Engineering: Pt. Bukit Darmo Property, TBK

The engineering report discusses modifications to fire fighting systems for an apartment complex and hotel. It provides a bill of quantities for the work, including supplying and installing new or modified piping, valves, switches and other components for the fire sprinkler and hydrant systems. The report estimates the total material cost to be Rp. 70,854,400 and total labor cost to be Rp. 70,000,000 for a grand total of Rp. 154,939,840 after taxes. It breaks down the costs by apartment tower, other buildings, and the hotel.

Uploaded by

Ayah'e Bhino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views14 pages

Engineering: Pt. Bukit Darmo Property, TBK

The engineering report discusses modifications to fire fighting systems for an apartment complex and hotel. It provides a bill of quantities for the work, including supplying and installing new or modified piping, valves, switches and other components for the fire sprinkler and hydrant systems. The report estimates the total material cost to be Rp. 70,854,400 and total labor cost to be Rp. 70,000,000 for a grand total of Rp. 154,939,840 after taxes. It breaks down the costs by apartment tower, other buildings, and the hotel.

Uploaded by

Ayah'e Bhino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

 

ENGINEERING
REPORT
PT. BUKIT DARMO PROPERTY, TBK.
Rev. 01

FIRE FIGHTING SYSTEM – APARTMENT ADHIWANGSA

PIPA FF TIDAK ADA AIR/KOSONG, DAN/ATAU POMPA TERUS-MENERUS “ON-OFF”


JIKA DIJALANKAN
+
4
j ld
I rtr
li
lw

I 7o<
+ G}
tll
nu =
4 g
ffi oo=
N
a
I
4
Z
1

z
t5
\n

d
tfr
>
>
z
o
APARTIV\ENT,

- SPRIFiKLFR

* 08': Iv\rllN RtgER

- Q6'l

5fl,qFT

Puvrp + '-.*J
Rootrt -+ TOWER.B

6UDAtq6

lN5TALAgl TFRPASAT.{€,
APARTMENT ADHIWANGSA 
TOWER - B

 
PT. BUKIT DARMO PROPERTY TBK. BILL OF QUANTITY

Total
Item Qty Unit
Modifikasi Instalasi FINAL SUMMARY
No.
Fire Fighting Material Labour
A B C D E F

A. Bill No. 1.1 : Apt. Adhiwangsa 1 Lot 36.012.200 35.000.000,00

B Bill No. 1.2 : 9 Blv 1 Lot 12.410.000 17.500.000,00

C Bill No. 1.3 : Hotel 1 Lot 22.432.200 17.500.000,00

Sub Total 70.854.400 70.000.000,00

Sub Total (Material + Upah) 140.854.400,00

PPN 10% 14.085.440,00

Grand Total 154.939.840,00


(Estimated)
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.1:


Rate Total
Item Modifikasi Qty Unit
No. Instalasi Fire Apt. Adhiwangsa
Material Upah Material Upah
Fighting
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang


instalasi Fire Fighting (Riser Hydrant dan Riser
Sprinkler) terpasang sesuai gambar terlampir,
lengkap accessories dan/atau piping devices
termasuk piping circuit yang dibutuhkan agar
berfungsi dengan baik dan benar.

1. Carbon steel pipe Ø 8" 9 mtr 645.000 5.805.000


ASTM A53, Schedule 40
2 Knee Ø 8" 4 nos 506.550 termasuk 2.026.200 termasuk
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 15 nos 1.750.000 26.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 8 nos 15.000 termasuk 120.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 0 Sets 15.000 termasuk - termasuk
9 UNP 100 for Pipe Bracket 6 mtr 120.000 termasuk 720.000 termasuk
10 Strap for Pipe Bracket, (25 x 3)mm 6 mtr 50.000 termasuk 300.000 termasuk
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 1 no 25.000 termasuk 25.000 termasuk
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 25 Sets 4.000 termasuk 100.000 termasuk
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 12 Sets 18.000 termasuk 216.000 termasuk
14 Primary Paint 1 Kg 100.000 100.000
15 Top Coat Paint, Red 1 Kg 250.000 250.000

Jumlah 1 Lot 36.012.200 35.000.000


dipindahkan ke lembar "Summary"
71.012.200
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.2:


Rate Total
Item Modifikasi Instalasi Qty Unit
No. 9BLV
Fire Fighting Material Upah Material Upah
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang instalasi


Fire Fighting (Riser Hydrant dan Riser Sprinkler)
terpasang sesuai gambar terlampir, lengkap
accessories dan/atau piping devices termasuk
piping circuit yang dibutuhkan agar berfungsi
dengan baik dan benar.

1. Carbon steel pipe Ø 8" 0 mtr - -


ASTM A53, Schedule 40
2 Knee Ø 8" 0 nos - -
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 7 nos 1.750.000 12.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 4 nos 15.000 termasuk 60.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 0 Sets 15.000 termasuk - termasuk
9 UNP 100 for Pipe Bracket 0 mtr - -
10 Strap for Pipe Bracket, (25 x 3)mm 0 mtr - -
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 0 no - -
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 0 Sets - -
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 0 Sets - -
14 Primary Paint 0 Kg - -
15 Top Coat Paint, Red 0 Kg - -

Jumlah 1 Lot 12.410.000 17.500.000,00


dipindahkan ke lembar "Summary"
29.910.000
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.3:


Rate Total
Item Modifikasi Instalasi Qty Unit
No. Hotel
Fire Fighting Material Upah Material Upah
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang instalasi


Fire Fighting (Riser Hydrant dan Riser Sprinkler)
terpasang sesuai gambar terlampir, lengkap
accessories dan/atau piping devices termasuk
piping circuit yang dibutuhkan agar berfungsi
dengan baik dan benar.

1. Carbon steel pipe Ø 8" 9 mtr 645.000 5.805.000


ASTM A53, Schedule 40
2 Knee Ø 8" 4 nos 506.550 termasuk 2.026.200 termasuk
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 7 nos 1.750.000 12.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 4 nos 15.000 termasuk 60.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 32 Sets 15.000 termasuk 480.000 termasuk
9 UNP 100 for Pipe Bracket 6 mtr 120.000 termasuk 720.000 termasuk
10 Strap for Pipe Bracket, (25 x 3)mm 6 mtr 50.000 termasuk 300.000 termasuk
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 1 no 25.000 termasuk 25.000 termasuk
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 25 Sets 4.000 termasuk 100.000 termasuk
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 12 Sets 18.000 termasuk 216.000 termasuk
14 Primary Paint 1 Kg 100.000 100.000
15 Top Coat Paint, Red 1 Kg 250.000 250.000

Jumlah 1 Lot 22.432.200 17.500.000


dipindahkan ke lembar "Summary"