Data Data: Peta Proses Operasi (Opc) Power Bank Multi Fungsi

This document summarizes the production process of a multi-function power bank over 20 steps taking a total of 9,000 seconds or 2.5 hours. It lists each production step, the operation performed, total time, and includes visual inspections, testing of components like batteries and LED lights, assembly using soldering and glue, and a final test and storage step.

Uploaded by

irwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
670 views1 page

Data Data: Peta Proses Operasi (Opc) Power Bank Multi Fungsi

This document summarizes the production process of a multi-function power bank over 20 steps taking a total of 9,000 seconds or 2.5 hours. It lists each production step, the operation performed, total time, and includes visual inspections, testing of components like batteries and LED lights, assembly using soldering and glue, and a final test and storage step.

Uploaded by

irwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PETA PROSES OPERASI (OPC) POWER BANK MULTI FUNGSI

Objek : Power Bank


Tanggal : 30 April 2018 Ukuran : 17cm*8cm*2,2cm

Batre Solar Cell Lampu Led Kipas P. Rangkaian

Pemeriksaan Visual Tes Pemeriksaan Visual Tes & Tester Pemeriksaan Visual Tes & Tester Pemeriksaan Visual Tes Pemeriksaan Visual Tes
I-1 I-2 I-3 I-5
180'' 240'' 300'' 120'' 120'' I - 6

Pengetesan Batre Pengetesan Batre Pengeboran Bor


O-1 O-4 O-5
120'' 180'' 300''

Pengukuran Aktual Perakitan Solder


O-2 A-1
120'' 1200''

Pemotongan Pisau/Cutter Pengeleman Glue Gan


O-3 O-6
600'' 600''

Pemeriksaan Visual Tes Pengeboran Bor


I-4 O-7
120'' 300''

Perakitan Solder
A-2
600''

Pengeleman Glue Gun


O-8
600''

Pengeboran Bor
O-9
300''

Perakitan Marker,Solder

Data Data 1200''


A-3

No Simbol Kegiatan Jumlah Waktu Pengeleman Glue Gun


O-10

1 Operasi 10 3720'' 600''

2 Inspeksi 07 2280'' Pengujian


I-7
Visual Tes & Tester
1200''

3 Assembly 03 3000''
4 Store Penyimpanan

Total 20 9000''