Generation Detail of Last One Year-19
Generation Detail of Last One Year-19
Generation Detail of Last One Year-19
16.42
15.36
RCC/Shade/Ground Average - Yield Average - CUF
14.66
14.43
13.92
13.55
Ground 3.69 15.36221374046
Raised Structure 3.34 13.91797619048
RCC 3.52 14.65679172057
RCC+Ground 3.46 14.42571428571
Shed 3.25 13.54990679095
Shed + Ground 3.94 16.416
Shed + RCC 3.20 13.31114285714
3.94
3.69
3.52
3.46
3.34
3.25
Shed + RCC + Ground 4.02 16.74
Total Result 3.43 14.30701260193
3.25
13.55
3.94
16.42
3.20
13.31
4.02
16.74
Data
Column C
Average - Yield Plant Type
State Capex Opex Total Result
AP 3.13 3.61 3.32
CG 3.35 3.35
DL 3.08 3.39 3.20
GJ 3.48 3.87 3.72
HP 3.25 3.25
HR 3.41 3.28 3.40
JH 3.16 3.64 3.38
KA 3.90 3.62 3.73
KL 3.02 3.51 3.25
MH 3.29 3.62 3.50
3.90
3.87
3.64
3.65
3.62
3.62
3.61
3.51
3.48
MP 2.48 3.44 3.40
3.44
3.41
3.39
3.35
3.29
3.28
3.25
3.16
3.13
3.08
3.02
OR 2.30 1.22 1.80
2.48
PB 3.65 2.62 2.99
2.30
RJ 3.13 3.72 3.53
TN 2.87 3.49 3.12
1.22
TS 3.44 3.56 3.52
UP 3.49 3.22 3.35
WB 2.59
AP CG DL GJ 2.59 HR
HP JH KA KL MH MP OR PB
Total Result 3.30 3.56 3.43
KL
3.02
3.51
3.29
MH
3.62
2.48
MP
3.44
OR
2.30
1.22
PB
3.65
2.62
RJ
3.13
3.72
TN
2.87
3.49
TS
3.44
3.56
UP
3.49
3.22
WB
2.59
Opex
3.30
Total
Result
3.56
Plant Type Capex
Plant Type RCC/Shade
/Ground State Plant ID Project Code Capacity Generation IR
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 48068 149.9
RCC
Capex RCC MP Viwa Katni Walplast 134.4 9535.0 106.8
Capex RCC UP Integral University 18-011-130-01 600 56112.0 115.1
Capex RCC TN BSAU Chen 15-011-015-01 100 12371 150.2
Capex RCC TS Niehoff Hyd Niehoff 151.2 16128 140.4
Capex Shed MH Westren Taloja 17-011-100-01 500.85 47208.0 121.2
Capex Shed GJ Raymond 18-011-151-01 640 61010.0 101.5
Opex RCC UP TS Mishra 18-012-159-01 500 53532 116.3
Opex Shed RJ D Mart (Bhilwara) D-Mart Bhilwara 112 12096 129.0
Opex RCC PB D-mart Zirakpur D-mart Zirakpur 44.1 4215 108.8
Opex Shed TN Big basket chennai 18-012-098-02 99.1 10874 119.0
Opex RCC DL Mater Die Mater Die 100.1 8912 94.3
Opex Ground TS Ultratech 18-013-041-01 1000 141230 180.7
Opex RCC KA DM_Kanakpura DM_Kanakpura 134.4 19528 170.1
Opex RCC AP DM-Madhurwada DM-Madhurwada 58.28 7618 166.4
Opex RCC AP DM-Tirupati DM-Tirupati 33.08 4226 166.6
Opex Shed MH Emcure 18-012-112-01 306.85 36417 146.6
Opex RCC AP DM-Ongole DMart-Ongole 81.9 9983 153.3
Opex RCC GJ D-Mart Rajkot 19-012-035-15 71.82 8912 160.8
Opex Shed KA DM-Devanhalli DM-Devanhalli 161.92 18757 154.0
Capex Shed RJ Poddar Associates 16-011-054-01 72 5072.0 86.7
Opex RCC AP DM-Nellore D-Mart-Nellore 99.22 12599 137.8
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 61602 173.5
RCC
Capex RCC UP Integral University 18-011-130-01 600 82259.0 175.0
Capex RCC TN BSAU Chen 15-011-015-01 100 15286 185.0
Capex RCC TS Niehoff Hyd Niehoff 151.2 18319 161.26
NARAVA WATER
Capex Shed AP TREATMENT PLANT GVMC 365.92 46484.3 160.9
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 59644 187.1
RCC
Capex RCC UP Integral University 18-011-130-01 600 83809.0 177.4
Capex RCC TN BSAU Chen 15-011-015-01 100 13991 162.0
NARAVA WATER
Capex Shed AP GVMC 365.92 50898.7 167.0
TREATMENT PLANT
Capex Shed AP Madhurawada GVMC 8.96 1204.1 167.0
Capex Shed AP Gnanapuram GVMC 6.4 730.6 167.0
