Plumbing the art and technique of installing pipes, fixtures, and other apparatuses in buildings for bringing
in the supply of liquids, substances and/or ingredients and removing them; and such water, liquid and
other carried-wastes hazardous to health, sanitation, life and property pipes and fixtures after installation
i.e., the ‘plumbing system’. (Section 217.6 The Revised National Plumbing Code of the Philippines 1999)
PLUMBING SYSTEM
Plumbing System includes all potable water supply and distribution pipes, all
plumbing fixtures and traps; all sanitary and storm drainage systems; vent pipes, roof
drains, leaders and downspouts; and all building drains and sewers, including their
respective joints and connections; devices, receptacles, and appurtenances within the
property; water lines in the premises; potable, tap, hot and chilled water piping; potable
water treating or using equipment; fuel gas piping; water heaters and vents for same.
(Section 217.12 NPC 1999)
1. The water supply and water distribution system. Carries water from the water
source, street main or a pump to the building and to various points in the building
at which water is used.
2. The plumbing fixtures. The receptacles that receive the supplied water and allow
the occupants of the building to use the water.
3. The drainage system. The piping network within the building which conveys from
the plumbing fixtures all wastes and fecal matter (sanitary drainage) as well as
rainwater (storm drainage) to a point of disposal or a treatment facility.
THE PLUMBER
The plumber is the one who works or engages in the business of installing in
buildings the pipes fixtures and other apparatus for bringing in the water supply and
removing liquid and waterborne wastes.
There are three categories of plumbers based upon their graces of experiences. They
are:
1. Apprentice plumber- a beginner at the trade who usually serves for 3 to 5 years
as helper to a journeyman.
2. Journeyman plumber- has served his apprenticeship and is competent to perform
the tasks of installing and repairing plumbing.
3. Master plumber- a person technically and legally qualified and licensed to
practice the profession of master plumbing without limitations in accordance with
Republic Act 1378, having passed the examinations conducted by the
Professional Regulation Commission (PRC), has received a certificate of
registration from the board of master plumbing and possesses the current license
to practice. (Section 214.5 NPC 200)
The improper installation of plumbing may affect the health of the occupants of a
building and create a center point for the spread of disease. The possibility is of
sufficient public interests to require the regulation of plumbing by law. The right of the
government to regulate the details of plumbing is based on the principle of the
protection of public health.
The basic goal of the National Plumbing Code of the Philippines is to ensure the
qualified observance of the latest provision of the plumbing and environmental laws.
1. All premises intended for human use or habitation shall be provided with a
supply of pure and wholesome water, neither connected to unsafe water supply nor
subject to backflow or back- siphonage.
2. Plumbing fixtures, devices and appurtenances shall be supplied with water
in sufficient volume and pressure adequate to function satisfactorily and without undue
noise.
3. Plumbing shall be designed and adjusted to use the minimum quantity of
water consistent with proper performance and cleaning.
4. Devices for heating and storing water shall be so designed and installed as to
prevent dangers from explosion through overheating.
5. Every building abutting on a street, alley or easement with a public sewer
shall connect its plumbing fixtures to the sewer system.
6. Each family dwelling unit shall have at least one water closet, one kitchen
type sink, a lavatory and a bathtub or shower to meet the basic requirements of
sanitation and personal hygiene.
7. Plumbing fixtures shall be made of smooth non-absorbent material, free from
concealed fouling surfaces and shall be located in ventilated enclosures.
8. The drainage system shall be designed, constructed and maintained to
safeguard against fouling, deposit of solids, clogging and with adequate cleanouts
so arranged that the pipes may be readily cleaned.
9. All piping shall be of durable NAMPAP-approved materials, free from
defective workmanship, designed and constructed by Registered Master Plumbers
to ensure satisfactory service.
10. Each fixture directly connected to the drainage system shall be equipped
with a water-sealed trap.
11. The drainage pipes piping system shall be designed to provide adequate
circulation of air free from siphonage, aspiration or forcing of trap seals under
ordinary use.
