Coal Mining Executive

This document provides executive summaries for two coal mining companies in Indonesia: CV. Akbar and PT. Harindo Wahana. CV. Akbar operates a 706 hectare concession with estimated reserves over 10 million metric tons and production capacity of 100,000-150,000 MT per month. PT. Harindo Wahana's concession covers 5,110 hectares with estimated reserves of 30 million metric tons and similar production levels. Both companies have stockpile areas, barge loading facilities, and export necessary legal permits and certificates to supply coal.

Uploaded by

Budi Siadjeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
903 views2 pages

Coal Mining Executive

This document provides executive summaries for two coal mining companies in Indonesia: CV. Akbar and PT. Harindo Wahana. CV. Akbar operates a 706 hectare concession with estimated reserves over 10 million metric tons and production capacity of 100,000-150,000 MT per month. PT. Harindo Wahana's concession covers 5,110 hectares with estimated reserves of 30 million metric tons and similar production levels. Both companies have stockpile areas, barge loading facilities, and export necessary legal permits and certificates to supply coal.

Uploaded by

Budi Siadjeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

COAL MINING EXECUTIVE SUMMARY

SUPPLY SUPPORTING TO PT. BINTANG HAPOSAN PERSADA

I CV. AKBAR
A Mining Information
1. Company’s name & address CV. Akbar, Jl. Oxygen 1, Komplek Meranti Griya Oxygen
D, No.17, Banjarbaru district, Kalimantan Selatan
2. Concession and Location :
a. Name & location of concession CV. Akbar, Mataraman sub-district, Banjar district,
Kalimantan Selatan
b. Coordinate of mine location
Legality IUP-OP No. 863 Year 2014
Area code KW.04.098.P.BJR 2008
c. Road access & capacity Road with aggregate pavement
3. Extent of concession area 706 hectares
4. Deposit estimation + 10.000.000 (ten millions) metric ton
5. Production capacity + 100.000 up to + 150.000 MT/month
6. Stockpile location :
a. Name of the place Intan Daya Energi (IDE)
b. Distance from the mine + 17 kms
c. Total area available + hectares
7. Barging/jetty point :
a. Name of the place PT. Talenta Bumi KM71
b. Name of the river
c. Distance from the mine + 53 kms
d. Distance from the stockpile + 36 kms
e. Total area available + hectares
f. Barge capacity/size 300 feet, 320 feet, and 330 feet
g. Loading port - anchorage Taboneo
8 Legalities :
a. IUP-OP No. 863 year 2014
Clear and Clean certificate No. 760/Bb/03/2016
Registered Coal Exporter No. 03.ET-04.18.0211

B Specification Basis Typical Rejection


a. Total Moisture Arb 34%
b. Inherent moisture Adb 13% - 16%
c. Ash content Adb 7% > 10%
d. Volatile matter Adb 38% - 45%
e. Sulfur content Adb < 0,6% > 0,6%
f. Calorific value - GAR Arb 3800 kcal/kg < 3400 kcal/kg
g. HGI > 40
h. Size Min 0 – 50 mm (90%)

C Price/MT Rp 470.000/MT FOB Rp 575.000/MT CIF


vessel
II PT. HARINDO WAHANA
A Mining Information
1. Company’s name & address PT. Harindo Wahana, Jl. Batu Cermin Komplek Sempaja
Residence No. 002, Samarinda, Kalimantan Timur
2. Concession and Location :
a. Name & location of concession PT. Harindo Wahana, Tering sub-district, Kutai Barat
district, Kalimantan Timur
b. Coordinate of mine location
Legality IUP-OP No. 545/K-875/2010 Year 2010
Area code KW.64.07.15.05 Date October 25, 2010
c. Road access & capacity Road with aggregate pavement
3. Extent of concession area 5.110 hectares
4. Deposit estimation + 30.000.000 (thirty millions) metric ton
5. Production capacity + 100.000 up to + 150.000 MT/month
6. Stockpile location :
a. Name of the place PT. Harindo Wahana (self ownership)
b. Distance from the mine + 12 kms
c. Total area available + 5 hectares
7. Barging/jetty point :
a. Name of the place PT. Harindo Wahana (self ownership)
b. Name of the river Mahakam
c. Distance from the mine + 12 kms
d. Distance from the stockpile + 1 up to 2 kms
e. Total area available + 5 hectares
f. Barge capacity/size 270 feet
g. Loading port - anchorage Muara Berau
8 Legalities :
a. IUP-OP No. 545/K-875/2010 Year 2010
Clear and Clean certificate No. 839/Bb/03/2017
Registered Coal Exporter

B Specification Basis Typical Rejection


a. Total Moisture Arb 39,57%
b. Inherent moisture Adb 12,48% - 15%
c. Ash content Adb 5,06% - 9% > 10%
d. Volatile matter Adb 44,14%
e. Sulfur content Adb 0,18% - 0,4% > 0,6%
f. Calorific value - GAR Arb 3800 kcal/kg < 3400 kcal/kg
g. HGI > 40
h. Size Min 0 – 50 mm (90%)

C Price/MT Rp 460.000/MT FOB Rp 565.000/MT CIF


vessel