Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Loading...
User Settings
close menu
Welcome to Scribd!
Upload
Read for free
FAQ and support
Language (EN)
Sign in
0 ratings
0% found this document useful (0 votes)
27 views
7 Site Inspection PDF
Uploaded by
Hang Chetha
AI-enhanced
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF or read online from Scribd
Download
Save
Save 7 Site Inspection.pdf For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
7 Site Inspection PDF
Uploaded by
Hang Chetha
0 ratings
0% found this document useful (0 votes)
27 views
26 pages
AI-enhanced title
Document Information
click to expand document information
Original Title
7 Site Inspection.pdf
Copyright
© © All Rights Reserved
Available Formats
PDF or read online from Scribd
Share this document
Share or Embed Document
Sharing Options
Share on Facebook, opens a new window
Facebook
Share on Twitter, opens a new window
Twitter
Share on LinkedIn, opens a new window
LinkedIn
Share with Email, opens mail client
Email
Copy link
Copy link
Did you find this document useful?
0%
0% found this document useful, Mark this document as useful
0%
0% found this document not useful, Mark this document as not useful
Is this content inappropriate?
Report
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF or read online from Scribd
Download now
Download as pdf
Save
Save 7 Site Inspection.pdf For Later
0 ratings
0% found this document useful (0 votes)
27 views
26 pages
7 Site Inspection PDF
Uploaded by
Hang Chetha
AI-enhanced title
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF or read online from Scribd
Save
Save 7 Site Inspection.pdf For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download as pdf
Jump to Page
You are on page 1
of 26
Search inside document
‘OVIF No. 001 IRA Number [. BOTANIC CONSTRUCTION & a ENGINEERING CO., LTD. ATE BOTANIC CITY PROJECT INSPECTION REQUEST & APPROVAL (IRA) REQUEST FROM CONTRACTOR IRA Type: Description of Works: mubbon preconpdRde 2 “ClOR3) Location: Building / Level | Gra External Date: Time: ] Related SURF! Drawing/Specs. Ref [Attachment \Work Package No, Work Package Name: Others BOTANIC To Attend [_] Re-schedule [Botanic CSAMEP Site Supervisor |Notes: Gra PreGoncreteiapecion HEIYS— #163 (lo §) Laboratory [Contractor Site Engineer: [Botanic Site Engineer: (Sign/Name/Date) |(Sign’Name/Date) REVIEW BY BOTANIC QAQC/CSA SUPERVISOR Rae Tmpecont be aredea TL] Fecehed es than 245s No Contadrs Engineer aondoa Mo Location ated Wot ryt et specter notnaued — CZ] [Drawing not yet approved [No Test equipment /Agency inspection for confirmation [—] [Material Not yet approved \Not approved material [Re-submission of RA Co No Primary tes esuts tached NotToow approved cawing fiamnicenichabe Yer tower deta EES Name/Date: Re-scheduled Date: Reason for re-schedule Hl Date & Time of Inspection time: INSPECTION REPORT (Enclose Inspection Result) 4 - pill remain - swoop xp eS Botanic QAQC/CSA/MEP Engineer's Comments: ~ Last) baile N te eppoved Lexy petercs] have refarg bh skek Status GQ Approved & Approvedwith Comments QO Rejected aes bys pate 12/0819. . [Checked by: D [Approved by: [z 7, Name “Pier Arron Fae Name: Nov.Suto be Steagay Name Date -30...0%..L4 loate eas ol |Contractor Site/Project Manager IBOTANIC Site Supervisor IBOTANIC Site MANA. Manager 564-19 eeProject : ORKIDE VILLA-BOTANIC CITY Address : Highway 68, Khan Chroy Chanva,PP Client: ORKIDE VILLA Contstruction Management : ORKIDE VILLA 3 Co, Ltd Contractor UJ INSPECTION/TEST CHECK LIST inspection subject : AC pipe (Copper Pipe) and Drainage Pipe for Mechanical Work [Request Ref. No. lOV-MEPARA.. Date: \Bultding/Area/Location Shop Howse Co #IV5 —H#162 Terotwontesecainton |mrthy sreennnt EPs (2 F) |Drawing No. ov No. Items To Be Checked Contractor) | Featt0) Inspection