0% found this document useful (0 votes)
1K views1 page

A PPP Lesson Plan Outline

This document outlines a lesson plan template that includes sections for the class profile, objectives, previous knowledge, materials needed, potential problems, lesson procedures, checking and consolidation, and conclusion. The lesson procedures section lists the main teacher and student activities broken into warmer, presentation, practice, production, and follow-up sections with estimated timing for each part.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

A PPP Lesson Plan Outline

This document outlines a lesson plan template that includes sections for the class profile, objectives, previous knowledge, materials needed, potential problems, lesson procedures, checking and consolidation, and conclusion. The lesson procedures section lists the main teacher and student activities broken into warmer, presentation, practice, production, and follow-up sections with estimated timing for each part.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

A PPP Lesson Plan Outline

Lesson Title

Class Profile

 level
 learner age
 type of English
 duration
 class size

* Objectives (knowledge; skills; and/or other aspects of learning content)

Previous Knowledge and Experience

* Materials Needed

Possible Problems and Difficulties

* Lesson Procedures (This is the main section, based on the type of lesson given.)

Teacher Activities Students Activities

1. Warmer (timing) 1.
2. Presentation (timing) 2.
a. ………………………………. (timing) a. ……………………………….
b. ………………………………. (timing) b. ……………………………….
c. ………………………………. (timing) c. ……………………………….
3. Practice (timing) 3.
a. ………………………………. (timing) a. ……………………………….
b. ………………………………. (timing) b. ……………………………….
c. ………………………………. (timing) c. ……………………………….
4. Production (timing) 4.
a. ………………………………. (timing) a. ……………………………….
b. ………………………………. (timing) b. ……………………………….
c. ………………………………. (timing) c. ……………………………….
5. Follow-ups (timing) 5.

Checking and Consolidation

Conclusion

ELTMethodologyFolderE1-2010-LDQ-Week1-02

You might also like