12. Vent terminals shall extend to the outer air and installed to prevent clogging
and the return of foul air to the building.
13. Plumbing systems shall be subjected to such tests to effectively disclose all
leaks and defects in the workmanship.
14. Substance which will clog the pipes, produce explosive mixtures, destroy
the pipes or their joints or interfere unduly with the sewage-disposal process shall
not be allowed to enter the building drainage system.
15. Proper protection shall be provided to prevent contamination of food, water,
sterile goods and similar materials by backflow of sewage. When necessary, the fixture,
device or appliance shall be connected indirectly with the building drainage system.
16. No water closet shall be located in a room or compartment which is not properly
lighted and ventilated.
17. If there is no sewer system in the area, suitable provision shall be made for the
disposal of building sewage by some accepted method of sewage treatment and
disposal, such as a septic tank.
18. Where a plumbing drainage system may be subject to backflow of sewage,
suitable provision shall be made to prevent its overflow in the building.
19. Plumbing systems shall be maintained in serviceable condition by Registered
Master Plumbers.
20. All plumbing fixtures shall be installed properly spaced, to be accessible for
their intended use.
21. Plumbing shall be installed with due regard to the preservation of the strength
of structural members and the prevention of damage to walls and other surfaces
through fixture usage.
22. Sewage or other waste from plumbing systems, which may be deleterious to
surface or sub-surface waters shall not be discharged into the ground or into any
waterway, unless first rendered innocuous through subjection to some acceptable form
of treatment.
• In 1902, the Plumbing Trade was duly recognized by the government in the City
of Manila. Master Plumber John F. Haas became the first Chief of the Division of
Plumbing Construction and Inspection. A Plumbing Code based on the Plumbing
Code of the United States was incorporated into the Building Code for the City of Manila.
• In 1935, the National Master Plumbers Association of the Philippines
(NAMPAP) was formally organized
• Manila City Ordinance 2411, the “Plumbing Code of the City of Manila” was
enacted and placed under the Department of Public Services, Manila.
• In 1954, the Third Congress approved House Bill No. 962 which in June 18,
1955, became R.A. 1378 “Plumbing Law of the Philippines” upon ratification of
President Ramon Magsaysay.
• On January 28, 1959, the National Plumbing Code of the Philippines
prepared by NAMPAP was promulgated and approved by Malacañang.
• Before Martial Law in 1972, Republic Act No. 6541 otherwise known as the
“Building Code of the Philippines” was passed with the “National Plumbing Code of
1959” as referral code in full text.
• The Professional Regulation Commission (PRC) adopted the Revised
Plumbing Code of 1999 which President Joseph Estrada approved December 21, 1999
pursuant to Section 4 of R.A. 1378 known as the Plumbing Law.
TYPICAL PLUMBING SYSTEM OF A
TOILET AND BATH
CHAPTER 2: PROPERTIES OF WATER
GENERAL
Fresh water from precipitation falling on the ground gradually make its way
through streams, rivers and lakes to oceans or seas as a result. As precipitation hits the
ground, it may follow either of two alternative pathways, which are
A molecule of H2O can absorb a maximum capacity of 12 grains.
(Relative Humidity)
RH= (4/12) x 100= 33%
RH= (10/12) x 100= 83.33%
9. Purified Water- water that undergoes a process where the pollutants are
removed or rendered harmless.
10. Polluted Water- water that contains one or more impurities that make the
water unsuitable for a desired use.
11. Gray Water- water drained from lavatories, sink, laundry trays and showers;
contains minor pollutants.
12. Black Water- water drained from water closets and urinals; carries body
wastes and contains major pollutants.
13. Storm Water- rainwater drained from roof gutters and downspouts.
WATER QUALITY PROBLEMS AND THEIR CORRECTION
PROBLEM CAUSE EFFECT CORRECTION
1. Acidity Contains carbon Corrosion of Passing the water
dioxide. Cistern and nonferrous pipes, through a bed of
pond waters rusting and clogging crushed marble or
containing decaying of steel pipes. limestone to
vegetation are likely achieve alkalinity, or
to be acidic adding sodium
silicate.
