenario?
Response:
Score 0 of 1
(skipped)
Question:
Which of the following characteristics of risk controls answers the aspect about the control given below:
"Will it continue to function as expressed over the time and adopts as changes or new elements are
introduced to the environment"
Response:
Reliability
Sustainability
Consistency
Distinct
Score 0 of 1
(skipped)
Question:
Which of the following vulnerability assessment software can check for weak passwords on the
network?
Response:
Password cracker
Antivirus software
Anti-spyware software
Wireshark
Score 0 of 1
(skipped)
Question:
Which of the following would be considered primary stakeholders with regard to risk scenario
development?
Response:
Accounting executives
Vendors
Asset managers
Score 0 of 1
(skipped)
Question:
You are the project manager of GHT project. Your project team is in the process of identifying project
risks on your current project. The team has the option to use all of the following tools and techniques to
diagram some of these potential risks EXCEPT for which one?
Response:
Process flowchart
Ishikawa diagram
Influence diagram
Score 0 of 1
(skipped)
Question:
What type of policy would an organization use to forbid its employees from using organizational email
for personal use?
Response:
Anti-harassment policy
Privacy policy
Score 0 of 1
(skipped)
Question:
What is the open source alternative for thorough and practical security testing?
Response:
NIST 800-64
NIST 800-115
ISACA COBIT
OSSTMM
Score 0 of 1
(skipped)
Question:
Which of the following is the MOST important benefit of key risk indicators (KRIs)?
Response:
Score 0 of 1
(skipped)
Question:
Which of the following is BEST described by the definition below?
"They are heavy influencers of the likelihood and impact of risk scenarios and should be taken into
account during every risk analysis, when likelihood and impact are assessed."
Response:
Obscure risk
Risk factors
Risk analysis
Risk event
Score 0 of 1
(skipped)
Question:
The analysis of which of the following will BEST help validate whether suspicious network activity is
malicious?
Response:
Bottom of Form
Question Results
Score 1 of 1
Question:
Which of the following would be an IT business owner’s BEST course of action following
an unexpected increase in emergency changes?
Response:
Question:
An organization that has been the subject of multiple social engineering attacks is
developing a risk awareness program. The PRIMARY goal of this program should be to:
Response:
Question:
You work as a project manager for Bluewell Inc. You have identified a project risk. You
have then implemented the risk action plan and it turn out to be non-effective. What type
of plan you should implement in such case?
Response:
Risk mitigation
Risk response plan
Risk fallback plan
Risk avoidance
Score 0 of 1
(skipped)
Question:
Jim wants to conduct a scan using a tool that can be used during business hours with
minimum disturbance to operations. Which is the most likely to support his needs?
Response:
Active tools
Impact tools
Penetration tools
Passive tools
Score 1 of 1
Question:
When an organization’s disaster recovery plan has a reciprocal agreement, which of the
following risk treatment options is being applied?
Response:
Mitigation
Avoidance
Acceptance
Transfer
Score 1 of 1
Question:
Which of the following is the BEST way to confirm whether appropriate automated
controls are in place within a recently implemented system?
Response:
Question:
You are implementing an organizational-wide risk management strategy, and you are
using the NIST Risk Management Framework (RMF). You have just completed step 1 of
the RMF, categorize information systems.
Which of the following steps should you complete next in the RMF sequence?
Response:
Authorize system
Assess security controls
Continuous monitoring
Select security controls
Score 1 of 1
Question:
Which of the following is a vulnerability associated with the integrity aspect of data
management?
Response:
Lack of encryption for sensitive data being transferred between two systems
Failure of a DBMS to perform transaction checking on data
Faulty backup processes that do not completely back up all sensitive data
Failure to assign correct permissions to sensitive tables in a database
Score 1 of 1
Question:
Which of the following is a vulnerability that affects the business processes that deal with
third-party providers?
Response:
Question:
Response:
Impact matrix
Risk indicator matrix
Probability matrix
Risk scenario matrix
Score 1 of 1
Question:
In which of the following risk management capability maturity levels does the enterprise
takes major business decisions considering the probability of loss and the probability of
reward?
