Distribution Board Schedule Report 1

Uploaded by

waseem kausar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views15 pages

Distribution Board Schedule Report 1

Uploaded by

waseem kausar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: BTS-06A ( TAP OFF ) Model No: L1 L2 L3

Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 171.00 171.00 171.00

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.04504 Total Diversified Load (A): 153.90 153.90 153.90

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 250 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 2ND FLOOR AHU-2E 23.4 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
26.0
Table 4E4

2 L1,L2,L3 2ND FLOOR EF-2E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4

3 L1,L2,L3 3RD FLOOR_AHU-3E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4

4 L1,L2,L3 3RD FLOOR _EF-3E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4

5 L1,L2,L3 4TH FLOOR _AHU-4E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4

6 L1,L2,L3 4TH FLOOR EF-4E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 1 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: BTS-06A ( TAP OFF ) Model No: L1 L2 L3

Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 171.00 171.00 171.00

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.04504 Total Diversified Load (A): 153.90 153.90 153.90

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 250 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

7 L1,L2,L3 5TH FLOOR AHU-5E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4

8 L1,L2,L3 5TH FLOOR EF-5E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4

9 L1,L2,L3 6TH FLOOR AHU-6E 28.8 0.80 0.00 40 40 MCCB N/A N/A 10 1 x 1 x 4c Multicore, 90°C thermosetting 10 10
insulated, armoured LSF Cu
32.0
Table 4E4

10 L1,L2,L3 6TH FLOOR EF-6E 18.0 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
20.0
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 2 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: BTS-06B ( TAP OFF ) Model No: L1 L2 L3

Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 0.00 0.00 0.00

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.02152 Total Diversified Load (A): 0.00 0.00 0.00

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 250 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 2ND FLOOR AHU-2W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

2 L1,L2,L3 2ND FLOOR EF-2WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

3 L1,L2,L3 3RD FLOOR_AHU-3W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

4 L1,L2,L3 3RD FLOOR _EF-3WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

5 L1,L2,L3 4TH FLOOR _AHU-4W 29.0 0.80 0.00 40 40 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
32.2
Table 4E4

6 L1,L2,L3 4TH FLOOR EF-4WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 3 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: BTS-06B ( TAP OFF ) Model No: L1 L2 L3

Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 0.00 0.00 0.00

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.02152 Total Diversified Load (A): 0.00 0.00 0.00

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 250 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

7 L1,L2,L3 5TH FLOOR AHU-5W 16.2 0.80 0.00 40 40 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

8 L1,L2,L3 5TH FLOOR EF-5WA 10.8 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
12.0
Table 4E4

9 L1,L2,L3 6TH FLOOR AHU-6W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

10 L1,L2,L3 6TH FLOOR EF-6WA 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 4 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: Emergency and IVF Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 30.53 30.53 30.53

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.20936 Total Diversified Load (A): 24.42 24.42 24.42

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 32 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 Emergency and IVF 24.4 0.80 0.00 32 32 MCCB N/A N/A 16 1 x 1 x 4c Multicore, 90°C thermosetting 16 5
insulated, armoured Cu Table
30.5
4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 5 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: LMSB-2 Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 386.00 386.00 386.00

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.06374 Total Diversified Load (A): 308.80 308.80 308.80

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 800 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 LMSB-2 386.0 0.80 0.00 800 392 MCCB N/A N/A 240 1 x 1 x 4c Multicore, 90°C thermosetting 95 15
insulated, armoured Cu Table
386.0
4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 6 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: Operation theatres Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 58.90 58.90 58.90

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.14807 Total Diversified Load (A): 47.12 47.12 47.12

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 125 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 Operation theatres 47.1 0.80 0.00 63 N/A Fuse N/A N/A 16 1 x 1 x 4c Multicore, 90°C thermosetting 16 5
insulated, armoured Cu Table
58.9
4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 7 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-01-4F Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.28922 Total Diversified Load (A): 16.69 16.69 16.69

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-01-4F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 8 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-01-5F Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.2916 Total Diversified Load (A): 16.69 16.69 16.69

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-01-5F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 9 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-01-6F Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.29398 Total Diversified Load (A): 16.69 16.69 16.69

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-01-6F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 10 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-02-5F-C Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 12.78 12.78 12.78

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.16473 Total Diversified Load (A): 12.78 12.78 12.78

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-02-5F-C 12.8 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
12.8
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 11 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-02-6F-C Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 12.78 12.78 12.78

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.16721 Total Diversified Load (A): 12.78 12.78 12.78

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-02-6F-C 12.8 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
12.8
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 12 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-03-4F-E Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.83 15.83 15.83

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.28922 Total Diversified Load (A): 15.83 15.83 15.83

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-03-4F-E 15.8 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.8
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 13 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-03-5F-E Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.13 15.13 15.13

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.2916 Total Diversified Load (A): 15.13 15.13 15.13

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-03-5F-E 15.1 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.1
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 14 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule

Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020

Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A

Board Data

Id No: UDB-03-6F-E Model No: L1 L2 L3

Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.83 15.83 15.83

Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.26397 Total Diversified Load (A): 15.83 15.83 15.83

Incomer Details

Device Manufacturer: N/A Device Type: Device Rating (A): 63 A

Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected

1 L1,L2,L3 UDB-03-6F-E 15.8 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.8
Table 4E4

Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 15 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.