2. Hardness Presence of Clogging of pipes. Introduction of water
Magnesium and Impaired laundering softeners made up
Calcium and food of Zeolite (a
preparation. greenish granular
material)
3. Turbidity Silt or suspended Discoloration and Filtration
matters picked up in bad taste.
surface or near
surface flow.
4. Color Presence of Iron Discoloration of Precipitation by
and Manganese fixtures and Laundry filtration through
manganese zeolite
(oxidizing filter)
5. Pollution Contamination by Disease Chlorination
organic matter or
sewage
WATER PURIFICATION
Water purification is any method that will remove one or more materials that
make the water unsuitable for a given use. The methods that are commonly used in
water purification are:
1. Settling or Sedimentation
2. Filtration
3. Adsorption/ Flocculation-Coagulation
4. Aeration
5. Distillation
6. Disinfection/ Chlorination
The natural water includes all of these purification methods except disinfection.
Sitting in lakes, ponds, or the oceans, water is subject to settling (sedimentation). As
it percolates through soil or porous rocks, it is filtered (filtration). Soil and humus are
also good chemical adsorbents (coagulation/ flocculation). As water flows down
streams and rivers, detritus is removed by biological oxidation (aeration). As water
evaporates and condenses, it is distilled (distillation).
Thus, numerous freshwater sources might be safe to drink were it no for human
pollution. The most serious threat to human health is contamination with
diseasecausing organisms and parasites, which come from the excrements of
humans and their domestic animals. In human settlements, one can see how the
organisms may get into water and be passed onto people before any of the natural
purification processes can work.
THE METROPOLITAN CEBU WATER DISTRICT (MCWD)
The Metropolitan Cebu Water District (MCWD) is the sole commercial provider in
Metro Cebu comprising of four cities and four municipalities. As of year 2000,
MCWD served 40% of the total population of Metro Cebu.
MCWD is primarily tasked to deliver adequate, safe, potable and affordable water to
is conssionares.
1. Ground Water
2. Surface Water
Ground water sources are naturally and presumably purified by a compact thick
filter media layer of ungraded sands, soils and rocks at considerable depth. Hence,
disinfection using Chlorine Gas and other Chlorine Salts is the only treatment process
employed. Here, water that is extracted from their ground through a pumping equipment
is allowed to pass through chlorination facility using chlorine gas to kill any presence of
coliform organisms and other froms of bacteria. Water is the stored in a reservoir ready
for distribution into each concessionaire’s faucet.
At certain areas in the distribution network, Direct feed pumping stations are
employed to augment the water supply. These are strategically located in different
areas Metro Cebu.
Runoff or surface water is first stored in dam. From this, water goes through a
series of treatment processes.
Buhisan Dam is Cebu’s first and only dam MCWD’s only surface water source. It
supplies the Tisa (Labangon) filter plant with up to 600 cubic meter per hour (600,000
liters per hour or 158,400 gallons per hour) or about an average of 4,000 cubic meter
daily (4 million liters or 1.05 million gallons).
This dam is located in Buhisan, a southern mountain baranggay of Cebu City. This was
designed by 27 year-old Eusebius Julius Halsema. AG and P, the winning bider, asked
Php 463, 628.00 to do the work. On November 10, 1911, the dam was completed and
ready to be filled.
With a height of 27 meters, the concrete dam has a conical arch design which
transfers the stress in the reservoir (caused by water strain) to the sides of the dam
thereby anchoring it firmly in place.
Three 4.5 meter wide flood gates exist for flood control purposes. Its long
concrete spillway allows overflow water to escape safely when the dam gates are
raised.
Two kilometers of raw water main pipes extend from the dam to the distribution
reservoir in Tisa. From the latter, a four kilometer pipeline distributes water to
concessionaires in Cebu City. Another 21 kilometers of pipelines were also laid for
improved water distribution.