Response:
Level 5
Level 2
Level 4
Level 0
Score 0 of 1
Question:
Which of the following nodes of the decision tree analysis represents the start point of
decision tree?
Response:
Decision node
Event node
Root node
End node
Score 1 of 1
Question:
Response:
Infinity
10
0
1
Score 1 of 1
Question:
FISMA requires federal agencies to protect IT systems and data. How often should
compliance be audited by an external organization?
Response:
Question:
As a risk practitioner in a larger organization, you have been asked to review the
company’s SDLC model for potential risk areas.
The model includes the Requirements, Design, Development, Implementation, and Disposal
phases. Software and systems are moved from the development environment immediately
into the production environment and implemented.
Which SDLC phase would you recommend that the business add to reduce risk of
integration or functionality issues as the system is implemented?
Response:
Initiation
Maintenance
Sustainment
Test
Score 1 of 1
Question:
You are the project manager of the QPS project. You and your project team have
identified a pure risk. You along with the key stakeholders, decided to remove the pure risk
from the project by changing the project plan altogether.
Response:
It is a risk event that only has a negative side and not any positive result.
It is a risk event that cannot be avoided because of the order of the work.
It is a risk event that is created by the application of risk response.
It is a risk event that is generated due to errors or omission in the project work.
Score 1 of 1
Question:
You are the project manager of GHT project. You have identified a risk event on your
project that could save $100,000 in project costs if it occurs. Which of the following
statements BEST describes this risk event?
Response:
This is a risk event that should be accepted because the rewards outweigh the threat
to the project.
This risk event is an opportunity to the project and should be exploited.
This risk event should be mitigated to take advantage of the savings.
This risk event should be avoided to take full advantage of the potential savings.
Score 1 of 1
Question:
Which of the following is the MOST important factor affecting risk management in an
organization?
Response:
Question:
Which of the following is the BEST course of action to reduce risk impact?
Response:
Question:
You are the project manager of GFT project. Your project involves the use of electrical
motor. It was stated in its specification that if its temperature would increase to 500 degree
Fahrenheit the machine will overheat and have to be shut down for 48 hours.
If the machine overheats even once it will delay the project's arrival date. So to prevent this
you have decided while creating response that if the temperature of the machine reach 450,
the machine will be paused for at least an hour so as to normalize its temperature.
Response:
Risk trigger
Risk event
Risk response
Risk identification
Score 1 of 1
Question:
What process would help you deal with risks that require an exemption to policy?
Response:
Question:
Response:
Enabling risk-based decision making
Better understanding of the risk appetite
Increasing process control efficiencies
Improving audit results
Score 0 of 1
Question:
Improvements in the design and implementation of a control will MOST likely result in an
update to:
Response:
inherent risk
risk tolerance
residual risk
risk appetite
Score 1 of 1
Question:
You are the project manager of GHT project. You are performing cost and benefit analysis
of control. You come across the result that costs of specific controls exceed the benefits of
mitigating a given risk.
Response:
Question:
An enterprise has identified risk events in a project. While responding to these identified
risk events, which among the following stakeholders is MOST important for reviewing risk
response options to an IT risk.
Response:
Internal auditors
Business managers
Question:
Which of the following would be considered primary stakeholders with regard to risk
scenario development?
Response:
Asset managers
Accounting executives
Production control managers
Vendors
Score 0 of 1
Question:
Response:
Question:
Jane, the Director of Sales, contacts you and demands that you add a new feature to the
software your project team is creating for the organization. In the meeting she tells you
how important the scope change would be.
You explain to her that the software is almost finished and adding a change now could
cause the deliverable to be late, cost additional funds, and would probably introduce new
risks to the project. Jane stands up and says to you, "I am the Director of Sales and this
change will happen in the project." And then she leaves the room.
What should you do with this verbal demand for a change in the project?
Response:
Question:
You work as a project manager for BlueWell Inc. You are preparing for the risk
identification process.
