This document provides an agenda for the 2017 Spring Refining and Equipment Standards Meeting taking place from May 8-11, 2017 in Las Vegas, Nevada. The agenda lists various pre-meeting and task group sessions covering topics such as mechanical equipment, aboveground storage tanks, corrosion and materials, electrical equipment, heat transfer equipment, and inspection and mechanical integrity. Meetings will include general sessions, task groups, and workshops to discuss industry standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views21 pages

PreliminaryProgram SpringRefining2017 PDF

This document provides an agenda for the 2017 Spring Refining and Equipment Standards Meeting taking place from May 8-11, 2017 in Las Vegas, Nevada. The agenda lists various pre-meeting and task group sessions covering topics such as mechanical equipment, aboveground storage tanks, corrosion and materials, electrical equipment, heat transfer equipment, and inspection and mechanical integrity. Meetings will include general sessions, task groups, and workshops to discuss industry standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

2017 Spring Refining and Equipment Standards Meeting

May 8-11, 2017 | Caesars Palace | Las Vegas, Nevada | www.api.org/meetings

Current as of May 1, 2017 | Subject to change | SOME Pre- & Post-Week Meetings: May 5-7 and May 11-12

Friday, May 5, 2017

Mechanical Equipment
API Task Force 692, Compressor Dry Gas Seals
8:00 am – 5:00 pm
Saturday, May 6, 2017

Mechanical Equipment
API Task Force 616, Gas Turbines for the Petroleum,
Chemical and Gas Industry Services
8:00 am – 3:30 pm
API Task Force 682, Pump - Shaft Sealing Systems Cancelled
for Centrifugal and Rotary Pumps
8:00 am – 5:00 pm
API Task Force 692, Compressor Dry Gas Seals
8:00 am – 5:00 pm
Sunday, May 7, 2017

General
Registration
1:00 pm – 5:00 pm
Sponsor and Exhibitor Displays
(Vendor Setup)
1:00 pm – 5:00 pm
Aboveground Storage Tanks,
Inspection and Mechanical
Integrity, and Corrosion and
Materials
SCAST/SCIMI/SCCM Coordination Committee
(Leadership Teams & API Reps)
4:00 pm – 5:00 pm

1
Sunday, May 7, 2017
(Continued)

Heat Transfer Equipment

SCHTE Academic Liaison Working Group


1:00 pm – 4:00 pm
Mechanical Equipment

API Task Force 681, Liquid Ring Vaccum Pumps and


Compressors
8:00 am – 5:00 pm
API Task Force 613, Special Purpose Gear Units for
Petroleum, Chemical and Gas Industry Services
8:00 am – 5:00 pm
API Task Force 682, Pump - Shaft Sealing Systems Cancelled
for Centrifugal and Rotary Pumps
8:00 am – 5:00 pm
API Task Force 692, Compressor Dry Gas Seals
8:00 am – 5:00 pm

API Task Force 616, Gas Turbines for the Petroleum,


Chemical, and Gas Industry Services
8:00 am – 5:00 pm
API Task Force 611, General-Purpose Steam
Turbines
8:00 am – 5:00 pm
Piping and Valves

Task Force on Std. 608, Bolted Bonnet Gate Valves


3:00 pm – 5:00 pm

Task Force on Std. 623, Globe Valves


3:00 pm - 5:00 pm

Refinery Equipment

CRE Chairs’ Workshop


(Members & Invited Guests Only)
5:00 pm – 6:30 pm

2
Monday, May 8, 2017

General
Breakfast and General Session – “Standards as
Data & Collaborative Authoring Tools”
7:00 am – 8:30 am
Registration
7:00 am – 5:00 pm
Sponsor and Exhibitor Displays
7:00 am – 5:00 pm
Spouses’ Breakfast
7:30 am – 9:00 am
Morning Coffee Service
8:00 am – 9:30 am
Orientation for New Committee Members and New
Attendees
(Open to new attendees and anyone wishing to expand
their knowledge of procedures for standards development
and committee structure)
8:30 am – 9:30 am
Mid-Morning Coffee Service
10:30 am – 11:00 am
Afternoon Coffee Service
2:00 pm – 2:30 pm
Special Afternoon Networking Break
2:30 pm – 3:00 pm
Welcome Reception
6:00 pm – 7:00 pm
Aboveground Storage Tanks
Tank Safety Task Group
(2015, 2026, 2027, and 2207)
8:30 am – 11:00 am
Refrigerated Tank Task Group
8:30 am – 12:00 pm
Standard 2510 (LPG Installations)
Revision Task Group
1:00 pm – 3:00 pm