Today the almost 100 year old Buhisan Dam is as strong as when it first
operated.
TREATMENT PROCESS
MCWD treats the surface water using the conventional process comprising of the
following:
1. Aeration
2. Coagulation- Flocculation
3. Sedimentation
4. Filtration
5. Disinfection/ Chlorination
1. Aeration- Water is sprayed into the air to release any trapped gases and absorb
additional oxygen for better taste.
2. Coagulation- Flocculation- This is the process by which small sediment particles
which do not settle well combine together to form larger particles which can be
removed by sedimentation. This process includes physical and chemical
process:
After the processes, water is stored in a reservoir, then to the transmission mains, then
to the, distribution lines, down to the service connections and lastly to the
concessionaire’s faucet.
SURFACE WATER SUPPLY AND TREATMENT SYSTEM
Water is taken from the water shed reservoir and piped to the treatment plant. At
the plant, (1) water is aerated to release trapped gases and to absorb oxygen for better
taste, (2) Alum/tawas (aluminum sulfate) is added to coagulate organic particles, and
(3) the water is put into a settling basin for several hours to allow coagulated particles to
settle. It is then (4) filtered through sand filters, (5) Chlorine is added to kill bacteria and
put into a storage tank for distribution to concessionaires.
CHAPTER 3: PLUMBING FIXTURES
FIXTURES- receptacles attached to a plumbing system other than a trap in which water
or waste may be collected or retained for ultimate discharge into the plumbing system.
1. ONE-PIECE WATER CLOSET- The water closet fixture is manufactured with the
bowl and the flush tank molded into a single unit. Usually used in tandem with the
bidet.
2. CLOSED COUPLED WATER CLOSET- a water closet where in the flush tank is
separate but is attached to the toilet bowl. It is a two-piece model.
3. PAIL FLUSH WATER CLOSET- a water closet comprising only of a bowl without
a flush tank. Flushing action is obtained only through water poured from a pail or
bucket. This is used in areas where running water systems are not available.
4. SQUAT BOWL WATER- A water closet that is otherwise known as “Eastern type”
since the user assumes a squatting position rather than a sitting position.
C. TYPES OF WATER CLOSET AS TO FLUSING MECHANISM
1. Flush tank
2. Flush Valve (flushometer)
1. FLUSH TANK- holds a supply of water for flushing a fixture such as the water
closet. It has a capacity of 5 to 6 gallons.
2. FLUSH VALVE- valve designed to supply a fixed quantity of water for flushing
purposes. It is activated by direct water pressure without the use of a flush tank.
It is also known as Flushometer or Flushometer valve. The flush valve requires
10 to 20 psi flow pressure.
1. Round Front
2. Elongated Front
1. ROUND FRONT- intended for installation on a limited space.
QUALITY OF FIXTURES
i. Dense
ii. Durable
iii. Non-absorbent
iv. Smooth, Impervious Surface
v. Free form unnecessary concealed fouling surfaces
VENTILATION OF T &B
i. Ceiling mount exhaust fan duct type. ii. Thermal exhaust fan
LAVATORY- a fixture designed for the washing of the hands or face. It is also known as
wash basin.
• TYPES OF LAVATORY
2. Pedestal Lavatory
a. Center Set
b. Wide Spread
• ROUGHING-IN OF LAVATORY
• MINIMUM LAVATORY CLEARANCE
a. Vitreous China
b. Enameled Cast Iron
c. Stainless Steel
d. Plastic
BIDET- a plumbing fixture used for washing the middle part of the body, especially the
genitals. It is also known as the Sitz Bath.
- Setting and clearance for bidet shall be the same as in the water closet.
- Bidet minimum trap diameter is 38mm and its DFU value is 2.
- Size of water supply is 12mm and WSFU is 2 (private) or 4 (public)
BATH TUB- a tube for bathing, usually a fixed plumbing installation designed for one
person. It is available in left outlet and right outlet.
URINAL- A sanitary fixture equipped with a water supply and drain for flushing away
urine.
