Renovation, Alteration and Addition Word
Renovation, Alteration and Addition Word
Renovation, Alteration and Addition Word
Assignment 1
• Introduction
• Background
• Survey Area
• Survey Team
• Survey Date
• Survey Method
• Limitations
• Limitation to Access
• Survey Findings
• Recommendations/Suggestions
• Conclusion
• Programme
Introduction
The flat size of the Saleable Areas (sqm) is about 11.2-34.2. It was suitable
1-4 peoples to live. It had 22 floors (For residential from 4 to 22/F, Office and
Shop from 2 to 3/F). Also, Owners' Corporation was formed in 90s.
On WO House
Survey Area
Lift
Switch Room
Common Area and Facilities
Corridors
Survey Team
For survey team of this assignment, I totally work and complete relating to
information, such as photographs, Deed of Mutual Covenant (DMC), useful
website and notes……etc. As for the repair of defects of On WO House, it was
completed by registered contractors and workers.
Survey Date
The survey was inspected from 6/10 to 8/10 in On WO House. The scope of the
survey includes external wall, stairways, ceiling, fire hose reels, lift lobbies and
par. The detail of survey date is following the section:
a) External Wall----8/10
b) Stairways-----8/10
c) Ceiling-----8/10
e) Lift Lobbies-----6/10
f) Parapet-----8/10
Survey Method
1. External Wall
a) Visual Survey. A rapid scanning of the building with viewing from the
ground level or accessible roof areas using binoculars is carried out to
identify the locations and extent of the typical defects.
b) De-bonding Survey. De-bonding of rendering or potential falling tiles, a
more detailed de-bonding survey may be undertaken to find out the
locations and extents of defects. Test includes Hammer Tapping.
2. Interior Reinforcement Concrete Structure (Ceiling, beam, stairways……
etc.)
a) Visual Survey. Check the latest inspection date and fire hose reels should
be examined every quarterly. Inspect all fire hose reel, nozzles, valves,
fittings and ensure that they remain intact, not damaged or misused for
other purposes.
5. Electrical Wires
Limitation to Access
Limitation to Access
Go to Attic before on 22/F (First stairway)
Limitation to Access
Water Meter Room
c) Poor workmanship.
d) Thermal movement
Survey Findings (2)
Paint peeling on ceiling
This defect generally found the stairways and lift lobbies on the ceiling.
Possible Cause of Paint Peeling:
a) Poor workmanship.
c) Thermal movement.
a) Thermal movement.
b) Poor Workmanship.
d) Poor design.
Recommendations/Suggestions
Conclusion
There was a cost estimate to explain the item of repair works about On WO
House, it included Mosaic tiles repair work, painting, reinforcement concrete
repair work and labour. For the total budget of On WO House repair works, I
estimated about $23190. It included Mosaic tiles repair work (external wall)
$1350, painting $2640, reinforcement concrete repair work $2200 and labour
$17000.
Programme
For the Painting, I recommended Flower painting to paint in the ceiling. Flower
Painting was more famous brand in Hong Kong. It provides more choice for
painting works such as waterproof painting.
b) Bill of Quantities
Site Survey
↓
Start the repair works
↓
Renovation
↓
Finish the repair works
↓
Inspection