3
Monday, May 8, 2017
(Continued)
Aboveground Storage Tanks
(Continued)
Standard 2610 (Terminal Tank Facilities) Revision
Task Group
1:00 pm – 4:00 pm
12 Series (Production Tanks) Work Group
1:00 pm – 5:00 pm
SCAST Owners and Operators
4:00 pm – 6:00 pm
SCAST Manufacturers and Contractors
5:00 pm – 6:00 pm
Corrosion and Materials
Task Group on Corrosion and Materials Research
8:30 am - 10:30 am
RP 932-B Hydroprocessing REACs
10:30 am – 12:00 pm
High Temperature Hydrogen Attack JIP
(Sponsors Only)
12:00 pm – 1:30 pm
RP 941, High Temperature Hydrogen Attack
1:30 pm – 3:30 pm
API 934 - H&I, CrMo Reactor Inspection &
Maintenance
3:30 pm – 5:30 pm
Electrical Equipment
RP 545, Recommended Practice for Lightning
Protection for of Aboveground Storage Tanks for
Flammable or Combustible Liquids
8:00 am – 12:00 pm
RP 546, Brushless Synchronous Machines - 500 kVA
and Larger, 4th Edition Draft
8:00 am – 5:00 pm
RP 500 and RP 505 Classification of Locations for
Electrical Installations
8:30 pm – 5:00 pm

4
Monday, May 8, 2017
(Continued)

Heat Transfer Equipment


Task Group on Std. 560, Fired Heaters
(General Session)
8:30 am – 9:00 am
Task Group on Std. 669, Heat Recovery Systems
8:30 am – 5:00 pm
Task Group on Std. 560, Fired Heaters
(Burners)
9:00 am – 12:00 pm
Task Group on Std. 560, Fired Heaters
(Coatings)
9:00 am – 12:00 pm
Task Group on Std. 560 Fired Heaters
(General Session)
1:00 pm – 3:00 pm
SCHTE Fired Consensus Group
3:00 pm – 5:00 pm
SCHTE Steering Committee
(Committee Members Only)
5:00 pm – 6:00 pm
SCHTE Task Group Secretaries, Subgroup Leaders, Cancelled
and Liaisons
5:00 pm – 6:00 pm
Inspection and Mechanical
Integrity
Inspection Codes Task Group
8:30 am – 10:30 am
RP 575 Task Group
10:30 am – 11:00 am
API RP 573 Task Group
11:00 am – 12:00 pm

5
Monday, May 8, 2017
(Continued)

Inspection and Mechanical


Integrity
(Continued)
API RP 583 Task Group
1:00 pm – 2:00 pm
API RP 584 Task Group
2:00 pm – 3:00 pm
API RP 571 Task Group
(Inspection Section Only)
2:00 pm – 4:30 pm
API RP 585 Task Group
3:00 pm – 4:00 pm
Instruments and Control
Systems
Subcommittee on Instruments and Control Systems
8:30 am – 5:00 pm
Mechanical Equipment
SOME Joint Review on Std. 613, Special Purpose Cancelled
Gear Units for Petroleum, Chemical and Gas Industry
Services
8:30 am – 12:00 pm
SOME Joint Review on API 686, Recommended
Practice for Machinery Installation and Installation
Design
1:00 pm – 5:00 pm

6
Monday, May 8, 2017
(Continued)

Piping and Valves


Piping Executive Session
(Users Only)
8:30 am – 9:30 am
Piping Manufacturers and Contractors
8:30 am – 9:30 am
Piping Subgroup on Gate, Globe, and Check Valves
9:30 am – 12:30 pm
Piping Subgroup on Quarter Turn Valves and Valve
Quality
1:30 pm – 5:00 pm
Task Force on Std. 608, Ball Valves Cancelled
2:00 pm – 4:00 pm
Pressure Relieving Systems
PERF II – Inlet Stability
8:30 am – 12:00 pm
Refractory Materials
Management of API Sponsored Refractory Projects
8:30 am – 5:00 pm
Technical Data Committee
Technical Data Book Cancelled
8:30 am – 5:00 pm