Capex Shed MH SIES Nerul 16-011-066-01 89.7 12870.0 170.3
Capex RCC MH SIES Sion 18-011-066-03 81.25 12290.0 173.6
Capex RCC MH Symphony 18-011-158-01 40.8 6329.0 181.9
Capex RCC HR CDLU 18-011-109-01 300 46520.0 178.0
Raised
Capex Structure TN Airtel Coimbatore 25 3190 170.0
18-011-001-03
Opex Shed TN D Mart (Coimbatore) 19-012-035-20 100 12683 167.4
Raised
Capex Structure MH Ferrero car parking 344.96 40418.0 159.1
18-011-089-01
Capex RCC KA TCS L Center 19-011-020-02 89.4 9648.0 143.4
Capex RCC KA TCS Poineer 19-011-020-01 61.4 7725 144.36
Opex RCC KL P K Das 18-012-149-01 500 64297 154.1
D Mart (Karakambadi-
Opex Shed AP Tirupati) 19-012-035-55 215 38770 275.0
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 64062 222.3
RCC
Opex RCC UP TS Mishra 18-012-159-01 500 78412 192.7
Capex RCC UP Integral University 18-011-130-01 600 94577.0 199.0
Capex RCC TN BSAU Chen 15-011-015-01 100 12995 154.0
Raised
Capex Structure TN Airtel Coimbatore 25 3245 165.0
18-011-001-03
Opex RCC AP 19-012-035-03 50.1 6470 147.6
D Mart (Eluru)
Raised
Capex Structure MH Ferrero car parking 344.96 62884.0 195.5
18-011-089-01
Capex RCC KA TCS L Center 19-011-020-02 89.4 12789.0 172.3
Capex RCC KA TCS Poineer 19-011-020-01 61.4 8671 172
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 102.3
RCC 34118.0
Opex RCC UP TS Mishra 18-012-159-01 500 55979.0 134.9
Capex RCC UP Integral University 18-011-130-01 600 68382.0 139.3
Capex RCC TN BSAU Chen 15-011-015-01 100 11216 133
Capex Shed MH Westren Taloja 17-011-100-01 500.85 27745.0 58.8
Capex Shed GJ Raymond 18-011-151-01 640 56930.0 110.0
Opex Shed RJ D Mart (Bhilwara) D-Mart Bhilwara 112 11998.0 149.0
Opex RCC PB D-mart Zirakpur D-mart Zirakpur 44.1 4794.0 134.0
19-012-052-02
Opex RCC DL JNU 19-012-061-01 500 51031.0 123.0
Shed +
Opex RCC + RJ RSWM-Ground 7863 132.0
Ground 19-012-039-01 864920.0
RCC+Grou
Opex nd RJ DRMR 150 132.0
19-012-055-01 16492.0
Opex RCC RJ GWEC Ajmer 19-012-056-01 246.3 23509.0 130.0
Opex Shed MH Cosmo Films Ltd 19-012-034-01 2041.0 206939.0 129.4
19-012-035-02
Opex RCC AP DM-Kakinada 19-012-035-33 30.5 3049 120.8
Opex RCC KA D Mart (Siddapur) 19-012-035-19 63.6 6840 138.28
Capex RCC TN BSAU Chen Ph2 BSAU Chen Ph2 300 23489 133
15014.2
Opex RCC TS CRIDA 19-012-051-01 200 13554 121.73
Capex RCC KA TCS Bhuwalka 19-011-020-05 117 13809 140.78
District Court
Capex RCC HR District Court Bhiwani 25.3 2704.0 134.4
Bhiwani
Capex RCC HR Mini Sacritariate Jhajjar Mini Sacritariate 100 10408.5 136.0
Jhajjar
Capex RCC HR District Court Jhajjar District Court Jhajjar 100 10376.9 136.0
Capex RCC HR District Court Rohtak District Court Rohtak 100.4 7333.5 128.0
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 38905 110.61
RCC
Opex RCC UP TS Mishra 18-012-159-01 500 66568 160.96
Capex RCC UP Integral University 18-011-130-01 600 68382.0 139.3
Capex RCC TN BSAU Chen 15-011-015-01 100 11216 133
Capex Shed MH Westren Taloja 17-011-100-01 500.85 27745.0 58.8
Capex Shed GJ Raymond 18-011-151-01 640 56930.0 110.0
Opex Shed RJ D Mart (Bhilwara) D-Mart Bhilwara 112 14304 177.09
Opex RCC PB D-mart Zirakpur D-mart Zirakpur 44.1 5837 161.87
Raised
Capex TN Airtel Coimbatore 25 2965 143
Structure 18-011-001-03
Opex RCC AP D Mart (Eluru) 19-012-035-03 50.1 6263 148.6
