SPACE REQUIREMENTS

• The most difficult determination in facilities planning


• The design year: 5-10 years
• Uncertainty –due to impact of technology,
Changing product mix, changing demand levels,
changing organization designs for the future
SPACE REQUIREMENT • Needs a systematic approach: “From the ground
up”

www.aeunike.lecture.ub.ac.id www.aeunike.lecture.ub.ac.id

SPACE REQUIREMENTS SPACE REQUIREMENTS

• In manufacturing and office environments, space • Workstation Specification (space for equipment,
requirements should be determined first for materials, and personnel)
individual workstations; next, departments, etc. • Equipment Space consists of space for
• Modern manufacturing approaches can reduce • the equipment; machine travel;machine maintenance;
space requirements. • plant services
• Products are delivered to the points of use in smaller lot and • Materials Space consists of space for
unit load size • Receiving and storing materials; In-process materials;
• Decentralised storage areas • Storing and shipping materials; Storing and shipping waste and
• Less inventories (using a pulled system) scrap; Tools, fixtures, jig, dies, and maintenance materials
• Manufacturing cells • Personnel area consists of space for
• Companies are downsizing • The operator; Material handling; Operator ingress and egress.

www.aeunike.lecture.ub.ac.id www.aeunike.lecture.ub.ac.id

SPACE REQUIREMENTS SPACE REQUIREMENTS

• Department Specification Simple rules of thumb are used to determine the extra
space that is required (Heragu, 1997)
• Aisle Arrangement  3 – 4 feet are added to the length and width of each
machine or workstation
• Visual Management and Space Requirement
 The additional space is calculated as a percentage of
the actual area occupied by a workstation, typically 200%
to 300%
 Calculate the space required for the workstation, auxiliary
equipment, operator space, incoming material and work
in process space, and other additional space (e.g., load
and unload acces, material handling carrier clearance)
and add the separate quantities to determine the total
space required (the preffered method of determining
extra space)

www.aeunike.lecture.ub.ac.id www.aeunike.lecture.ub.ac.id

1
16/03/2015

SPACE REQUIREMENTS WORKSTATION

www.aeunike.lecture.ub.ac.id

AISLE ALLOWANCE DEPARTMENTAL SERVICE

www.aeunike.lecture.ub.ac.id www.aeunike.lecture.ub.ac.id

AISLE WIDTHS VISUAL MANAGEMENT

www.aeunike.lecture.ub.ac.id www.aeunike.lecture.ub.ac.id

2
16/03/2015

VISUAL MANAGEMENT
• Keterangan gambar:
A. Identification, housekeeping, and organization
1. Identification of the department
2. Identification of activities, resources, and products
3. Identification of the team
4. Markings on the floor
5. Markings of tools, racks, fixtures
6. Technical area
7. Communication and rest area
8. Information and instructions
9. Housekeeping tools
B. V isual documentation
10. Manufacturing instructions and technical procedures area
C. Visual production, maintenance, inventory, and quality control
11.
12.
13.
Computer terminal
Production schedule
Maintenance schedule
PERSONEL REQUIREMENT
14. Identification of inventories and work-in process
15. Monitoring signals for machines TATA LETAK FASILIT AS (TIN 4124)
16. Statistical process control
17. Record of problems
D. Performance measurement
18. Objectives, result, and difference
E. Progress status
19. Improvement activities
20. Company project and mission statement
www.aeunike.lecture.ub.ac.id

PERSONNEL REQUIREMENTS ANALYSIS PERSONNEL REQUIREMENTS

• n number of types of operations • Philosophies relating to personnel:


• Oi aggregate number of operation • “Our firm is responsible for our employees from the moment
type i required on all the pseudo (or they leave their home until they return. We must provide
real) products manufactured per day n
Ti Oi
N 
adequate methods of getting to and from work”
• Ti standard time required for an • “Employees spend one third of their life within our facility,

i 1  H
average operation Oi
we must help them enjoy working here”
• H total production time available per
day
• η assumed production efficiency of
the plant

www.aeunike.lecture.ub.ac.id

PERSONNEL REQUIREMENTS PERSONNEL REQUIREMENTS


• The Employee-Facility Interface
• Facilities plannning relating to personnel includes • Employee Parking
planning for: • The procedure of planning employee parking:
1. Determine the number of automobiles to be parked
• The Employee-Facility Interface 2. Determine the space required for each automobile
• Employee parking 3. Determine the available space for parking
4. Determine alternative parking layouts for alternative parking patterns
• Locker rooms 5. Select the layout that best utilizes space and maximizes employee
convenience
• Restrooms
• The factors to be considered in determining the specification for a
• Food services specific parking lot are:
1. The percentage of automobiles to be parked that are compact
• Health services automobiles. As a planning guideline, if more specific data are not
available, 33% of all parking is often allocated to compact automobiles
• Barrier-Free Compliance 2. Increasing the area provided for parking decreases the amount of time
required to the park and de-park
3. Angular configurations allow quiker turnover; perpendicular parking
yields greater space utilization
4. As the angle of parking space increases, so does the required space
allocated to aisles
• Parking lot lacation should not be more than 500 ft from entrances
and exists of the facility

3
16/03/2015

PERSONNEL REQUIREMENTS PERSONNEL REQUIREMENTS


• Parking dimensions for each car group as a function of single
• Recommended parking dimensions: and double loaded model:

PERSONNEL
PERSONNEL REQUIREMENTS REQUIREMENTS

• Locker rooms • Restrooms


• Plumbing fixture
requirements for
number of
employees

PERSONNEL REQUIREMENTS PERSONNEL REQUIREMENTS

• Restrooms • Food services


• Alternatives for food services requirements:
• Restroom layout with typical clearances 1. Dining away from the facility
2. Vending mchines and cafetaria
3. Serving line and cafetaria (> 200 employees)
4. Full kitchen and cafetaria (> 400 employees)

• Disadvantages of dining away alternative


• Longer meal break
• Lost supervision
• A loss of worker interaction
• A loss of worker concentration on the tasks to be performed

4
16/03/2015

PERSONNEL REQUIREMENTS PERSONNEL REQUIREMENTS


• Food services • Health services
• Types of health services that may be provided within a facility
include:
1. Pre-employment examination
Shifting timing
for 30-min lunch break 2. First aid treatment
3. Major medical treatment
4. Dental care
5. Treatment of illnesses
Space requirements
for cafetarias • First aid treatment:
• Without nurse: 100 ft2 (first aid kit, a bed, 2 two chairs)
• With a nurse: 250 ft2 (first aid kit, two beds, 2 two chairs), 75 ft2 waiting
room. Every additional nurse = add 250 ft2 space, and 25 ft2 waiting
room
• Add a physician: add 150 ft2 for examination room

Space required
for full kitchen

PERSONNEL REQUIREMENTS

• Barrier-Free Compliance
• Americans with Disabilities Act (ADA)

GROUP TECHNOLOGY:
MACHINES ASSIGNMENT
TATA LETAK FASILIT AS (TIN 4124)

MACHINE ASSIGNMENT MACHINE ASSIGNMENT

• Popular Approach: • TUGAS:


• Classification and coding • CARI dan RESUME JURNAL MENGENAI MACHINE
• Production flow analysis ASSIGNMENT
• Clustering techiques • CARI dan RESUME JURNAL MENGENAI DESAIN FASILITAS
• Heuristic procedures
• Mathematical models (branch and bound method) • Batasan:
• Jurnal nasional dan atau internasional
• 5 tahun terakhir
• Clustering techiques:
• Kelompok: maksimum 3 orang
• Five commonly used algorithms:
• Rank order clustering
• Bond energy
• Row and column masking
• Similarity coefficient
• Mathematical programming approach

5
16/03/2015

REFERENCES

• Heragu, S. (2008). Facilities Design (3rd Ed.). CRC


Press.
• Tompkins, White, Bozer and Tanchoco. (2010).
Facilities Planning (4th Ed.). New York: Wiley.

You might also like