7
Tuesday, May 9, 2017

General
Early Morning Coffee Service
7:00 am – 8:30 am
Registration
7:00 am – 4:00 pm
Operating Practices Symposium Early
Registration
7:00 am – 4:00 pm
Sponsor and Exhibitor Displays
7:00 am – 5:00 pm
Spouses’ Breakfast
7:30 am – 9:00 am
Mid-Morning Coffee Service
10:30 am – 11:00 am
Afternoon Coffee Service
2:00 pm – 2:30 pm
Special Afternoon Networking Break
2:30 pm – 3:00 pm
Aboveground Storage Tanks
SCAST Subgroup Fabrication
8:00 am – 5:30 pm
SCAST Subgroup Design
8:00 am – 5:30 pm
Corrosion and Materials
SCCM Officers
(Officers Only)
7:00 am – 8:00 am
API 934 A-B-C-E CrMo Reactor Fabrication
8:00 am – 12:00 pm
RP 934-F, Reactor MPT
1:00 pm – 3:00 pm

8
Tuesday, May 9, 2017
(Continued)
Corrosion and Materials
(Continued)
RP 945, Amine SCC
1:00 pm – 3:00 pm
RP 934-J, Coke Drum Repairs
3:00 pm – 4:30 pm
RP 571, Damage Mechanisms
4:00 pm – 6:00 pm
Electrical Equipment
RP 546, Brushless Synchronous Machines - 500 kVA
and Larger, 4TH Edition Draft
8:00 am – 5:00 pm
RP 500 and RP 505 Classification of Locations for
Electrical Installations
8:30am – 5:00 pm
Heat Transfer Equipment
Task Group on Std. 560, Fired Heaters (Refractory)
8:00 am – 12:00 pm
SCHTE /SCRM API 565, Refractory Details for Sulfur
Reaction Furnaces
8:00 am – 12:00 pm
Task Group on Std. 534, Heat Recovery Steam
Generators - Next Edition, Day 1
8:00 am – 6:00 pm
Std. 535, Burners for Fired Heaters: Development of
Next Edition
8:00 am – 6:00 pm
Std. 810, Welded Plate - Block Heat Exchangers:
Development of 1st Edition
8:00 am – 6:00 pm

9
Tuesday, May 9, 2017
(Continued)
Heat Transfer Equipment
(Continued)
Task Group on Std. 560, Fired Heaters (Fans)
1:00 pm – 6:00 pm
SCHTE/SCRM API 561–Refractory Details for
Reforming Furnaces
1:00 pm – 6:00 pm
Inspection and Mechanical
Integrity
SCIMI NDE Task Group
7:30 am – 9:30 am
API RP 581 Task Group
8:00 am – 12:00 pm
RP 586 Development
9:30 am – 12:00 pm
API RP 587 Development Meeting
1:00 pm – 3:00 pm
API RP 577 Task Group
3:00 pm – 4:00 pm
API 581 Task Group - Breakout Session
4:00 pm – 6:30 pm
SCIMI Contractors Task Group
4:30 pm – 6:30 pm
Instrument and Control
Systems
Task Group on RP 554, Parts 1-3, Control Systems
Functions
8:00 am – 11:00 am
Task Group on RP 553, Refinery Valves and
Accessories for Control and Safety Instrumented
Systems
11:00 am – 3:00 pm
Task Group on RP 552, Transmission Systems
3:00 pm – 6:00 pm

10
Tuesday, May 9, 2017
(Continued)

Mechanical Equipment

SOME Joint Review on Std. 682, Pumps-Shaft


Sealing Systems for Centrifugal and Rotary Pumps
8:00 am – 10:00 am
SOME Joint Review on API Std. 673/560, Centrifugal
Fans
10:00 am - 12:00 pm
SOME Joint Review on API Std. 681, Liquid Ring
Vacuum Pumps and Compressors
1:30 pm – 4:30 pm
Piping and Valves
Piping - Joint Meeting
8:30 am – 11:30 am
SCOPV Executive Roundtable
(User Members Only)
1:30 pm – 4:30 pm
Task Force on RP 621, Valve Reconditioning
1:30 pm – 4:00 pm

Task Force on Std. 608, Ball Valves


2:00 pm – 4:00 pm
Pressure Relieving Systems
Task Force on 521, Pressure Relieving and
De-Pressurized Systems
8:00 am – 5:00 pm
Refinery Equipment
CRE Project Coordinating Committee
10:00 am – 4:00 pm

