IBMBlueMethod-Implement Phase Overview

The Implement phase of the IBM Blue Method configures the package to meet business requirements. Required interfaces are built, users trained, infrastructure put in place, and deployment plans developed. This phase also ensures cut-over to the new system through final data conversion and other activities necessary to bring the new system live within the business while establishing support procedures.

Uploaded by

Li Min Zhu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

IBMBlueMethod-Implement Phase Overview

The Implement phase of the IBM Blue Method configures the package to meet business requirements. Required interfaces are built, users trained, infrastructure put in place, and deployment plans developed. This phase also ensures cut-over to the new system through final data conversion and other activities necessary to bring the new system live within the business while establishing support procedures.

Uploaded by

Li Min Zhu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

IBM Blue Method - Implement phase

Business Package Plan Design Implement Manage/Run


Assess
Prepare Assess

Design Run

It is in the Implement Phase where the package is configured to meet the requirements
of the business.

Required system interfaces are built, end users trained, IT infrastructure put in place and
plans for final deployment of the system are developed during this phase.

This phase also ensures cut-over to the new system. Final data conversion is completed
in this phase along with other activities necessary to bring the new system to life within
the business.

Support procedures are established at this time to ensure the ongoing success of the
business transformation.