19-012-052-02
Opex RCC DL JNU 19-012-061-01 500 62439 150.28
Shed +
Opex RCC + RJ RSWM-Ground 7863 854550 132.94
Ground 19-012-039-01
Opex RCC+Grou RJ DRMR 150 19781 159.18
nd 19-012-055-01
19-012-035-02
Opex RCC AP DM-Kakinada 19-012-035-33 30.5 3629 144.25
Opex RCC KA D Mart (Siddapur) 19-012-035-19 63.6 8039 163.18
Opex Shed GJ Asian Granito India Ltd 19-012-031-01 1505.8 199156 165.71
(AGL)
Opex Shed GJ Sintex Phase - II 19-013-040-02 2026.0 247988 146.44
Capex RCC TN BSAU Chen Ph2 BSAU Chen Ph2 300 23489 133
Agricultural University
Opex RCC RJ Nagaour 19-012-047-02 120 18631 183.09
Capex RCC HR Mini Sacritariate Jhajjar Mini Sacritariate 100 10408.5 136.0
Jhajjar
Capex RCC HR District Court Jhajjar District Court Jhajjar 100 10376.9 136.0
Capex RCC HR District Court Rohtak District Court Rohtak 100.4 7333.5 128.0
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 118.4
RCC 34181.0
Opex RCC UP TS Mishra 18-012-159-01 500 56958.3 137.9
Capex RCC UP Integral University 18-011-130-01 600 73093.0 148.5
Capex RCC TN BSAU Chen 15-011-015-01 100 12380.0 148.4
11382.0
Opex RCC TS CRIDA 19-012-051-01 200 20414.0 127.8
Capex RCC KA TCS Bhuwalka 19-011-020-05 117 12159.0 124.6
Opex Shed AP Walmart Vizag 19-012-042-02 500.1 50233.0 129.7
Opex RCC OR IHM BHUBANESWAR 19-012-059-01 100.1 2300.0 100.5
Opex RCC TS CRPF Hakimpet 19-012-052-01 632.45 56944.0 90.9
Agricultural University
Opex RCC RJ Nagaour 19-012-047-02 120 124.7
13583.0
Opex Shed GJ 19-012-098-04 49.4 128.4
Big Basket Ahmedabad 5128.0
Opex RCC TS D Mart (Sanath Nagar) 19-012-035-51 49.4 5738.0 133.0
Capex Shed AP GVMC MAIN OFFICE GVMC MAIN OFFICE 258.2 18407.0 101.0
Shed +
RCC Akzonobel (Banglore) 19-012-030-01
Opex RCC KA D Mart (Sarjapura) D Mart (Sarjapura) 66 7951 140.27
Capex RCC KA IIM Bangalore 18-011-128-01 291.2 32004 127
Capex RCC KA TCS L Center 19-011-020-02 89.4 9853 131.19
Capex RCC KA TCS Poineer 19-011-020-01 61.4 6657 128.25
Capex Shed KA Sansera plant - 11 19-011-016-03 399.16 36305 113.2
Capex Shed KA Sansera plant - 07 19-011-016-01 200.26 22271 130.97
Capex RCC KA TCS Bhuwalka 19-011-020-05 117 12643 131.68
Capex Shed TN Nani Agro Foods Pvt Ltd 491 47734 128
19-011-013-01
Capex RCC HR HPGCL Yamuna Nagar HPGCL Yamuna 12.35 1190.2 124.71
Nagar
Judicial
Judicial Complex/Mini
Capex RCC HR Complex/Mini 200 18609.8 113.34
Sactitariate Palwal
Sactitariate Palwal
District Court
Capex RCC HR District Court Bhiwani 25.3 2344.9 110.54
Bhiwani
Capex RCC HR Mini Sacritariate Jhajjar Mini Sacritariate 100 10404.5 140.38
Jhajjar
Capex RCC HR District Court Jhajjar District Court Jhajjar 100 10955.5 140.38
Capex RCC HR District Court Rohtak District Court Rohtak 100.4 9572.1 126.98
Capex RCC HR Hissar District Court Hissar District Court 25 2433.5 122.68
Opex Ground RJ Good Host Spaces Jaipur 19-013-095-01 805.2 82918 135.0
17-012-070-01
Opex Shed + UP GGSC 250
RCC 17-012-074-01 17673 98.54
Opex RCC UP Invertis 17-012-078-01 800 68427.3 122.3
Opex RCC UP TS Mishra 18-012-159-01 500 41264.8 100.4
BIT Mesra
Opex RCC UP MJP Rohilkhand 19-012-065-01 1000.15
University 83159 108
Opex Shed + UP North Eastern Railway 18-013-137-01 500
RCC Gorakhpur 37016 93.54
Opex Shed + UP North Eastern Railway 18-013-136-01 500