ov ‘Second (2nd) Inspection Remarks. YES] NO [VES NO YES[ NO [Check installed pipe size/material against approved drawing |v [Check installed pipe's location against approved drawing “ (Check installed pipe workmanship |Check pipe fixing or support “ [Check for wall penetration/sleeve ICheck for pipe insulation if any heck pipe backfill appropriately (if underground) (Check pipe ant-vibration 8 [Check for pipe alignment 10 |Check for pipe proper siope against approval (Drain pipe) 11 |Check for pipe devices and accessories as per approval 12 |Check for pipe final cleaning following the system application 13 |Ensure cabling and sparing part for future 14 | connection equipment 16 [Ensure No visible damage 16 [Ensure the pipe system ready to be tested 17 |Check pipe leakage/pressure test 1 Testing by Visible [2.Testing by Pressure Test [3.Testing by Gravity Test v < Rpateoe ee < KKK SARK KS [Above-mentioned work will be READY for INSPEGTION/ITEST on [comment : CN SREY FEE POLRENO TS ( spugeroesenrey cbstoeocdesndt hs ) | Reston lagi __estonatelhspacder ——_Poaton T Prepared by |inspected by lApproved by 504. 4 [Signation. — Gee |r Signation uo Pa ry, ni y06 Name Are edn Name MET SE Name lows OAM(MEP Work Accomplishment Report Abmer SOLUTION 10 ‘he Goran Construction Project: ‘ride vila the Botan ty Location (24 45 147149 351159.155,57,59,161 169 (20) 10s stage: {59 (2F Mechanieal sytem 19/08/2019, item [Deron Percentage Completed cope of Wea) i [Mechanical Sem 1 [AC Copper Pie System WZ 2 [exhaust FAN Sate 7 Prenre 182 Pierre 384 requested by checked vested by Approved by Puy 19/ oH'4 aor felt Meas eben ifeS SoeeeeyF2V'LV ASNOH dOHS Aiauael9\\u3Nnzauo- L\doriseqviesudos-uestsias/\:> sown | 7 cesmesaeara | il waeauma | —— symm inadeneins eonsuming | —— ea cone | 2, || wtmemeniooenoen | == comme | 52, || wimenmioaennm | om, [verona veauts || wentzeea aus | YALSAS ONINOILIONGO uv TRALSAS ONNOILIONOO UY ‘amon ein W31SKS NOLLVIIINGA ¥ ONINOILIGNOO UV 42 ol! RH OLE 6) swe 8) cer om 5) oes) EX) coevans FX saEv a) cA) twos TX) + " eon}+Tb OV IF No. 001 IRA Number [ ] “™ BOTANIC CONSTRUCTION & oa ww ENGINEERING CO., LTD. Rae = coltSHES ton BOTANIC CITY PROJECT INSPECTION REQUEST & APPROVAL (IRA) REQUEST FROM CONTRACTOR Descrition of Works: ibra green AGF C5 BS) Location; Building Level Grid External Date: [ Time: ] Related SURF: Drawing/Specs. Ref: |Attachment_ rk Package No. Jork Package Name: a Fack INotes Tas = 415 2 a re-Conerete Inspection 5 —Wla3 C5 B3) Laboratory 7 [Contractor Site Engineer: [Botanic Site Engineer. |Sign/Name/Date) |(Sign’Name/Date) REVIEW BY BOTANIC QAQC/CSA SUPERVISOR: Rejected inspection to be cartied out |] RecoWved less than 24H No Contractors Engineer attended No Location indicates Work not yet sat uo Inspocton not eaures = | Drawing not yet approved |No Test equipment /Agency Inspection forconfirmation [—] | [Material Not yet approved [Not approved material [Re-submission of IRA. oO No Primary test results attached Not olow approved drawing [Reason focesubmission: ters (write down in deta Not folow specication [Others BOTANIC To Attend |] _Re-schedule| ] [Botanic CSA/MEP Site Supervisor. Name/Date: Re-scheduled Reason for re-schedule: Date & Time of Inspection INSPECTION REPORT (Enclose Inspection Result) Botanic QAQC/CSA/MEP Engineer's Comments: = pW EFNEHI aa piltes ae Car plow the Zen), Al remain torial have to pree ob4 - ae Status [9 Approved -- ‘Approved with Comments O) Rejected Prepared by: Checked by: [Approved by: i ame dena dagAl Name MV SurdSeug ay. \Name >... | Ph, bate 24-'02-I: bate: 30.0F./: bate eas ObGnesve! ntractor Site/Project Manager |BOTANIC Site Supervisor |BOTANIC Site Manager 30. 