You will need to involve several of the project's key stakeholders to help you identify and
communicate the identified risk events. You will also need several documents to help you
and the stakeholders identify the risk events.
Which one of the following is NOT a document that will help you identify and
communicate risks within the project?
Response:
Stakeholder registers
Activity duration estimates
Activity cost estimates
Risk register
Score 0 of 1
(skipped)
Question:
You work as a project manager for BlueWell Inc. You are preparing to plan risk responses
for your project with your team. How many risk response types are available for a negative
risk event in the project?
Response:
5
7
1
4
Score 0 of 1
(skipped)
Question:
Which of the following assets are the examples of intangible assets of an enterprise?
Each correct answer represents a complete solution. Choose two.
Response:
Customer trust
Information
People
Infrastructure
Score 0 of 1
(skipped)
Question:
Which of the following risk responses include feedback and guidance from well-qualified
risk officials and those internal to the project?
Response:
Question:
Response:
Question:
Response:
Question:
Response:
Question:
You work as a Project Manager for www.company.com Inc. You have to measure the
probability, impact, and risk exposure. Then, you have to measure how the selected risk
response can affect the probability and impact of the selected risk event.
Which of the following tools will help you to accomplish the task?
Response:
Project network diagrams
Delphi technique
Decision tree analysis
Cause-and-effect diagrams
Score 0 of 1
(skipped)
Question:
Which of the following are concerns with the IT infrastructure in terms of how it affects
risk scenarios?
(Choose all that apply.)
Response:
Level of modernization
Level of performance
Internal and external interfaces and connections
Cost
Score 0 of 1
(skipped)
Question:
Which of the following parameters are considered for the selection of risk indicators?
Each correct answer represents a part of the solution. Choose three.
Response:
Question:
One of the risk events you've identified is classified as force majeure. What risk response is
likely to be used?
Response:
Acceptance
Transference
Enhance
Mitigation
Score 0 of 1
(skipped)
Question:
A __________ is dedicated hardware or software that collects network traffic for the
purposes of examination, either to determine network issues or to capture plain-text
usernames, passwords, or other sensitive information being sent in the clear.
Response:
Port scanner
Protocol analyzer
Vulnerability scanner
Penetration tester
Score 0 of 1
(skipped)
Question:
Response:
Question:
For a negative event or action to materialize and cause risk to an organization or system,
what other factor must be present?
Response:
Risk factor
Vulnerability
Threat agent
Threat
Score 0 of 1
(skipped)
Question:
The risk event is determined to have significant impact but a low probability in the project.
Should the risk event happen it'll cause the project to be delayed by three weeks, which will
cause new risk in the project.
Response:
Question:
Mike is the project manager of the NNP Project for his organization. He is working with
his project team to plan the risk responses for the NNP Project. Mike would like the
project team to work together on establishing risk thresholds in the project.
Response:
Question:
Risk scenarios are all the elements of risk, except for __________ and __________.
(Choose two.)
Response:
Threat
Likelihood
Impact
Vulnerability
Score 0 of 1
(skipped)
Question:
A risk practitioner has observed that risk owners have approved a high number of
exceptions to the information security policy. Which of the following should be the risk
practitioner’s GREATEST concern?
Response:
Question:
You are working as the project manager of the ABS project. The project is for establishing
a computer network in a school premises.
During the project execution, the school management asks to make the campus Wi-Fi
enabled. You know that this may impact the project adversely. You have discussed the
change request with other stakeholders.
Question:
Response:
Question:
Your project spans the entire organization. You would like to assess the risk of your
project but worried about that some of the managers involved in the project could affect
the outcome of any risk identification meeting.
Your consideration is based on the fact that some employees would not want to publicly
identify risk events that could declare their supervision as poor. You would like a method
that would allow participants to anonymously identify risk events.
Response:
Delphi technique
Root cause analysis
Isolated pilot groups
SWOT analysis
Score 0 of 1
(skipped)
Question:
Which of the following business requirements MOST relates to the need for resilient
business and information systems processes?