RCC Varanasi 41808 106.15
Opex Shed + MP WCR-Jabalpur 18-013-135-01 1101
RCC 89237 98.2
Opex Shed + MH Mit alandi ph1/2 MIT alandi ph1 434.6 14292 97.1
RCC
Capex Raised MH Ferrero car parking 344.96 25620 125.5
Structure 18-011-089-01
Opex Ground MH Mubea Automotive Pvt 249.6 14446 97.3
Ltd 19-013-078-01
Opex RCC MH BSNL Baramati 19-012-050-01 50.7 5491 115.7
Opex RCC MH BSNL Baramati 19-012-050-01 50.7 4229 104
Opex RCC MH NISM (Khalapur) 19-012-070-01 152.1 10390 79.1
16-011-052-01 2299.7
Capex RCC DL NPC ND 14-011-013-01 30 2809.4 119.0
Ajanta Pharma
Opex Shed MH
Chitegaon 191.75 17460 111.10
19-012-029-01
Opex Shed + GJ Sintex Kalol 453
RCC 19-012-040-01 56341 148
Opex RCC MH D-Mart (Nagpur) 19-012-035-29 103.35 12745 149.80
Capex Shed MH
Nilkamal Sinner 19-011-014-04 827.31 27271 88
Capex Shed MH Kunal Houseware 506 58242 120.2
Capex RCC MH TCS Amravati 61.75 6379 136.2
Raised
Capex Structure TN Airtel Coimbatore 25 2356 136
18-011-001-03
Capex Shed TN Nani Agro Foods Pvt Ltd 491 39099 143.8
19-011-013-01
Revathi Equipment
Capex RCC TN 99 0 0
Limited
Opex RCC TN D Mart Podanur D Mart Podanur 37.62 4370 138.4
Capex RCC AP Bharati Polymers 19-011-106-01 1000 126528 146.5
17-012-096-01
Ellenbarrie Industrial
Capex Ground TS 19-011-025-01 123.5 14060 140
Gases
Shed +
RCC Akzonobel (Banglore) 19-012-030-01
Opex RCC KA D Mart (Sarjapura) 66 8127 149.7
Capex RCC KA IIM Bangalore 18-011-128-01 291.2 34464.9 148.6
Capex RCC KA TCS L Center 19-011-020-02 89.4 10051 126.22
Capex RCC KA TCS Poineer 19-011-020-01 61.38 6921 128.61
Capex Shed KA Sansera plant - 11 19-011-016-03 399.16 39868 116.28
Capex Shed KA Sansera plant - 07 19-011-016-01 200.26 22848 139.6
Capex RCC KA TCS Bhuwalka 19-011-020-05 117 12241 132.67
Capex Shed AP BHEEMILI 9.6 161.6 117.4
Capex Shed AP Gnanapuram 6.4 158.7 117.4
Capex RCC HR CDLU 18-011-109-01 300 33720 128.51
Capex RCC HR HPGCL Yamuna Nagar 12.35 1138.2 121
Judicial Complex/Mini
Capex RCC HR 200 14803.2 113.33
Sactitariate Palwal
Opex Ground RJ Good Host Spaces Jaipur 19-013-095-01 805.2 58388 86.0
MDSU - Ajmer
Opex RCC RJ CURAJ 19-012-053-01 352.95 46967 170.65
16-011-034-01 11624
17-012-070-01
BIT Mesra
Opex RCC UP MJP Rohilkhand 19-012-065-01 1000.15
University 99105 123
Opex Shed + UP North Eastern Railway 18-013-137-01 500
RCC Gorakhpur 45224 104.7
Opex Shed + UP North Eastern Railway 18-013-136-01 500
RCC Varanasi 43118 120.5
Opex Shed + MP WCR-Jabalpur 18-013-135-01 1101
RCC 108214 113.34
Shed +
RCC Nilkamal Barjora 19-011-014-01 1187
Capex RCC UP Clara Swain 300
18-011-106-01
Capex RCC UP TCS Allahabad 19-011-020-04 25.4 2421 122.3
Capex RCC UP TCS Hathipur 19-011-026-18 81.0 2442 110
Opex RCC DL Army Public School 19-012-048-01 350 36211 132.99
Capex RCC DL MMTC 16-011-052-01 50 4696.0 122.0
Capex RCC DL NPC ND 14-011-013-01 30 3156.0 135.0
Kurukshetra
Capex RCC HR Kurukshetra University University 600 53471.2 121.74
Mini Sectt. 80
Capex RCC HR 8285 121.74
Kurukshetra
Capex RCC HR IBKDC Kurukshetra 18-011-126-01 50 3747 100.63
Opex RCC HR Bestech 16-012-036-01 268 25926 121
Opex RCC DL jaipuria 18-012-131-01 170.88 16263.0 123.0
Opex RCC MP CHRI 422.5 47418 141.5
MANIT 250
Opex RCC UP Shakuntala Misra 0.0
18-011-168-01 546.6 0
Opex RCC MH D-Mart Badlapur 17-012-035-03 100 10700 131
