1. The document is a quiz test for a Software Project Management subject taken by a student from DIT University, Dehradun. 2. It contains 20 multiple choice questions related to software engineering concepts like the Unified Modeling Language, software development life cycle phases, software testing, maintenance, and risk management. 3. The student is asked to choose the correct answer for each question and sign the document before submitting it within the 10 minute time limit.

Uploaded by

Mohit Saini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views4 pages

Dit University, Dehradun

1. The document is a quiz test for a Software Project Management subject taken by a student from DIT University, Dehradun. 2. It contains 20 multiple choice questions related to software engineering concepts like the Unified Modeling Language, software development life cycle phases, software testing, maintenance, and risk management. 3. The student is asked to choose the correct answer for each question and sign the document before submitting it within the 10 minute time limit.

Uploaded by

Mohit Saini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

DIT UNIVERSITY, DEHRADUN

SECOND QUIZ TEST (EVEN SEMESTER - 2017-18)

Name of the student …………………….. University Roll No. ……….


Subject: Software Project Management Subject Code: IA8680 Max Marks: 10
Semester: 8th Branch/Section: B.Tech (IT)/Elective-IV Time: 10 Min.

Signature of Student _____________ Signature of Invigilator: ______________

Note: No student is allowed to leave the examination hall before the completion of the exam.
Tick the correct answer, over writing/multiple answers will be treated as wrong answer.

1. How many diagrams are here in Unified Modelling Language?


a) six
b) seven
c) eight
d) nine

2. Which one of the following is not a step of requirement engineering?


a) elicitation
b) design
c) analysis
d) documentation

3. Which of the following is an important factor that can affect the accuracy and efficacy of estimates?
a) Project size
b) Planning process
c) Project complexity
d) Degree of structural uncertainty

4. Which one of the following models is not suitable for accommodating any change?
a) Build & Fix Model
b) Prototyping Model
c) RAD Model
d) Waterfall Model

5. Which model can be selected if user is involved in all the phases of SDLC?
a) Waterfall Model
b) Prototyping Model
c) RAD Model
d) both Prototyping Model & RAD Model
6. Which of the following categories is part of the output of software process?
a) computer programs
b) documents that describe the computer programs
c) data
d) all of the mentioned

7. Which of the following option is not tracked by configuration management tools?


a) Tracking of change proposals
b) Storing versions of system components
c) Tracking the releases of system versions to customers
d) None of the mentioned

8. Software Maintenance includes


a) Error corrections
b) Enhancements of capabilities
c) Deletion of obsolete capabilities
d) All of the mentioned

9. What type of software testing is generally used in Software Maintenance?


a) Regression Testing
b) System Testing
c) Integration Testing
d) Unit Testing

10. Which regression test selection technique exposes faults caused by modifications?
a) Efficiency
b) Precision
c) Generality
d) Inclusiveness

11. The process of generating analysis and design documents is known as


a) Software engineering
b) Software re-engineering
c) Reverse engineering
d) Re-engineering

12. Which one of the following is not a maintenance model?


a) Waterfall model
b) Reuse-oriented model
c) Iterative enhancement model
d) Quick fix model

13. Choose the suitable options with respect to regression testing.


a) It helps in development of software
b) It helps in maintenance of software
c) It helps in development & maintenance of software
d) none of the mentioned
14. Which is the first step in the software development life cycle?
a) Analysis
b) Design
c) Problem/Opportunity Identification
d) Development and Documentation

15. Which tool is use for structured designing?


a) Program flowchart
b) Structure chart
c) Data-flow diagram
d) Module

16.  How is throwaway prototype different from evolutionary prototype?


a) It involves successive steps
b) It involves just one task
c) The prototype is built with the idea that it will eventually be converted into final system
d) It has a shorter development time

17. Which one of the following is not a fundamental activity for software processes in software
engineering?
a) Software Verification
b) Software Validation
c) Software design and implementation
d) Software evolution

18. Which of the following are parameters involved in computing the total cost of a software development
project?
a) Hardware and software costs
b) Effort costs
c) Travel and training costs
d) All of the mentioned

19. Which of the following costs is not part of the total effort cost?
a) Costs of networking and communications
b) Costs of providing heating and lighting office space
c) Costs of lunch time food
d) Costs of support staff

20.  What all has to be identified as per risk identification?


a) Threats
b) Vulnerabilities
c) Consequences
d) All of the mentioned
Answers:
1. d
2. b
3. a
4. d
5. C
6. d
7. D
8. d
9. a
10. d
11. c
12. a
13. c
14. c
15. b
16. b
17. a
18. d
19. c
20. d