0% found this document useful (0 votes)
63 views2 pages

Urgent Notice of Hazard of Fire and Explosion Notice of Major Liability Immediate Action Is Required

This notice informs the utility company CEO that [1] an electronic utility meter was installed without consent, [2] electronic meters pose a fire and explosion hazard due to lack of surge protection, and [3] the CEO is liable for damages if a surge-caused incident occurs. It demands the utility provide surge protection, remove electronic meters, or replace them with electromechanical meters within 7 days, or pay a $1 million penalty for any meter-related incidents. Failure to adequately rebut the notice's claims within 21 days will constitute agreement with its assertions.

Uploaded by

Catalin Enache
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views2 pages

Urgent Notice of Hazard of Fire and Explosion Notice of Major Liability Immediate Action Is Required

This notice informs the utility company CEO that [1] an electronic utility meter was installed without consent, [2] electronic meters pose a fire and explosion hazard due to lack of surge protection, and [3] the CEO is liable for damages if a surge-caused incident occurs. It demands the utility provide surge protection, remove electronic meters, or replace them with electromechanical meters within 7 days, or pay a $1 million penalty for any meter-related incidents. Failure to adequately rebut the notice's claims within 21 days will constitute agreement with its assertions.

Uploaded by

Catalin Enache
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

From:

(name)
(Address)
(Utility account number)

To:
(name and title of of utility company CEO or top officer)
(Utility company address)

(date)

URGENT NOTICE OF HAZARD OF FIRE AND EXPLOSION


NOTICE OF MAJOR LIABILITY
IMMEDIATE ACTION IS REQUIRED

It has come to our attention that you are causing major hazard to our lives and property. You must
immediately correct this problem and remove all hazardous equipment and systems as you maintain our
electric service.

1. You have authorized and ordered the installation of an electronic utility meter on our property
without proper notice and without the consent of the property owner and occupants.

2. The device you have authorized to be installed is an unlawful and hazardous electronic utility
meter which has replaced your safe and lawful electromechanical meters.

3. Electronic utility meters contain flammable electronic components which are destroyed by
explosion and fire in the instance of a high voltage grid line surge.

4. Electronic utility meters have no surge protection as traditional electromechanical meters had.

5. Nationally, thousands of fires and explosions are caused every year by the installation of unsafe
and unlawful electronic utility meters. Curren “standard” and “advanced” electronic utility
meters are all unsafe and unlawful due to lack of surge protection. There is no such thing as a
safe and lawful electronic utility meter because they all lack surge protection and grid surges are
common and regular.

6. You are a top officer at a utility company, therefore it is reasonable to assume that you are aware
of the lack of surge protection in electronic meters and the hazard of explosions and fires those
meters represent. If you were not previously aware of that, you are aware of that after the
delivery of this notice.

7. Being aware of the severe and urgent hazard caused by electronic utility metering you are in
Gross Negligence, Trespass and Criminal Fraud by allowing and authorizing the installation of
an electronic utility meter on our property without full disclosure and without our consent.

We require immediately that, at your expense, full and effective surge protection be installed to remove
all hazards, or that all hazardous metering devices, equipment and systems be removed and replaced
with safe and lawful electromechanical metering equipment with internal surge protection.
By your failure, within 7 days, to provide surge protection or to remove and replace all hazardous
electronic metering equipment as described above, or replacement of hazardous electronic metering
with safe and lawful electromechanical metering, you are agreeing to pay a penalty fee of
$1,000,000.00 plus all damages, expenses, costs of collection and legal fees in the case of any surge-
caused fire, explosion, burning, damaging or disabling of the electronic utility meter which you have
authorized to be installed on our property. Electric utility meters are positioned on our property, so any
hazard to the meter is hazard to our property.

You personally and your company, staff and and shareholders are fully and separately liable for this
obligation. You will pay all claimed amounts within 21 days of delivery of supported claim or be
subject to triple damages and penalties, all due on the original date of claim with interest and additional
penalties accruing.

Any response or rebuttal to this Notice must be received within 21 days, sworn by you for truth under
penalty of perjury, notarized, and prevailing in argument as determined by an arbiter or judge of our
choice. Unsupported denial shall not prevail. Your rebuttal must, with fact, evidence and law, prove the
above assertions to be incorrect. You must promptly provide any additional information or materials we
request in support of your positions. Proof of incorrectness of any point herein shall not diminish the
effect of any other point herein. Any failure of timely prevailing rebuttal to this notice constitutes
agreement with all representations, allegations, statements, declarations and assumptions herein and
agreement to perform as prescribed herein.

Notice to principal is notice to agent and notice to agent is notice to principal.

Sincerely,

__________________________________________

You might also like