Opex RCC UP MJP Rohilkhand 1000.15
University 19-012-065-01 83159 108
Opex RCC UP MJP Rohilkhand 1000.15
University 19-012-065-01 99105 123
Opex RCC MH D Mart (miraj) Sangli 103.35 12677.0 150.0
Mini secretariat Mini secretariat
Capex RCC HR Jhajjar( A block) Jhajjar( A block) 75 6721.6 119
Mini Sacritariate
Capex RCC HR Mini Sacritariate Jhajjar Jhajjar 100 9276.7 121.65
Capex RCC HR Sainik School Karnal Sainik School Karnal 50 2011.0 62.6
PR Working Yield CUF Online Installation Month Issues if any
Days Status date
76.7 31 2.71 11.29 Yes 27/Apr/15 Jan-19
78.9 31 2.68 11.17 Yes 5/Jan/15 Jan-19
76.3 31 2.24 9.33 Yes 1/Apr/16 Jan-19
79.1 31 4.18 17.43 Yes 30/Mar/16 Jan-19
79.2 31 2.22 9.26 Yes 15/Oct/17 Jan-19
86.2 31 2.44 10.19 Yes 6/Oct/17 Jan-19
86.0 29 2.73 11.39 Yes 1/Oct/17 Jan-19
0.0 0 0 0 Yes 21/Jun/15 Jan-19 Off line due to net work issue
79.4 31 4.61 19.2 Yes 3/Aug/15 Jan-19
77.7 31 2.61 10.86 Yes 27/Aug/14 Jan-19
76.7 31 2.42 10.1 Yes 1/Jan/17 Jan-19
70.0 31 3.22 13.42 Yes 21/Mar/17 Jan-19 Inv-18 low generation. High TL issue
82.3 31 3.84 15.99 Yes 1/Feb/16 Jan-19 IR Value taken from Schnieder MVI
Plant
87.7 31 3.45 14.38 Yes 8/Jun/17 Jan-19
91.9 31 3.86 16.06 Yes 18/Jul/17 Jan-19
77.0 18 2.91 12.13 Yes 26/Jun/17 Jan-19
85.1 31 2.85 11.89 Yes 6/Jan/16 Jan-19
81.1 31 3.48 14.5 Yes 1/Apr/17 Jan-19 low cuf due to power outage was
more in this month
one block not showing data due to
82.3 31 3.95 16.48 Yes 1/Apr/14 Jan-19 lan proble at customer side.
low generation due to low weather
75.7 31 3.05 12.73 Yes 25/Sep/16 Jan-19 in this month
88.4 31 2.52 10.51 Yes 2/Sep/17 Jan-19
77.5 31 3.73 15.53 Yes 2/Sep/17 Jan-19 Low weather
79.4 31 4.72 19.68 Yes 14/Nov/17 Jan-19
0.0 31 0 0 Yes 17/Oct/16 Jan-19
90.6 31 4.22 17.59 Yes 1/Apr/17 Jan-19 IR Value taken from Schnieder MVI
Plant
94.5 31 3.81 15.88 Yes 28/Mar/17 Jan-19 0
76.4 31 3.53 14.7 Yes 7/Jun/17 Jan-19 0
81.8 13 3.43 14.28 Yes 1/Nov/17 Jan-19 R&D Project for client
77.9 31 3.67 15.28 Yes 15/Oct/16 Jan-19 DG Was on for some day.
90.9 31 2.99 12.46 Yes 11-Jan-17 Jan-19
78.5 30 3.2 13.31 Yes 11/Nov/16 Jan-19 One cleaning cycle miss
79.5 31 3.75 15.61 Yes 27/Sep/16 Jan-19 -
83.3 28 2.41 10.03 Yes 30/Sep/16 Jan-19 Due to low irradiation (less by 12%)
generation is affected
8 days IR data issue so adjusted the
88.1 31 4.34 18.1 Yes Jan-19 same
86.4 31 4.23 17.62 Yes 31/Mar/17 Jan-19 -
Module shadow observed in morning
80.0 31 3.92 16.34 Yes 31/Mar/17 Jan-19
time
Due to insulation error generation is
87.3 31 3.47 14.45 Yes 9/Jan/17 Jan-19 affected
75.6 31 3.05 12.71 Yes 5/Jan/17 Jan-19 Designe Shadow Effect in till morning
11.00am
Power outage and Inv-3 tripping
72.1 31 3.68 15.33 Yes 23/Sep/16 Jan-19 issue
79.8 31 3.72 15.51 Yes Jan-19 -
81.7 29 4.26 17.77 Yes Jan-19 -
76.8 31 2.49 10.36 Yes 1/Apr/16 Jan-19 Due to low irradiation and Inv-1
tripping issue generation is affected
68.7 31 3.31 13.78 Yes 13/Jan/16 Jan-19 Due to temp. issue PR is Low.
84.4 31 2.6 10.85 Yes Jan-19 Due to low irradiation (less by 26%)
generation is affected
78.7 31 3.74 15.6 Yes Jan-19 -
77.0 31 3.88 16.16 Yes 5-Oct-17 Jan-19 Generation is more than estimated
79.0 31 4.02 16.74 Yes Jan-19 Insulation Error and MCB tripping
issue generation affected.