814 Pane TaftProject : ORKIDE VILLA-BOTANIC CITY ‘Address : Highway 68, Khan Chroy Chanva,PP Client : ORKIDE VILLA Contstruction Management : ORKIDE VILLA 3 Co., Ltd Contractor INSPECTION CHECK LIST vo Inspection subject : PVC conduit installation for electrical system Request Ref. No. lOV-MEP.IRA. Date: Building/Area/Location Shop Hoerse Ca Hl45—H15 3 COEF) ‘Type Of Work To Be Carried Out [Drawing No. No, toms To Be Checked Contractor ov First (1st) Inspection ov ‘Second (2nd) Inspection Remarks NO. YEST NO YES NO (Check to be sure that installation condition is permited < |Check conduits run in straight alignment and parallel with ‘sufficient space |Check installation material against approved ‘Check installation against approved drawing (Check the conduit size and type as per designed and specified [Check bends of conduits to ensure the internal diameter will SSIS Inot be reduced [Ensure the number of conduit accessories, pattress box s) distribution box is followed the drawing [Ensure the installation technical is accepted < [Check installation workmanship is accepted [Check pipe cleanliness (No dirty and damage) |Above-mentioned work will be READY for INSPECTION on [Comment : Time: | mei Sang seo Sg LRG oes ype J — 4 Prepared by inspected by lApproved by (Contractor Representative |OV Representative OV Representative Ih, Sonate, Signation: Signation —¥ anes Fa Pe pind Name: SHAK Position Position: Site. yspedbor IPosition 0 Date: 2c/~0 P/F [Date: ov. 9 Date: Bo. 8. 8Pb mcr SOLUTION [MEP Work Accomplishment Report 0: ORKIDE VILA CO,LTD Project: (Orkid vila the Botanic iy Location: Block C2 #145 147,249,151,153 GF Sunits stage Mer Date: 24/08/2019, Tem ___[Dserption [Percentage Completed (Scope of Work) lL [Mechanical System 1 Ins Condition Copper Pipe G0 7 2 - Picture 182 eZ i) SAK) PE Bh, ? menor etl 24-0P1F 4.03.1425! ba IBV’ Lv 3SNOH dOHS A1suse19\AyINFTUD-L\dorysaq\yeaydos ues\siesn\:3 PI1 "0D VTA FINNO) Ayeooemi0e bu panies adindo Ge 7 commas | H SS] taoeasn | —— uy 1 | eta epee fo 94 2: tapheda tio | —— ainrant i Ge ‘oaownsere | S| | sumemnmnrinadenae | ie (naorwnccame | | etxpumnimncoaren seen | =e y anon evan | “ SS voxqnceg requis once me : He. < WALSAS ONINOLLIGNOS BI WALSAS ONINOLLIGNOO BIV oa Tasvia cee aL oon sone sou see W31SAS NOILWATINSA # ONINOILIONOO BIW = 9(OVIF No. 001 IRA Number [. j ty BOTANIC CONSTRUCTION & ENGINEERING CO., LTD. _BOTANIC CITY PROJECT _ INSPECTION REQUEST & APPROVAL (IRA) Date: RevNo: IRA Type: REQUEST FROM CONTRACTOR Description of Works: Fria PB Cy 124 GE) NF 4 2E Location: Building /Level Grid Extemat Date: exxed-79 | time: [05> FoaqM | Related SURF! Drawing/Specs, Ref [attachment fork Package No. lWork Package Name: Factory plates Onsite —-iPreConeroteinspection FF 1.2 GY (“/ £3) Laboratory 7 7 [Contractor Site Engineer: [Botanic Site Engineer. { Sigr/Name/Date) (SignNameDate) REVIEW BY BOTANIC QAQCICSA SUPERVISOR - Rejected Inspection to be carried out [—] Received less than 24Hrs |No Contractor's Engineer attended No Location indicated (Work not yet set up Inspection not required = [—] [Drawing not yet approved [No Test equipment /Agency Inspection forcontimation [—] Material Not yet approved [Not approved material [Resubmission of RA] No Primary test results attached [Not follow approved drawing Reason for submission: Others (write down in deta) 'Not flow specification (Others. BOTANIC To Attend [_] _Re-schedule’ janie CSAMEP Site Supervisor jame/Date: Re-scheduled ate: [Reason for re-schedule Date & Time of Inspection ime: INSPECTION REPORT (Enclose inspection Result) ~ aMofen a ne = Lashlleteo 4 hove — Ah Sable weed _ AG remsin metoris) Botanic QAQCICSA/MEP Engineer's Comments: BS ore ae dle approved ofos have £ plow haa oF oppor dey Sais D Approved Gi Approved with Comments Rejected [Prepared by: [Checked by: [Approved by; lh Name nie, oD nfl IName = MOV SU Sieug al... [Name pz SS eae ek