Response:
Confidentiality
Effectiveness
Integrity
Availability
Score 0 of 1
(skipped)
Question:
John is the project manager of the NHQ Project for his company. His project has 75
stakeholders, some of which are external to the organization. John needs to make certain
that he communicates about risk in the most appropriate method for the external
stakeholders.
Which project management plan will be the best guide for John to communicate to the
external stakeholders?
Response:
Question:
During qualitative risk analysis you want to define the risk urgency assessment. All of the
following are indicators of risk priority except for which one?
Response:
Warning signs
Symptoms
Risk rating
Cost of the project
Score 0 of 1
(skipped)
Question:
The Identify Risk process determines the risks that affect the project and document their
characteristics. Why should the project team members be involved in the Identify Risk
process?
Response:
They are the individuals that will most likely cause and respond to the risk events.
They are the individuals that will have the best responses for identified risks events
within the project.
They are the individuals that are most affected by the risk events.
They are the individuals that will need a sense of ownership and responsibility for
the risk events.
Score 0 of 1
(skipped)
Question:
Response:
Question:
An organization has outsourced its lease payment process to a service provider who lacks
evidence of compliance with a necessary regulatory standard. Which risk treatment was
adopted by the organization?
Response:
Acceptance
Transfer
Mitigation
Avoidance
Score 0 of 1
(skipped)
Question:
Response:
Question:
An organization has granted a vendor access to its data in order to analyze customer
behavior. Which of the following would be the MOST effective control to mitigate the risk
of customer data leakage?
Response:
Question:
Which of the following role carriers will decide the Key Risk Indicator of the enterprise?
Each correct answer represents a part of the solution. Choose two.
Response:
Business leaders
Senior management
Human resource
Chief financial officer
Score 0 of 1
(skipped)
Question:
You are the project manager of the GHY Project for your company. You need to complete
a project management process that will be on the lookout for new risks, changing risks, and
risks that are now outdated.
Response:
Risk planning
Risk monitoring and controlling
Risk identification
Risk analysis
Score 0 of 1
(skipped)
Question:
Response:
Question:
You work as the project manager for Company Inc. The project on which you are working
has several risks that will affect several stakeholder requirements.
Which project management plan will define who will be available to share information on
the project risks?
Response:
Question:
Response:
Standard
Framework
Practice
Policy
Score 0 of 1
(skipped)
Question:
Which of the following operational risks ensures that the provision of a quality product is
not overshadowed by the production costs of that product?
Response:
Question:
Risk assessor
Mid-level manager
Designated risk owner
Senior executives and board of directors
Score 0 of 1
(skipped)
Question:
Which of the following come under the phases of risk identification and evaluation?
Each correct answer represents a complete solution. Choose three.
Response:
Question:
Suppose you are working in Company Inc. and you are using risk scenarios for estimating
the likelihood and impact of the significant risks on this organization.
Response:
IT security assessment
IT audit
Threat and vulnerability assessment
Risk assessment
Score 0 of 1
(skipped)
Question:
You are the project manager for BlueWell Inc. Your current project is a high priority and
high profile project within your organization.
You want to identify the project stakeholders that will have the most power in relation to
their interest on your project. This will help you plan for project risks, stakeholder
management, and ongoing communication with the key stakeholders in your project.
In this process of stakeholder analysis, what type of a grid or model should you create
based on these conditions?
Response:
Question:
Which of the following is MOST helpful to ensure effective security controls for a cloud
service provider?
Response:
Question:
Response:
Documentation reviews
Interviews
System observations
System security testing
Score 0 of 1
(skipped)
Question:
Response:
Question:
You are the project manager of GHT project. Your project utilizes a machine for
production of goods. This machine has the specification that if its temperature would rise
above 450 degree Fahrenheit then it may result in burning of windings.
So, there is an alarm which blows when machine's temperature reaches 430 degree
Fahrenheit and the machine is shut off for 1 hour.
Response:
Of risk indicator
Of risk identification
Of risk trigger
Of risk response
Score 0 of 1
(skipped)
Question:
Which of the following statements most accurately reflects the effect of information
technology (IT) on risk to the business enterprise?