79.1 31 3.99 16.63 Yes 20/Aug/17 Jan-19 -
79.9 31 4.05 16.88 Yes 26/Aug/17 Jan-19 Generation is near estimated
70.5 31 3.69 15.37 Yes 1/Dec/15 Jan-19 Generation is affected due to
shadow.
68.3 31 3 12.5 Yes 11/Apr/16 Jan-19 Inverter tripping issue almost 10 days
84.5 31 4.12 17.19 Yes Jan-19 MCCB issue of LT-A for 3 days so
generation is affected
79.3 31 3.52 14.66 Yes 1/May/17 Jan-19 3 days Inverters in Throttled mode
81.6 31 3.17 13.21 Yes Sep-17 Jan-19 Generation is more than estimated
90.0 31 3.23 13.45 Yes Sep-17 Jan-19 Due to inverter tripping issue and
shadow generation is affected
Due to low irradiation (less by 19%)
86.3 31 3.06 12.74 Yes Jan-19 generation is affected
Inv-2 derating issue for 15 days so
89.2 31 2.76 11.5 Yes Jan-19 generation is affected
87.0 30 3.01 12.53 Yes Dec-17 Jan-19 Due to low irradiation (less by 21%)
generation is affected
80 31 4.47 18.63 Yes Jan-19 -
77.4 31 4.52 18.84 Yes Jan-19 Generation is near estimated
82.2 31 4.04 16.84 Yes 21-Nov-17 Jan-19 Due to low irradiation (less by 19%)
generation is affected
Inverter issue for 2 days and only 1
75.4 28 3.91 16.27 Yes Jan-19 cleaning cycle done
88.4 31 3.78 15.75 Yes Jan-19 -
Shadow observed in morning and
80.6 31 3.6 15.01 Yes 16/Oct/18 Jan-19 evening time
76.2 31 3.99 16.62 Yes Jan-19 AC side Cable burning issue for few
days so generation is affected
76.2 31 2.33 9.73 Yes Jan-19
86.0 31 3.63 15.12 Yes Jan-19 One Cleaning cycle done
100.2 31 3.29 13.69 Yes 11/Dec/17 Jan-19 IR taken from Walmart Vizag
94.8 31 3.11 12.96 Yes Jan-19 IR taken from Walmart Vizag
81.0 31 2.81 11.69 Yes 19-Mar-18 Jan-19 0
2 invetres are off due to net metering
40.4 31 1.4 5.83 Yes Jan-19 not done
82.4 31 4.22 17.58 Yes Jan-19 0
92.6 31 2.69 11.2 Yes Jan-19
85.9 31 3.06 12.74 Yes B1Apr/18 Jan-19 15 days IR data issue so adjusted the
same
81.0 31 3.94 16.42 Yes B1Apr/18 Jan-19 Inverters -1 & 2 Were off & Load
shedding during diwali
82.0 31 3.55 14.8 Yes B1Apr/18 Jan-19 -
82.7 31 4.2 17.52 Yes B1Apr/18 Jan-19 -
4 Inverters kept off due to net
63.7 31 2.99 12.45 Yes Jan-19 metering. Also cleaning issue.
83.4 31 4.49 18.72 Yes Aug-18 Jan-19 0
Shadow observed and inverters
69.9 31 2.43 10.11 Yes Aug-18 Jan-19
derating
80.1 31 3.15 13.13 Yes Aug-18 Jan-19 Generation is more than estimated
30
71.7 2.36 9.82 Yes 1/Jun/17 Sep-19
30
69.9 30 2.85 11.88 Yes 3/30/2017 Sep-19
82.2 30 2.75 11.46 Yes 12/18/2017 Sep-19
30 9/24/2018
77.0 2.77 11.55 Yes Sep-19
30 11/5/2018
79.1 2.47 10.28 Yes Sep-19
30 4/6/2018
78.8 2.79 11.61 Yes Sep-19
30 3/28/2018
82.5 2.70 11.26 Yes Sep-19
30 4/6/2018
27
96.3 3.52 14.66 Yes 18/Jul/17 Sep-19
26
14
64.3 2.38 9.92 Yes 2/Sep/17 Sep-19
30
82.7 30 2.88 12.02 Yes Sep-19
76.1 2.43 10.11 Yes Sep-19
30 Jun-16
79.7 25 2.31 9.63 Yes 4/Oct/16 Sep-19
30
75.7 30 3.08 12.83 Yes 20/Aug/18 Sep-19
75.1 30 2.60 10.84 Yes 5-Jan-19 Sep-19
36.5 30 1.21 5.04 Yes 22-Apr-19 Sep-19
29
84.0 4.01 16.72 Yes 29-Jan-19 Oct-19
31
82.3 31 3.98 16.58 Yes 20-Feb-19 Oct-19
31 8/11/2017
31 12/31/2018
78.0 31 4.29 17.89 Yes 9/11/2018 Oct-19
30
31
31 9/24/2018
80.6 3.20 13.32 Yes Oct-19
31 11/5/2018
86.4 2.92 12.16 Yes Oct-19
31 4/6/2018
71.6 2.78 11.59 Yes Oct-19
31 3/28/2018
86.7 3.17 13.21 Yes Oct-19
31 4/6/2018
31
84.3 3.87 16.13 Yes 18/Jul/17 Oct-19
31
75.2 2.81 11.73 Yes 26/Jun/17 Oct-19
31
76.1 2.63 10.95 Yes 2/Sep/17 Oct-19
31
82.6 31 3.50 14.57 Yes Oct-19
31 Jun-16
76.4 21 3.46 14.43 Yes 4/Oct/16 Oct-19
31
78.2 31 3.57 14.86 Yes 18-Dec-17 Oct-19
31
#DIV/0! 0.00 0 Yes 20/Aug/18 Oct-19
-
Generation is affected due to shadow
Biomedical inverters were off due to issue with DG
synchronization. Also inverters derating due to
high Grid voltage
MCCB tripping issue so generation is affected
-
Inv-1,2,3 was off for 2 days so generation was
affected. Also Inverter fluctuation observed.