TYPES OF URINAL
2. Pedestal Urinal
3. Stall Urinal
4. Trough Urinal
SINKS
DRINKING FOUNTAIN
SHOWER BATH
FLOOR DRAINS
HOSE BIBB
• Size of water supply is 12mm Φ and the WSFU value is 3 (private use) or 5 (public
use)
KITCHEN SINK- a plumbing fixtures usually consisting of a basin with a water supply,
connected with a drain.
e. Corner Sink
• SLOP SINK- A deep sink, usually set low and used by janitors for emptying pails
of dirty water and mop cleaning.
• DRINKING FOUNTAIN- A fixture consisting of a shallow basin, together with a
water jet designed to provide potable water for human consumption.
• LAUNDRY TUB- A deep wide sink or but used for washing clothes. It is also
known as Laundry Tray or Set Tub.
• SHOWER BATH- An apparatus for spraying water on the body, usually from
above. Drain is through the shower bath floor drain.
• SCRUB SINK- a plumbing fixture usually located in the operating room in a
hospital to enable personnel to scrub their hands prior to a surgical procedure;
the hot and cold water supply is activated by a knee-action mixing valve or by
wrist or pedal control.
PLUMBING UNIT (Sec. 217.13 NPC 1999)
The minimum standard quantities of plumbing fixtures that discharge waste into a
plumbing installation include;
1 water meter
1 water closet
1 lavatory
1 shower head and drain for a bathtub or shower stall
1 kitchen sink
1 laundry tray
3 floor drains
4 faucets/ hose Bibb
2. The dam or threshold shall not be less than 51mm nor more than 228mm in
depth, when measured from the top of the dam or threshold to the top of the
drain.
PLUMBING ACCESSORIES
1. Soap holder
2. Paper holder
3. Toothbrush and tumbler holder
5. Seat Cover
1. SOIL DRAINAGE SYSTEM- The piping that conveys the discharge of water
closets or fixtures having similar functions (containing fecal matter), with or
without the discharges from other fixtures.
3. STORM DRAINAGE SYSTEM- The piping system that receives clear water
drainage from leaders, downspouts, surface run-off, ground water, subsurface
water, condensate water, cooling water or other similar discharges and conveys
them to the point of disposal. All sanitary wastes must be excluded.
4. VENT SYSTEM- the piping system that receives a flow or air to or from a
drainage system or to provide a circulation of air within such system to protect
trap seals from siphonage or back pressure.
a. The piping must be air tight, gas tight and water tight.
b. Each plumbing fixture, except those with integral traps, shall be separately
trapped by an approved type water seal trap. This is to prevent odor-laden and
germ-laden to rise out of the drainage system and contaminate the surrounding
air in the room.
c. Each plumbing fixture trap shall be provided with vent pipes. This is to protect the
drainage system against siphonage and back pressure and to assure air
circulation throughout the drainage system.
e. All horizontal piping shall be run in practical alignment and at a uniform grade of
not less than 2% or 2 cm per meter toward the point of disposal.
f. All horizontal piping shall be supported and anchored at intervals not to exceed 3
meters.
g. Vertical piping shall be secured at sufficiently close intervals to keep the pipe in
alignment. Stacks shall be properly supported at their bases.
DEFINITION FROM NPC 1999 EDITION
HOUSE / BUILDING DRAIN- part of the lowest horizontal piping of a plumbing system,
which receives the discharges from the soil, waste and other drainage pipes inside of a
building and conveys it to the house sewer outside of the building.
HOUSE / BUILDING SEWER - extends from the house drain at a point 0.60 meters
from the outside face of the foundation wall of a building to the junction with the street
sewer or to any point of discharge, and conveying the drainage of one building site. No
house/building sewer shall be smaller than 150mm in diameter, nor less in size than the
house/building drain
WASTE PIPE - conveys only wastewater or liquid waste free of fecal matter.
SOIL PIPE- any pipe which conveys the discharge of water closet, urinal or fixtures
having similar functions, with or without the discharges from other fixtures to the
building drain or building sewer.