(Choose two.)
Response:
Information technology is a serious risk to the mission of the organization.
Information technology is used to protect the organization’s information.
Information technology is used to eliminate risk to the mission of the organization.
Information technology is used to generate the organization’s information.
Score 0 of 1
(skipped)
Question:
You are working in an enterprise. Assuming that your enterprise periodically compares
finished goods inventory levels to the perpetual inventories in its ERP system.
What kind of information is being provided by the lack of any significant differences
between perpetual levels and actual levels?
Response:
Direct information
Indirect information
Risk management plan
Risk audit information
Score 0 of 1
(skipped)
Question:
In a __________ test, those charged with defending the network are unaware of the testing
and are tested on their ability to react and defend as if a real-world attack were taking
place.
Response:
Double-blind
Gray-box
White-box
Penetration
Score 0 of 1
(skipped)
Question:
You are the project manager of a SGT project. You have been actively communicating and
working with the project stakeholders. One of the outputs of the "manage stakeholder
expectations" process can actually create new risk events for your project.
Which output of the manage stakeholder expectations process can create risks?
Response:
Question:
Henry is the project manager of the QBG Project for his company. This project has a
budget of $4,576,900 and is expected to last 18 months to complete. The CIO, a stakeholder
in the project, has introduced a scope change request for additional deliverables as part of
the project work.
What component of the change control system would review the proposed changes' impact
on the features and functions of the project's product?
Response:
Question:
Mary is a project manager in her organization. On her current project she is working with
her project team and other key stakeholders to identify the risks within the project. She is
currently aiming to create a comprehensive list of project risks so she is using a facilitator
to help generate ideas about project risks.
Response:
Delphi Techniques
Expert judgment
Brainstorming
Checklist analysis
Score 0 of 1
(skipped)
Question:
Which of the following approaches to risk scenario development begins with business
objectives and attempts to identify risk scenarios that could affect those objectives?
Response:
Bottom-up approach
Top-down approach
Cross-functional approach
Quantitative approach
Score 0 of 1
(skipped)
Question:
You are the risk official of your enterprise. You have just completed risk analysis process.
You noticed that the risk level associated with your project is less than risk tolerance level
of your enterprise.
Response:
Question:
You are the project manager of GHT project. Your project team is in the process of
identifying project risks on your current project. The team has the option to use all of the
following tools and techniques to diagram some of these potential risks EXCEPT for which
one?
Response:
Process flowchart
Ishikawa diagram
Influence diagram
Decision tree diagram
Score 0 of 1
(skipped)
Question:
In which of the following risk management capability maturity levels risk appetite and
tolerance are applied only during episodic risk assessments?
Response:
Level 3
Level 2
Level 4
Level 1
Score 0 of 1
(skipped)
Question:
You are the project manager of project for a client. The client has promised your company
a bonus, if the project is completed early. After studying the project work, you elect to
crash the project in order to realize the early end date.
Response:
Response:
Vulnerability
Threat
Asset
Impact
Score 0 of 1
(skipped)
Question:
Response:
Question:
There are five inputs to the quantitative risk analysis process. Which one of the following is
NOT an input to quantitative risk analysis process?
Response:
Question:
You are the project manager of GHT project. You have planned the risk response process
and now you are about to implement various controls. What you should do before relying
on any of the controls?
Response:
Question:
Which among the following is the MOST crucial part of risk management process?
Response:
Risk communication
Auditing
Risk monitoring
Risk mitigation
Score 0 of 1
(skipped)
Question:
Response:
Threats
Risk management strategy
Governance
Vulnerabilities
Score 0 of 1
(skipped)
Question:
A risk practitioner is developing a set of bottom-up IT risk scenarios. The MOST
important time to involve business stakeholders is when:
Response:
Question:
Response:
Integrity of data
Availability of data
Confidentiality of data
Reliability of data
Score 0 of 1
(skipped)
Question:
Using which of the following one can produce comprehensive result while performing
qualitative risk analysis?
Response:
Question:
Which of the following process ensures that extracted data are ready for analysis?
