1) Engineering: ARL Upgradation Project 2013
1) Engineering: ARL Upgradation Project 2013
16 80
14
10
Plan Rev.0 (Monthly)
Actual (Monthly) 6
0 -
Project Month 1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Calendar Year 2014 2015 2016
Calendar Month 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06
Plan Plan Rev.0 (Monthly) 0.00 0.00 0.00 0.01 4.16 3.03 4.56 4.75 4.40 4.36 7.04 14.85 16.24 17.20 1.44 7.00 4.42 1.63 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.65 0.00
Rev.0 Plan Rev.0 (Accum.) 0.00 0.00 0.00 0.01 4.17 7.20 11.76 16.51 20.91 25.27 32.31 47.16 63.40 80.60 82.04 89.04 93.46 95.08 95.35 95.35 95.35 95.35 95.35 95.35 95.35 95.35 95.35 95.35 95.35 100.00 100.00
Plan Plan Rev.1 (Monthly) 0.00 0.00 0.00 0.00 4.68 0.00 0.00 0.00 0.00 0.00 0.00
Rev.1 Plan Rev.1 (Accum.) 95.32 95.32 95.32 95.32 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Actual Actual (Monthly) 0.00 0.00 0.79 14.45 4.96 3.61 3.43 2.89 4.38 4.77 8.00 8.52 14.27 7.32 -1.53 9.16 4.75 2.37 1.85 0.54 0.54 0.19 0.00 0.01 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00
Actual (Accum.) 0.00 0.00 0.79 15.24 20.20 23.81 27.24 30.13 34.51 39.28 47.28 55.80 70.07 77.39 75.86 85.02 89.77 92.14 93.99 94.53 95.08 95.27 95.27 95.27 95.27 95.27 95.32 95.32 95.32 95.32 95.32 95.32