11
Tuesday, May 9, 2017
(Continued)
Refining Subcommittee
Refining Subcommittee
(Committee Members and Invited Guests Only)
1:00 pm – 6:00 pm
Refractory Materials
SCHTE/SCRM API 565, Refractory Details for Sulfur
Reaction Furnaces
8:00 am – 12:00 pm
SCRM/SCHTE API 561, Refractory Details for
Reforming Furnaces
1:00 pm – 6:00 pm
Technical Data Committee
Technical Data Book Cancelled
8:00 am – 12:00 pm

12
Wednesday, May 10, 2017

General
Early Morning Coffee Service
7:00 am – 8:30 am
Operating Practices Symposium Registration
7:00 am – 12:00 pm
Registration
7:00 am – 4:00 pm
Mid-Morning Coffee Service
10:30 am – 11:00 am
Afternoon Coffee Service
2:00 pm – 3:00 pm
Aboveground Storage Tanks
SCAST Joint Session
8:00 am – 12:00 pm
Corrosion and Materials
TR 938-C, Duplex Stainless Steels
8:00 am – 10:00 am
Duplex Stainless Steel JIP
10:00 am – 10:30 am
RP 582, Welding Guidelines
10:00 am – 12:00 pm
RP 939-C Sulfidation
10:30 am – 12:00 pm
RP 970, Corrosion Control Documents
1:00 pm – 3:00 pm
SCCM Joint and Business Meeting
3:00 pm – 5:00 pm

13
Wednesday, May 10 2017
(Continued)
Electrical Equipment
SOEE Joint Meeting
8:00 am – 12:00 pm
Heat Transfer Equipment
Std. 561, Reforming Furnaces for H2 & Syngas –
General Session
8:00 am – 9:00 am
API 537/521, Joint Meeting: Moving Material from
One Standard to the Other
8:00 am – 10:00 am
Std. 667, Plate and Frame Heat Exchangers - Develop
1st Ed. (Revised API 662, Part 2)
8:00 am – 6:00 pm
Std. 561, Reforming Furnaces for H2 & Syngas -
Breakout 1 (Process, Combustion & Mechanical
Design)
9:00 am – 4:00 pm
Std. 561, Reforming Furnaces for H2 & Syngas -
Breakout 2 (Radiant Coil, Convection and
Supports, etc.)
9:00 am – 4:00 pm
Std. 561, Reforming Furnaces for H2 & Syngas -
Breakout 3 (Instrumentation & Protective
Functions)
9:00 am – 4:00 pm
Std. 561, Reforming Furnaces for H2 & Syngas -
Breakout 4 (Inspection and Testing)
9:00 am- 4:00 pm
Task Group on Std. 537, Flare Details, New Items
10:00 am – 12:30 pm
Std. 561, Reforming Furnaces for H2 & Syngas –
General Session
4:00 pm – 5:00 pm

14
Wednesday, May 10, 2017
(Continued)
Inspection and Mechanical
Integrity
API RP 578 Task Group Meeting
7:30 am – 10:00 am
Inspector Certification Task Group
10:00 am – 12:00 pm
SCIMI Joint Meeting
1:00 pm – 5:30 pm
Mechanical Equipment
SOME Joint Review on 10-Year Plan
8:00 am – 8:30 am
SOME Joint Review on Std. 617, Axial and
Centrifugal Compressors
8:30 am – 12 :00 pm
SOME Joint Review on Std. 611 General-purpose
Steam Turbines
1:00 pm – 5:00 pm
Operating Practices
OPS Breakfast
(Symposium Participants Only)
8:00 am – 8:30 am
Operating Practices Symposium (OPS)
(Refining and Petrochemical Operating Companies
Only)
8:30 – 5:00 pm
OPS Networking Lunch
(Operating Practices Symposium Participants Only)
12:00 pm – 1:00 pm

15
Wednesday, May 10, 2017
(Continued)
Pressure Relieving Systems
Task Force on Std. 526/527, Pressure Relief Valves
8:00 am – 10:00 am
Task Group on Std. 2000
10:00 am – 12:00 am
SCPRS Joint Session
1:30 – 5:00 pm