0
ZFI Is installed
0
Cleaning Issue
Generation is low due to shadow & non-cleaning
of modules.
0
Cleaning Issue
0
0
One Inverter not working
0
0
Estimation value is higher side.
Cleaning pending from client side
-
-
-
0
ZFI is installed
Cleaning pending .
-
ZFI Installed, Inverters are in off condition
-
ZFI Installed
-
-
0
Inverter replacement done.
Cleaning Issue
0
0
0
0
0
ZFI Installed
Cleaning not done. Plant is in starting phase
Cleaning not done. Plant is in starting phase
-
Plant is in starting phase
Plant started on 18th March 2019
0
0
0
Cleaning Issue
Generation is low due to shadow & non-cleaning
of modules.
Girls hostel inverter connector was burnedand
power outage also.
Power outage
0
0
IR SENSEOR NOT AVAILABLE
IR SENSEOR NOT AVAILABLE
ZFI is installed
Cleaning pending .
-
-
Inverters are derating so generation is affected
-
-
Due to low IR generation is low
-
-
Due to power outage generation is affected
-
-
ZFI Installed
-
ZFI Installed
Cleaning Issue
0
0
0
0
0
0
0
ZFI installed
-
Due to power outage generation affected.
-
-
-
We stared cleaning in last week of april
-
Plant is in starting phase
-
0
0
New car shed block offline due lan issue at
customer side
-
-
Inverters fluctuation observed in both the plants.
0
Power outage was more in this month and DG was
run is more in this month.
0
0
Generation is near than estimated
Generation is more than estimated
Generation is more than estimated
-
Generation is more than estimated
Actual Irradiation is less that Excepted Irradiation.
-
-
0
0
0
-
0
Generation is near than estimated
0
Actual Irradiation is less that Excepted Irradiation.
-
-
Actual Irradiation is less that Excepted Irradiation.
-
Inverters are derating due to high grid voltage.
Shadow on modules
Inverters continous on/off due to grid voltage
issue
-
-
-
-
-
0
0
due to this Month DG run more .
-
Module not Cleaned
Module not Cleaned
Module not Cleaned
-
-
0
0
power outage was more in this month…
-
-
Inverter-1 late start due to Isolation error. One
string of Inv-2 down due to Inverter MC4
connector was damage.
ZFI installed
Inverter late start and derating issue.
Plant was off till 12th due to Energy meter
repalcement. Plant was fully on after 18th.
Actual Irradiation is less that Excepted Irradiation.
Plant is off
0
Cable undersize, communicated with Client. Max.
time inverters off, Inv-3 derating issue.
ZFI Installed
0
Plant is off
Due to thunderstorm plant was off. ZFI also
installed
Due to grid voltage issue inverters are off.
Communicated with Client. Client cable side issue
3 inverters off.
0
0
Modules dammaged.
0
0
0
0
0
Here only 3 inverter Working ..Remaing 2 inverter
Swith OFF Condition
0
0
1 inverter is off.
Shadow of building on lower mount structure and
IR sensor not work properly
0
Inverter 2 & 3 was off for 15 days due to nano
coating.
Dg running was running more time
0
0
0
0
Due to construction work at poddar cleaning is not
done at module and plant is not online
0
Grid Transformer fail / Apepdcl replacement of
transformer in process/ 2 inv fail due to high
voltage
power outages
power outage
0
0
0
0
Huge Shadow
0
0
0
0
0
0
Due to communication issu from customer side
Computer Science Building offline last one weak
and inverter no 4 having issue
ZFI Is installed
Power Outages.
Weather Condition Not GOOD.
0
0
ZFI Enabled
ZFI
ZFI
client showdown 10days for maintenance work &
every Sunday client showdown plant because of
CIEG work not completed.
