0% found this document useful (0 votes)
64 views

Internal Verification: Higher National Diploma in Computing (RQF)

This document provides an internal verification of an assignment for a Higher National Diploma in Computing student. It verifies that the assignment details are accurate, assesses if the tasks address the intended learning outcomes and criteria, and ensures the assignment is appropriate. The assignment being verified is for a project on developing an attendance tracking system that stores employee attendance data in an Azure cloud database. It consists of two tasks - the first task involves creating a project plan, and the second involves researching methodologies to meet the project aims and objectives. The internal verifier signs off that the assignment is fit for purpose after reviewing it.

Uploaded by

Shakil Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Internal Verification: Higher National Diploma in Computing (RQF)

This document provides an internal verification of an assignment for a Higher National Diploma in Computing student. It verifies that the assignment details are accurate, assesses if the tasks address the intended learning outcomes and criteria, and ensures the assignment is appropriate. The assignment being verified is for a project on developing an attendance tracking system that stores employee attendance data in an Azure cloud database. It consists of two tasks - the first task involves creating a project plan, and the second involves researching methodologies to meet the project aims and objectives. The internal verifier signs off that the assignment is fit for purpose after reviewing it.

Uploaded by

Shakil Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

HND

Internal Verification

School School of IT
Qualification Higher National Diploma in Computing (RQF)
Unit No & Title CSD RQF 6, Managing a Successful Computing Project
Assessor H M Mostafizur Rahman Semester Spring Semester(2020-1)

Learning outcomes/criteria being addressed

LO1 LO2 LO3 LO4


 

Indicate Which Grade Descriptors Identified

Pass Merit Distinction


P1, P2, P3, P4 M1, M2 D1

Comments

Assignment 01 is taken.

Assessor Signature Date

H M Mostafizur Rahman 05.01.2020


Internal Verifier Checklist

Is this assignment for whole or part of a unit? W/P

Are accurate programme details shown? Y/N*

Are accurate unit details shown? Y/N*

Are clear deadlines for assessment given? Y/N*

Are assessment criteria to be address listed? Y/N*

Does each task show which learning outcomes and


Y/N*
criteria are being addressed?

Are these criteria actually addressed by the tasks? Y/N*

Are Grade Indicative Characteristics clear? Y/N*

Is it clear what evidence the learner needs to


Y/N*
generate?

Are the activities appropriate? Y/N*

Is there a scenario or vocational context? Y/N*

Are the level, language and presentation appropriate Y/N*

Is the timescale for the assignment appropriate? Y/N*

Overall is the assignment fit for the purpose? Y/N*

* If “No” is recorded and the Internal verifier recommends remedial action before the brief is issued, the
Assessor and the Internal Verifier should confirm that the action has been undertaken.

Internal Verifier Name Signature Date

05.01.2020
Action Required

Actions Taken

Confirmation that assignment is now ready for issue?

Assessor Signature Date Internal Verifier Signature Date


05.01.2020 05.01.2020
Assignment 01:
Project aims, objectives of a project

Aim:
LO1 Establish project aims, objectives and timeframes based on the chosen theme.
LO2 Conduct small-scale research, information gathering and data collection to generate
knowledge to support the project.
___________________________________________________________________
Scenario:
An attendance system allows to add the attendance of the employee who is present on that day. The user has to
login and swipe their identity card to mark their attendance. As the card has been swiped, the details like id
number, date, in-time, out-time are saved in the database. The database will be stored into the azure cloud which
will form a connection between application and cloud server via internet. With the in-time and out-time data
stored in cloud, the admin can calculate the working hours of the employees. The employees can view his
personal details, attendance, in-time or out-time, total working hours after he/she logs into the system. This data
is retrieved from the cloud database and can be accessed any time by the employee and the admin. The admin of
the system can add new employee by registering the new employee and filling up their registration details. The
admin is authorized to view the records of all the employees. This system allows to keep up to date record of the
employee. As, the project files and a database file will be stored into the Azure cloud, the project will be
accessed in the web browser through Azure link.
Tasks (Covering LO1 and LO2; Grading Criteria: P1, P2, P3, P4, M1, M2 and D1)
Produce a comprehensive project management plan, milestone schedule and project schedule for monitoring
and completing the aims and objectives of the project. [M1]
Task 01
a) Devise project aims and objectives for the above scenario. [P1]
b) Produce a project management plan that covers aspects of cost, scope, time, quality, communication,
documentation, risk and resources. [P2]
c) Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for
completion. [P3]
Task 02
d) What do you understand by research method? For meeting the project aims and objectives carry out
small-scale research using research methods like quantitative and qualitative research. [P4]
You are required to record your weekly activities and achievements on the Project Logbook Template,
provided with the assignment. Your weekly log should be presented to your tutor for supervision on
weekly basis.
Moreover, you must evaluate the accuracy and reliability of different research method mentioned for
P4. [M2]
e) Critically evaluate the project management process and appropriate research methodologies applied.
[D1]

Feedback Day: 8th February, 2020


Hard Copy Submission: 13th February, 2020

***Don’t include assignment brief in Plagiarism Check***

You might also like