16
Thursday, May 11, 2017

General
Registration
7:00 am – 12:00 pm
Early Morning Coffee Service
7:30 am – 9:00 am
Mid-Morning Coffee Service
10:30 am – 11:00 am
Afternoon Coffee Service
2:00 pm – 3:00 pm
Corrosion and Materials
WRC/MPC Heavy Wall CrMo Vessel "PREVENT"
Program
(Open to Project Sponsors and Invited Guests Only)
8:30 am – 3:00 pm
Heat Transfer Equipment
SCHTE Unfired Consensus Group
8:00 am – 10:00 am
Task Group on Std. 565, Reactor Furnaces in Sulfur
Recovery Units Burner Subgroup
8:00 am – 11:00 am
Task Group on Std. 534, Heat Recovery Steam
Generators - Next Edition, Day 2
8:00 am – 6:00 pm
SCHTE/SOICS RP 556, Instrumentation Control and
Protective Systems for Fired Heaters
8:00 am – 6:00 pm
Task Group on Std. 660, Shell-and-Tube Heat
Exchangers, Addendum to 9th Edition
10:00 am – 12:00 pm
Std. 565, Joint Meeting w/SOICS
11:00 am – 3:00 pm

17
Thursday, May 11, 2017
(Continued)
Heat Transfer Equipment
(Continued)
Task Group on Std. 668, Brazed Aluminum Plate-Fin
Heat Exchangers
1:00 pm – 6:00 pm
Task Group on Std. 565, Reactor Furnaces in Sulfur
Recovery Units Ancillary Subgroup
3:00 pm – 6:00 pm
Inspection
Inspector Certification Exam Construction –
Breakout 1
(Invited Guests Only)
7:00 am – 5:00 pm
Inspector Certification Exam Construction –
Breakout 2
(Invited Guests Only)
7:00 am – 5:00 pm
ICP Exam Construction: 936 (Room 1)
7:00 am – 1:00 pm
ICP Exam Construction: 936 (Room 2) Cancelled
7:00 am – 5:00 pm
Subcommittee on Inspection – Joint Meeting Now on Wednesday,
8:00 am – 12:00 pm 1:00 pm – 5:30 pm
Instrument and Control
Systems
Std. 565, Joint Meeting w/SCHTE
11:00 am – 3:00 pm
Mechanical Equipment
Task Force on Source Inspection
8:00 am – 5:00 pm
API Task Force 617, Axial Centrifugal Compressors
8:00 am – 5:00 pm
Task Force on Std. 614, Lubrication, Shaft-Sealing,
and Oil-Control Systems and Auxiliaries
8:00 am – 5:00 pm

18
Thursday, May 11, 2017
(Continued)
Pressure Relieving Systems
Task Force on Std. 520, Pressure Relieving Devices –
Parts I and II
8:00 am – 5:00 pm
Refinery Equipment
Committee on Refinery Equipment
(Members and Invited Guests Only)
8:00 am – 6:00 pm

19
Friday, May 12, 2017

General
Early Morning Coffee Service
7:30 am – 8:30 am
Mid-Morning Coffee Service
10:30 am – 11:00 am
Afternoon Coffee Service
2:00 pm – 3:00 pm
Inspection and Mechanical
Integrity
Inspector Certification Exam Construction –
Breakout 1
(Invited Guests Only)
7:00 am – 5:00 pm
Inspector Certification Exam Construction –
Breakout 2
(Invited Guests Only)
7:00 am – 5:00 pm
ICP Exam Construction: 936 (Room 1)
7:00 am – 1:00 pm
ICP Exam Construction: 936 (Room 2) Cancelled
I7:00 am – 1:00 pm
Mechanical Equipment
API Task Force 617, Axial and Centrifugal
Compressors
8:00 am – 5:00 pm
Task Force on Source Inspection
8:00 am – 5:00 pm
Task Force on Std. 614, Lubrication, Shaft-Sealing,
and Oil-Control Systems and Auxiliaries
8:00 am – 5:00 pm

20
Saturday, May 13, 2017

Inspection and Mechanical


Integrity
Inspector Certification Exam Construction – ALL SATURDAY
Breakout 1 MEETINGS
(Invited Guests Only) CANCELLED
7:00 am – 5:00 pm
Inspector Certification Exam Construction –
Breakout 2
(Invited Guests Only)
7:00 am – 5:00 pm
ICP Exam Construction: 936
(Room 1)
7:00 am – 1:00 pm
ICP Exam Construction: 936
(Room 2)
7:00 am – 5:00 pm

21

You might also like