Response:
Data analysis
Data validation
Data gathering
Data access
Score 0 of 1
(skipped)
Question:
Response:
Data custodian
Internal auditor
Data owner
End user
Score 0 of 1
(skipped)
Question:
All of the following statements describe characteristics of controls except which one?
Response:
Question:
There are four inputs to the Monitoring and Controlling Project Risks process. Which one
of the following will NOT help you, the project manager, to prepare for risk monitoring
and controlling?
Response:
Risk register
Work Performance Information
Project management plan
Change requests
Score 0 of 1
(skipped)
Question:
Which of the following is the MOST effective inhibitor of relevant and efficient
communication?
Response:
A false sense of confidence at the top on the degree of actual exposure related to IT
and lack of a well-understood direction for risk management from the top down
The perception that the enterprise is trying to cover up known risk from
stakeholders
Existence of a blame culture
Misalignment between real risk appetite and translation into policies
Score 0 of 1
(skipped)
Question:
Which of the following is MOST important to update when an organization’s risk appetite
changes?
Response:
Question:
A __________ is a piece of software designed to scan a system to determine what services
the system is running and whether any unnecessary open ports, operating systems and
applications, or back doors can be exploited because of a lack of patching or other flaw.
Response:
Port scanner
Protocol analyzer
Vulnerability scanner
Penetration tester
Score 0 of 1
(skipped)
Question:
The KPI category of _____ deals with maintaining baselines of systems and applications.
Response:
Question:
The BEST way to determine the likelihood of a system availability risk scenario is by
assessing the:
Response:
Question:
Which of the following IT controls is MOST useful in mitigating the risk associated with
inaccurate data?
Response:
Question:
Billy is the project manager of the HAR Project and is in month six of the project. The
project is scheduled to last for 18 months. Management asks Billy how often the project
team is participating in risk reassessment in this project.
What should Billy tell management if he's following the best practices for risk
management?
Response:
Project risk management has been concluded with the project planning.
Project risk management happens at every milestone.
Project risk management is scheduled for every month in the 18-month project.
At every status meeting the project team project risk management is an agenda
item.
Score 0 of 1
(skipped)
Question:
Response:
Question:
While developing obscure risk scenarios, what are the requirements of the enterprise?
Each correct answer represents a part of the solution. Choose two.
Response:
Question:
All of the following are valid supporting factors in building a business case to justify
implementing an IT control, except which one?
Response:
Profitability
Security goals
Liability
Governance
Score 0 of 1
(skipped)
Question:
Which of the following vulnerabilities could affect the management of the IT infrastructure
within an organization?
(Choose all that apply.)
Response:
Question:
Which of the following is the GREATEST concern associated with redundant data in an
organization’s inventory system?
Response:
Data inconsistency
Unnecessary data storage usage
Poor access control
Unnecessary costs of program changes
Score 0 of 1
(skipped)
Question:
Response:
Question:
The BEST reason to classify IT assets during a risk assessment is to determine the:
Response:
Question:
__________ are elements that influence the development of risk scenarios, as well as their
likelihood and impact.
Response:
Risk agents
Risk indicators
Risk factors
Threat agents
Score 0 of 1
(skipped)
Question:
Response:
Risk tolerance
Risk mitigation
Risk acceptance
Risk avoidance
Score 0 of 1
(skipped)
Question:
Response:
Threat agent
Vulnerability
Risk
Risk factor
Score 0 of 1
(skipped)
Question:
Response:
Question:
Response:
Sunset (disposition)
Implementation/assessment
Acquisition/development
Operations/maintenance
Score 0 of 1
(skipped)
Question:
Which of the following aspect of monitoring tool ensures that the monitoring tool has the
ability to keep up with the growth of an enterprise?
Response:
Scalability
Customizability
Sustainability
Impact on performance
Score 0 of 1
(skipped)
Question:
Jenny is the project manager for the NBT projects. She is working with the project team
and several subject matter experts to perform the quantitative risk analysis process.
During this process she and the project team uncover several risks events that were not
previously identified.