SOIL STACK PIPE- a vertical soil pipe conveying fecal matter and waste water.
VENT PIPE - used for ensuring the circulation of air in a plumbing system and for
relieving the negative pressure exerted on trap seals.
VENT STACK- the vertical vent pipe installed primarily for providing circulation of air to
and from any part of the soil, waste of the drainage system.
PRIVATE SEWAGE DISPOSAL SYSTEM- a septic tank with the effluent discharging
into a subsurface disposal field, seepage pits or of such other facilities or may be
permitted by the plumbing code.
DOWN SPOUT- A vertical pipe which conveys rain water, also known as conductor or
rain water.
STORM DRAIN- Receives storm water , clear, rain or surface-water waste (SD)
CATCH BASIN- A receptacle in which liquids are retained for a sufficient period of time
to allow materials to settle to deposit.
TRAP- A fitting or device designed and constructed to provide, when properly vented, a
liquid seal which prevents the backflow of foul air or methane gas without materially
affecting the flow of sewage or waste water through it.
MATERIALS USED FOR THE PLUMBING DRAINAGE SYSTEM APPROVED BY THE
1999 NATIONAL PLUMBING CODE.
1. Cast iron
2. Ductile iron
3. Galvanized steel (shall not be used underground. Kept at least 152mm above ground)
4. Galvanized wrought iron (shall not be used underground. Kept at least 152mm above
ground)
5. Lead
6. Copper
7. Brass
8. Series 1000, pvc, dmv
9. Extra strength vitrified clay pipe (shall not be used above ground. At least
300mm below finish ground level.)
10.Approved material having smooth and uniform bore
NOTE: ABS and PVC DWV can be used in high rise buildings at the discretion of the RMP
and with the full consent of the owner.
DRAINAGE FITTING
1. Cast Iron
2. Malleable
3. Lead
4. Brass
5. Copper
6. ABS
7. PVC
8. Vitrified clay
VENT PIPES
1. Cast iron
2. Ductile cast iron
3. Galvanized steel
4. Galvanized wrought iron
5. Lead
6. Copper
7. Brass
8. Schedule 40, ABS, DWV
9. Series 1000, PVC, DWV
VENT STACKS
1. Copper
2. Cast iron
3. Galvanized wrought iron
4. PVC
VENT FITTINGS
1. Cast Iron
2. Galvanized malleable iron
3. Galvanized steel
4. Lead
5. Copper
6. Brass
7. ABS
8. PVC
1. Cast iron
2. Galvanized steel
3. Iron
4. Brass
5. Copper
6. Lead
7. Sched 40, ABS, DMV
8. Series 1000, PVC, DWV
1. 26 GA, Galvanized sheet metal with steel pipe or cast iron at its lowest section draining
to the catch basin.
ROOF DRAIN
1. Cast iron
2. Copper
3. Other corrosion resistant materials TRAPS (SEC. 1003 NPC 1999)
1. ABS
2. Cast brass
3. Cast iron
4. Lead
5. PVC
Figure 2- The function of the trap and one of the several functions of a vent preventing
siphonage.
LOSS OF TRAP SEAL- This failure can be attributed directly to inadequate ventilation
of the trap and the subsequent minus and plus pressures which occur in the piping
system. See figure 3.
1. Siphonage- The withdrawal of a liquid from a trap due to a suction caused by liquid flow in a
pipe.
a. Direct Self- siphonage
b. Indirect or Momentum Siphonage
2. Back Pressure- pressure developed in opposition to the flow of liquid in a pipe due to friction,
gravity or some other restriction to flow of the conveyed fluid. Excessive pressure at the lowest
branch causing trap seal to look for opening.
3. Evaporation- Occurs when a fixture is not used for a long time. A Deep seal is the best solution
but clogs the pipe due to accumulated solid wastes.
4. Capillary Attraction- foreign objects in the traps absorbing trap seal
5. Wind Effects- strong winds through the vent system forcing water out of the trap
SUPPORTS- are devices for holding and securing pipes and fixtures to walls, ceiling, floors
or structural members. Supports include hangers, anchors, brackets, and cradles.
