Distribution Board Schedule Report 1
Distribution Board Schedule Report 1
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 171.00 171.00 171.00
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.04504 Total Diversified Load (A): 153.90 153.90 153.90
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 2ND FLOOR AHU-2E 23.4 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
26.0
Table 4E4
2 L1,L2,L3 2ND FLOOR EF-2E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4
3 L1,L2,L3 3RD FLOOR_AHU-3E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4
4 L1,L2,L3 3RD FLOOR _EF-3E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4
5 L1,L2,L3 4TH FLOOR _AHU-4E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4
6 L1,L2,L3 4TH FLOOR EF-4E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 1 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 171.00 171.00 171.00
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.04504 Total Diversified Load (A): 153.90 153.90 153.90
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
7 L1,L2,L3 5TH FLOOR AHU-5E 13.5 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
15.0
Table 4E4
8 L1,L2,L3 5TH FLOOR EF-5E 10.8 0.80 0.00 25 20 MCCB N/A N/A 4 1 x 1 x 4c Multicore, 90°C thermosetting 4 10
insulated, armoured LSF Cu
12.0
Table 4E4
9 L1,L2,L3 6TH FLOOR AHU-6E 28.8 0.80 0.00 40 40 MCCB N/A N/A 10 1 x 1 x 4c Multicore, 90°C thermosetting 10 10
insulated, armoured LSF Cu
32.0
Table 4E4
10 L1,L2,L3 6TH FLOOR EF-6E 18.0 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
20.0
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 2 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 0.00 0.00 0.00
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.02152 Total Diversified Load (A): 0.00 0.00 0.00
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 2ND FLOOR AHU-2W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
2 L1,L2,L3 2ND FLOOR EF-2WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
3 L1,L2,L3 3RD FLOOR_AHU-3W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
4 L1,L2,L3 3RD FLOOR _EF-3WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
5 L1,L2,L3 4TH FLOOR _AHU-4W 29.0 0.80 0.00 40 40 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
32.2
Table 4E4
6 L1,L2,L3 4TH FLOOR EF-4WA 16.2 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 3 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 12 Spare: 16.7 % Total Connected Load (A): 0.00 0.00 0.00
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.02152 Total Diversified Load (A): 0.00 0.00 0.00
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
7 L1,L2,L3 5TH FLOOR AHU-5W 16.2 0.80 0.00 40 40 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
8 L1,L2,L3 5TH FLOOR EF-5WA 10.8 0.80 0.00 32 32 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
12.0
Table 4E4
9 L1,L2,L3 6TH FLOOR AHU-6W 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
10 L1,L2,L3 6TH FLOOR EF-6WA 16.2 0.80 0.00 50 20 MCCB N/A N/A 6 1 x 1 x 4c Multicore, 90°C thermosetting 6 10
insulated, armoured LSF Cu
18.0
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 4 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 30.53 30.53 30.53
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.20936 Total Diversified Load (A): 24.42 24.42 24.42
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 Emergency and IVF 24.4 0.80 0.00 32 32 MCCB N/A N/A 16 1 x 1 x 4c Multicore, 90°C thermosetting 16 5
insulated, armoured Cu Table
30.5
4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 5 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 386.00 386.00 386.00
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.06374 Total Diversified Load (A): 308.80 308.80 308.80
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 LMSB-2 386.0 0.80 0.00 800 392 MCCB N/A N/A 240 1 x 1 x 4c Multicore, 90°C thermosetting 95 15
insulated, armoured Cu Table
386.0
4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 6 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 58.90 58.90 58.90
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.14807 Total Diversified Load (A): 47.12 47.12 47.12
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 Operation theatres 47.1 0.80 0.00 63 N/A Fuse N/A N/A 16 1 x 1 x 4c Multicore, 90°C thermosetting 16 5
insulated, armoured Cu Table
58.9
4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 7 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.28922 Total Diversified Load (A): 16.69 16.69 16.69
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-01-4F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 8 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.2916 Total Diversified Load (A): 16.69 16.69 16.69
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-01-5F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 9 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 16.69 16.69 16.69
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.29398 Total Diversified Load (A): 16.69 16.69 16.69
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-01-6F-W 16.7 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
16.7
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 10 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 12.78 12.78 12.78
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.16473 Total Diversified Load (A): 12.78 12.78 12.78
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-02-5F-C 12.8 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
12.8
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 11 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 12.78 12.78 12.78
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.16721 Total Diversified Load (A): 12.78 12.78 12.78
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-02-6F-C 12.8 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
12.8
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 12 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.83 15.83 15.83
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.28922 Total Diversified Load (A): 15.83 15.83 15.83
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-03-4F-E 15.8 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.8
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 13 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.13 15.13 15.13
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.2916 Total Diversified Load (A): 15.13 15.13 15.13
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-03-5F-E 15.1 0.80 0.00 16 N/A Fuse N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.1
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 14 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Distribution Board Schedule
Project Reference: Hamad Women's Hospital Job Number: Created By: SWAMINATHAN GNANESWARAN Rev Date: 4/8/2020
Document No: Created On: 11/26/2018 Revised By: VAIBHAV KANTHE Revision: REV-A
Board Data
Name: No. of Ways: 10 Spare: 90 % Total Connected Load (A): 15.83 15.83 15.83
Board Rating (A): 0 Fault Rating (kA): 0 Ze (Ω): 0.26397 Total Diversified Load (A): 15.83 15.83 15.83
Incomer Details
Way Phase Id No: Load (A) 3rd Harmonic Protective Device (A) RCD AFDD Cable Cable Type Sep. CPC Length
Name Diversified Pf % In Ir Type mA mm² Cores mm 2 m
Connected
1 L1,L2,L3 UDB-03-6F-E 15.8 0.80 0.00 63 39.7 MCCB N/A N/A 25 1 x 1 x 4c Multicore, 90°C thermosetting 16 50
insulated, armoured LSF Cu
15.8
Table 4E4
Project: Hamad Building Construction -SLVP-02A - Rev. 2.p18x Page 15 of 15 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.