Response:
Question:
When considering control and risk ownership, which of the following is the main concern?
Response:
Question:
Which of the following is MOST important when developing key performance indicators
(KPIs)?
Response:
Question:
Response:
Question:
All the following are domains of the Val IT framework except which one?
Response:
Value Governance
Security Management
Portfolio Management
Investment Management
Score 0 of 1
(skipped)
Question:
Response:
process owners
IT managers
internal auditors
senior management
Score 0 of 1
(skipped)
Question:
Which of the following is true for Single loss expectancy (SLE), Annual rate of occurrence
(ARO), and Annual loss expectancy (ALE)?
Response:
ALE= ARO/SLE
ARO= SLE/ALE
ARO= ALE*SLE
ALE= ARO*SLE
Score 0 of 1
(skipped)
Question:
Which of the following is true for risk management frameworks, standards and practices?
Each correct answer represents a part of the solution. Choose three.
Response:
Question:
When determining which control deficiencies are most significant, which of the following
would provide the MOST useful information?
Response:
Question:
Which of the following is an acceptable method for handling positive project risk?
Response:
Exploit
Avoid
Mitigate
Transfer
Score 0 of 1
(skipped)
Question:
You are the project manager of the GHY project for your company. This project has a
budget of $543,000 and is expected to last 18 months. In this project, you have identified
several risk events and created risk response plans.
In what project management process group will you implement risk response plans?
Response:
Question:
Qualitative risk assessment uses which of the following terms for evaluating risk level?
Each correct answer represents a part of the solution. Choose two.
Response:
Impact
Annual rate of occurrence
Probability
Single loss expectancy
Score 0 of 1
(skipped)
Question:
When it appears that a project risk is going to happen, what is this term called?
Response:
Issue
Contingency response
Trigger
Threshold
Score 0 of 1
(skipped)
Question:
Response:
Likelihood
Impact
Threat
Threat agent
Score 0 of 1
(skipped)
Question:
Which of the following role carriers has to account for collecting data on risk and
articulating risk?
Response:
Question:
__________ often occur from an internal point looking across the organization to get the
best look at the vulnerabilities without the interference of the perimeter protections.
Response:
Threat assessments
Penetration tests
Vulnerability assessments
Black-box tests
Score 0 of 1
(skipped)
Question:
A risk practitioner is preparing a report to communicate changes in the risk and control
environment. The BEST way to engage stakeholder attention is to:
Response:
Question:
Response:
Short-term
Long-term
Discontinuous
Large impact
Score 0 of 1
(skipped)
Question:
You are the project manager of the AFD project for your company. You are working with
the project team to reassess existing risk events and to identify risk events that have not
happened and whose relevancy to the project has passed.
What should you do with these events that have not happened and would not happen now
in the project?
Response:
Question:
Which of the following BEST measures the operational effectiveness of risk management
capabilities?
Response:
Question:
Response:
Question:
Response:
Question:
Response:
Question:
__________ can contain valuable information about past and ongoing activities and, when
handled properly, can be timely.
Response:
Metrics
Accreditations
Indicators
Logs
Score 0 of 1
(skipped)
Question:
You and your project team have identified a few risk events in the project and recorded the
events in the risk register. Part of the recording of the events includes the identification of a
risk owner. Who is a risk owner?
Response:
A risk owner is the party that will monitor the risk events.
A risk owner is the party that will pay for the cost of the risk event if it becomes an
issue.
A risk owner is the party that has caused the risk event.
A risk owner is the party authorized to respond to the risk event.
Score 0 of 1
(skipped)
Question:
__________ help(s) you quantify the effectiveness of your implemented risk response over
its life.
Response:
Leaders
Reports
Automation
Metrics
Score 0 of 1
(skipped)
Question:
Which of the following is the BEST key performance indicator (KPI) to measure the
effectiveness of a vulnerability management process?
Response:
Question:
Response:
Senior management
Government regulators
Risk managers
External corporate auditors
Score 0 of 1
(skipped)
Question:
Response:
Acceptance
Mitigation
Transfer
Share