0% found this document useful (0 votes)
54 views1 page

345SAM Project Development and Control Coursework 1

The document provides instructions for a project planning coursework assignment. Students must submit a 1500-word project plan by February 21st for one of four proposed projects, demonstrating their understanding of key project stages like stakeholder analysis, risk analysis, resources, and milestones. They must include a Gantt chart and use Harvard referencing, and the assignment will be submitted to Turnitin for plagiarism checking. An outline marking scheme is provided on the next page.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

345SAM Project Development and Control Coursework 1

The document provides instructions for a project planning coursework assignment. Students must submit a 1500-word project plan by February 21st for one of four proposed projects, demonstrating their understanding of key project stages like stakeholder analysis, risk analysis, resources, and milestones. They must include a Gantt chart and use Harvard referencing, and the assignment will be submitted to Turnitin for plagiarism checking. An outline marking scheme is provided on the next page.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

345SAM Project Development and Control Coursework 1

PROJECT PLAN

Assignment handout date: w/c 21st January 2013

Assignment hand in date: 4pm on 21st February 2013

A copy of your assignment must also be submitted to Turnitin using the link on the
345sam moodle page.

TASK

You are required to produce a 1500 word project plan for one of the following
projects:

 Developing an advertising campaign for a product of your choice

 Building a conservatory

 Organising a University charity football match or other small event

 A small-scale project of your choice

Your report should demonstrate the various stages of project planning, and
specifically include:

 Your understanding of project stages


 Stakeholder analysis
 Risk analysis
 Resources required
 At least 3 milestones
 Gantt chart or Critical Path Analysis

When you are writing your report, make sure that you explain why you are
proposing particular steps are taken or tools are used. You should use academic
sources to support your work.

Harvard referencing must be used.

Word Count: 1500 + Gantt Chart (included as an appendix)

OUTLINE MARKING SCHEME IS GIVEN OVERLEAF.

You might also like