TQM - Project Proposal

The document proposes repairing leaking air conditioning units in classrooms under the Accountancy Department at Rizal Technological University. The objectives are to maintain cleanliness and safety for students passing through the area and to fix water leakages from air conditioners. Currently, air conditioners are leaking and creating slippery surfaces. The proposed solution is to install exhaust hoses on each unit at a cost of 650 pesos. The timeline expects successful implementation at the start of the next semester and maintenance checks twice yearly thereafter. The expected outcomes are no leaks for students and a clean pathway.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
366 views3 pages

TQM - Project Proposal

The document proposes repairing leaking air conditioning units in classrooms under the Accountancy Department at Rizal Technological University. The objectives are to maintain cleanliness and safety for students passing through the area and to fix water leakages from air conditioners. Currently, air conditioners are leaking and creating slippery surfaces. The proposed solution is to install exhaust hoses on each unit at a cost of 650 pesos. The timeline expects successful implementation at the start of the next semester and maintenance checks twice yearly thereafter. The expected outcomes are no leaks for students and a clean pathway.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

RIZAL TECHNOLOGICAL UNIVERSITY

College of Business and Entrepreneurial Technology

Repair of Leaking Air


Conditioning Units Installed in
Classrooms under Accountancy
Department in OB Building.
A PROJECT PROPOSAL FOR TOTAL QUALITY MANAGEMENT

MEMBERS: ANGELICA G. BUSANO


DON JASSER R. GALINGAN
KIMBERLY RIGOR
LEONELL D.L BELIGOLO
MARLYN GOMEZ
MAYBELLE GAROBILLO
RUZZEL A. DIMALALUAN
OBJECTIVES/GOALS:

• To help and maintain the cleanliness and orderliness the area near at COOP and at the back of
the Gymnasium
• To ensure the safeness of all Rizal Technological University students and staffs that passing
through on that way.
• To fix all the water leakage cause of air conditioner by putting hose on it.
• To help the officers of JOMA to come up with a project that can help not just the OPM students
but every students and staffs of RTU that are passing through on that way.

CURRENT PHASE:

Leakage from air conditioning units installed in classrooms under accountancy department
causes inconvenience to those students who pass the hallways near coop and later on creates a slippery
surface which may cause accident (tripping).

*insert picture*

PROPOSED SOLUTIONS:

There are ( dami nung aircon) that are currently leaking in the old building on the area of the
accountancy department and as we can see this problem was not giving an action. So we as the students
of RTU with the help of Junior Operations Management Association will conduct a project to fix and
maintain the air conditioning units of accountancy department by providing hose on ever Air
conditioning units
1. Raise the problem to the JOMA, Maintenance Department and to the school administration
regarding the maintenance of the air conditioning units.
2. Put hose on every air conditioning units of Accountancy department.
3. Set a Maintenance schedule of cleaning air conditioning units.

Materials needed Cost of Materials


Air conditioning Exhaust hose tube P650.00
Total Cost P650.00

TIMELINE
EXPECTED OUTCOME

• We expect that on the following days after the implementation, the students will not experience
any leak when they pass through on that way and the moss way will also clean up.

• We expect that the maintenance will check the Air Conditioner at least twice a year

• We also expect that in the start of second semester this project will be implemented
successfully.

MONITORING AND CONTROLLING

After the implementation of repairing the leakage of Air Conditioning Units installed in
classrooms under the Accountancy Department in OB Building should have a twice a year maintenance
schedule to check and clean the air conditioning units to maintain the pristine condition of it.

Sign of the SSG