1. Evaporative cooler
2. Air Washer
3. Air Conditioner
4. Cold Storage Room
5. Refrigerator
6. Cooling Counter
7. Food and Drinks Storage
8. Culinary/ Dishwashing Sink for food preparation Room
Cooling and air conditioning equipments may be separated by an *airbreak.
Food equipments shall be separated from the drainage system by a full *airgap.
*Airbreak- a physical separation, which may be a low inlet into the indirect waste receptor
from the fixture, appliance or device indirectly connected, at least 25mm.
*Airgap, drainage.- the unobstructed vertical distance through the free atmosphere
between the lowest opening from any pipe, plumbing fixture, appliance or appurtenance
conveying waste to the flood level rim of the receptor.
The drainage system is composed of groups of pipes and fittings that convey waste
from the building to the proper means of disposal system.
1. Building Sewer- That part of the horizontal piping of a drainage system which
system which extends from the end of the building and which receives the
discharge of the building drain and conveys it to the public sewer, private sewer,
individual sewage disposal system or other point of disposal.
2. Building drain- the part of the lowest horizontal piping of a plumbing system which
receives the discharge from soil, waste and other drainage pipes inside of a
building and conveys it to the house sewer.
3. Sewage Disposal System. A system for the treatment and disposal of domestic
sewage by means of a septic tank, cesspool, or mechanical treatment, all designed
to serve a single establishment, development or building.
The drainage piping system contains fittings that serve as drains, traps and vents.
Drains- fittings used for draining fluid from point of use to the piping system.
Traps- fittings or device designed and constructed to provide a liquid seal which prevent
the back passage of air without materially affecting the flow of sewage or water through
it.
Vents-pipes and fittings installed in the system to provide air circulation so as to protect trap
seals from siphonage and back pressure.
NOTE:
Grease trap is not required for individual dwelling units or for any private living quarters.
(sec. 1011.1, NPC 1999)
: No food waste disposal unit shall be connected to or discharged into any grease trap.
(Sec 1013, NPC 1999)
C= M x W x R x F NOTE:
WHERE: 1 Cubic meter= 264 gallons
F= Storage Factors
• Fully equipped commercial kitchen
8 hour operation: 1
18 hour operation: 2
24 hour operation: 3
• Single service kitchen: 1.5
SAMPLE PROBLEM;
Determine the capacity and volume of the grease trap for a canteen that serves an
average of 50 meals a day that is open from 11:00 am to 7:00pm.
SOLUTION: S= M x W x R x F = 50 x 5 x 2.5 x 1
S= ? = 625 gallons
M= 50 meals
W=5 cal/ meal/ day
R= 2.5 hours
F= 1
• For grease traps the serve non-scheduled meals to a nonspecific number of occupants,
as in restaurants, fast foods services and luncheonettes;
C = 0.09 (K x N x H x G x S)
Where:
C= Liquid capacity
K= Facility access coefficient
= 1.25 for freeways
= 1.00 for recreation areas
= 0.80 for main highways
= 0.5 for lesser roads
N= number of seats (use fractional value if occupancy is rarely full)
H= Number of hours per day of operation
G= Waste flow rate (general value is 4.5 Gals)
S= Sewage capacity factor
= 1.7 for outflow to public sewer
= 2.5 for outflow to opposite disposal
• For grease traps that serve scheduled meals to a specific number of occupants as
in hospitals , nursing homes and schools;
C= 0.14 (M x G x S)
Where;
Circuit vent or loop vent. The portion of the drainage system which ventilates two
or more fixture traps that discharge into a soil or waste branch.
SOIL APPLICATION RATE
PERCOLATION (GPD/ SQ. METER)
RATE (25mm) (1”)
1 minute 57.00
2 minutes 46.22
5 34.40
10 24.73
15 19.35
20 16.12
60 * Revise
distan5.34 D=