Checklist For Waterproofing - Basement

This document provides a checklist for waterproofing a basement. It outlines parameters to check for the bottom area including cleaning surfaces, installing pressure release pipes and tiles. It also includes checks for the dado area such as cleaning surfaces, treating joints and applying waterproof plaster. Finally, it lists safety checks like obtaining MSDS sheets, proper storage, protective equipment for workers, and ventilation. The goal is to ensure all areas are properly waterproofed according to specifications and that workers follow safety protocols when applying waterproofing materials.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
2K views2 pages

Checklist For Waterproofing - Basement

This document provides a checklist for waterproofing a basement. It outlines parameters to check for the bottom area including cleaning surfaces, installing pressure release pipes and tiles. It also includes checks for the dado area such as cleaning surfaces, treating joints and applying waterproof plaster. Finally, it lists safety checks like obtaining MSDS sheets, proper storage, protective equipment for workers, and ventilation. The goal is to ensure all areas are properly waterproofed according to specifications and that workers follow safety protocols when applying waterproofing materials.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INTEGRATED MANAGEMENT SYSTEM Doc. No.

:
FORMATS Rev No.:
WATER PROOFING ‐ BASEMENT Rev Date:
Page No. ‐ 1 ‐ of
Name of Project Location  Date

Name of Contractor: ‐
SR.NO PARAMETER OBSERVATIONS
A Bottom Area
1 Check the Cleaning of top Surface of P.C. C.
2 Treatment of Construction Joints.
3 Placing of Pressure release Pipes ‐ "B" class ‐ 25 mm dia, if any
4 Placing of Shahbad Stones :
a Check Mortar Proportion ‐ 1:4
b Check Admixture proportion ‐    / bag of Cement
c Check thickness of Tiles ‐ 15 ‐ 20 mm thk
5 Sealing of Joints between Tiles ‐ CM 1:1
6 Application of Final layer
a Check Mortar Proportion ‐ 1:3
b Check Admixture proportion ‐    / bag of Cement
c Check thickness of Final Layer ‐ 20 ‐ 25 MM
d Curing
B Dado Area 
1 Cleaning the Surface of Raft, Retaining Wall
2 Hacking the R.C. C. Surface
3 Treatment of Construction Joints 
4 Fixing of Shahbad Stones ‐ Max.1.00M ht in single day
5 Grouting of space between Wall & Tiles
a Check proportion of Cement Slurry with admixture ‐    / bag
6 Application of Water proof Plastser
a Check Proportion of Mortar ( 1:3 )
b Check Admixture proportion ‐     / bag of Cement
C SAFETY CHECKS

1 Ensure and check MSDS for the water proofing material is obtained. 
Check the store personnel, employees handling this material are briefed the 
2
safety requirements as per the MSDS. 
Check that the material is stored at a designated place for prevention from 
3
fire hazard etc.
INTEGRATED MANAGEMENT SYSTEM Doc. No.:
FORMATS Rev No.:
WATER PROOFING ‐ BASEMENT Rev Date:
Page No. ‐ 1 ‐ of
Name of Project Location  Date

Name of Contractor: ‐

Check if  the material is a flammable one. So smoking or any other hot work is 
4
prohibited while handling, using or at the proximity of the material.

Check that the Employees using the water proofing material shall wear 
5
rubber hand gloves, goggles/ face shield, Safety helmet and shoes.
Check that the Employees handling the material shall be dressed covering 
6
them fully, to prevent the accident fall of the chemical on them.
Check and ensure Employees are informed the wash places to wash off the 
7
chemical fallen on them.
Check If the water proofing work is done in a confined area the required 
8
ventilation is ensured.
Any Comments

Contractor Engineer  Engineer Beacon Associates
Sign
Name
Date