0
0
Modules dammaged.
0
0
0
0
0
0
1 inverter is off.
Shadow of building on lower mount structure and
IR sensor not work properly
-
Inv-3 observed multiple times off. Deemed not
applicable
IR is less than Expected.
0
-
due to cold weather, so CUF Below 15%
IR is less than Expected.
Actual generation is more than estimated
power outages
-
power outage
IR is less than Expected.
-
-
-
Huge Shadow
0
0
0
0
0
-
-
-
-
Due to communication issu from customer side
Computer Science Building offline last one weak
and inverter no 4 having issue
ZFI Is installed
Power Outages.
Weather Condition Not GOOD.
IR is less than Expected.
0
0
May month deemed units adjusted in this
month.inverters was on/off
ZFI Enabled
Voltage unbalance issue at RAF blocks and GC
blocks
ZFI Installed
-
ZFI
ZFI
dg running
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Dg was running more time(2290 minute run)
Plant was off at client side
0
0
0
0
0
CUF low due to wether effect
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
319Min grid outage and cloudly wether . 20days
plant online condition.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
During the power outage one plant made off to
avoid DG tripping issue
0
0
0
0
dg was running, power outage and weather
condition
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1395Min AC outage & Cloudly wether.
0
heavy rain at side and insulation error client
denide to work on shed
0
ZFI Is installed
0
0
0
0
High volatge tripping issue
ZFI
0
0
19 days Plant was Off because of client
maintainence issue
0
0
0
0
0
0
Client side Cable and insulator was damaged, Due
to this Plant was off at Admin block.
0
0
0
0
0
0
0
0
dg running
0
0
ZFI enebled maximum time and dg running
Shadow effect on module due vegetation
40.47 59.53
17.76 82.24
16.87 83.13
0 100
28.25 71.75
50.62 49.38
0 100
16.86 83.14
0 100
power outage was more in
5.01 94.99 this month, & Weather
Conditions Not Good.
1.16 98.84
4.31 95.69
1.81 98.19
2.22 97.78
0 100 0
2 Modules removed from
project team for dmart
srinagar on dt : 19/9/2019
15 85 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
4.44 95.55 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100%
0 100%
0 100%
0 100%
0 100%
Low IR
86.70%
Low IR
86.70%
Low IR
80%
Low IR
Low IR
80%
1030
90 Grid Outage
17.50
0.00
0.00
7.11
0.06
0.0555556
PR is low due to Cleaning
1.0555556 issue.
0.4055556
0.1944444
3.1666667
1.6666667
2.6055556
0
3.28
1.1111111
60 Client side Maintenance
0
0 100 0
0 100 0
Low generation due to ,AE
0 100 Inverter 1 is faulty .
445 97.939815 Grid Failure
565 97.384259 Grid Failure
230 98.935185 Grid Failure
0 100 0
0 100 0
0 100 0
0 100 0
0 100
0.83 99.17
2.15 97.85
3.52 96.48
0.30 99.70
0.05 99.95
0.24 99.76
0 100
0.97 99.03
PR is low due to modules
2.78 97.22 dusty and edges of solar
cell.& DG running.
0 100
0 100
ZFI Is installed and 4th day
5.3 94.7 powe outage 16th plant off
due to lug burn issue
0 100 ZFI Is installed
0 100 ZFI Is installed
0 100
0 100
0 100
1.77 98.23
0.58 99.42
0 100
3 97
power outages was more in
2.53 97.47 this month
0 100
0.83 99.17
0 100
0 100
0 100
0 100
0 100
0 100
0 100
0 100
0 100
Trip realy available on Mains
0 100 MCCB /MCCB tripping while
power cut
0 100
2 Strings isolation error / 2
strings disconnected from
0 100 inv 2/Grid side high volatge
issue
0 100 No Isuues
12.9 87.09 wattmon OS issues, so data
is not available
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
3.4 96.6 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
0 100 No Isuues
Low IR
86.70%
Low IR
1 inve
ZFI Is installed
80%
Low IR
Low IR
80%
MCCB TRIP DUE TO LUG
406 98% HEATING
Plant is shut down due to
payment issue
300
High volatge tripping issue so
one inverter in power
106 99.5 reduction mode
client side one phase cable
puncture at charak bhavan
block so 68 Kw plant is off
90 99.5
690
IR sensor Issue and Shadow
of building on lower side
mounted modules, and
shadow of railings on roof
top
600
power outage more and dg
430 97.611111 run
535
0
0 100 0
100 99.537037 Grid Failure
260 98.796296 Grid Failure
0 ZFI Installation
97.523148
99.490741
0 100 ZFI Installation
0 100 0
98.449074 DG Running
98.958333
0 0
0 100 0
0 100 0
100 0
73.333333 Inverter Faulty 12 days
97.083333 Grid Failure
Data of one inverter is not
0 100 available
65
Plant kept off due to
payment issue.
Grid Outage
power outage more and dg
power outage more and dg run 430 97.611111 run