each |Contractor Site/Project Manager [BOTANIC Site Supervisor [BOTANIC Site ManagerProject ORKIDE VILLA-BOTANIC CITY Address . Highway 88,Kknan Chroy Chanva,PP Client - ORKIDE VILLA Contstruction Management - ORKIDE VILLA 3 Co., Ltd Contractor i | linspection/Test subject : Gabie for Electrical System INSPECTION/TEST CHECK LIST 3 Request Ref. No. JOV-MEPIRA- Date: 2.4 -OR-/F [Bullaing/Area/Location Shop Mouse ca #/29 C288) ‘Type Of Work To Be Carried Out [Drawing No. INo. items To Be Checked ov Second (2ne) Remarks Inspection YES] NO 1 |No visible damage or impare safety 2 |Check for cable installation is protected against mechanical land visible supported ICheck for cable size LVBELV is to follow drawing approved. (Check cable color code’specification as per dwg) single diagram indication ‘Check quantity and location of cable is corrected [Check for property tabelling of cable Check protective conductor devices are suitable and secure Low voltage circuits seperated from extra low voltage circuit Icheck cable of all phases and neutral of the circuit bunched contained in the same circuit 10 |Ensure cable property to be tested 11 [Ensure the spare cable is property OX for connection 12 |Ensure the workmanship is OK 13 [Testing (Continuity Testy [Circuit number to best tested eemrr er FEEDERS: >. " 12 13 14 15 ve TAS eS SSS REKRKRRRRK SO ABPebmece SOLUTION [MEP Work Accomplishment Report ro ‘onkide vita COTO Project: (Otkde via the Botanic City Location Block CL #129 1unit GM, AF.2F Stage: ep Date: 24/08/2019 ee [Porcontage Completed Scope of Work) o ectrical Sistem 1 iting Cable Picture 1&2 Picture 3&4 Block Shophouse C1 #129 Whole Building tunis Requested by Checked By: Be 0919 Dopo nui RE-OPAT Verified by ‘Approved by: I Meas Ofna 30.8. 5Y'LY ASNOH dOHS Alauae1D\Ay3Nazuo- peevedeee ues\siasy\:D PH “09 WTIA Fao, sposmucese| v1aiA adDido oe(oueza wane ¥ AL edaireu ond ‘umoea i eg ro ahd ‘woes mene Ad OD ne | ‘neo | oo salen orton | WERLSAS-LINONOO Oh WaLSAS-LNGNOD DAd a ‘0 308VINA 338sn ‘lev LV ISNOH dOHS Ajauaeld\AyaNqasXuo- L\dorsaq\yeaydos' ues\siasf\'9 EER PHT “09 VTTIA FaDHO, ‘zoaouvina 335(ouoea mumun ¥AL RRND aN f4¥'LW ASNOH dOHS Aisuaes9\A¥3NFaUd- L\dopjseq\yeeydos'ues\ssas\:5 waza one) eg ON aaa gD nine wetone eaten oom ‘ALSAS LINGNOO Ona eau WALSAS LINGNOD Ad - 39. 119 eres Oey on 3) se fi) sey 2 rr (9) ae) cove (Xs AEN) Me) So fe aaa ce a iF PHT “09 WTIIA 3aI4O| Ago ee penny ft sbapl ch il ah Ph ~¥0304V1N3.338,OVIE No. got IRA Number [ } BOTANIC CONSTRUCTION & ENGINEERING CO., LTD. BOTANIC CITY PROJECT | INSPECTION REQUEST & APPROVAL (IRA) REQUEST FROM CONTRACTOR Description of Works: ashen Pan gs® (Ve ) oo es Location’ Building / Level Grid External Date: Time: ] Related SURFI: Drewing/Specs. Ref [attachment fork Package No.: Work Package Name: Factory > Notes: On site r Pre-Concrete Inspection 77/2. Laboratory contractor Site Engineer [Botanic Site Engineer. ‘Sign/Name/Date) (SignName/Date) REVIEW BY BOTANIC QAQC/CSA SUPERVISOR Rejected inspection to be cared out [—] | ReceWved ess than 24s [No Contractors Engineer ated |No Location Indicated Work not yet set up Inspection not required co Drawing not yt approved INo Test equipment Agency lespston for contimation [—] /Material Not yet approved [Not approved material [Re-submission of IRA Co No Primary test resus attached Not folow approved drawing Season bc submision ners (wnte down in deta It folow specication [others BOTANIC To Attend [__] Re-schedule[__] [Botanic CSA/MEP Site Supervisor. IName/Date: Re-scheduled Date & Time of, Inspection [Reason for re-schedule INSPECTION REPORT (Enclose inspection Result) Botanic QAQCICSA/MEP Engineer's Comments: fae / fectebtch, hice te feo P= © Rb cemedy metorinl hive & 416 a apprwe = pl pre need fesbng iy dey Status Q Approved Approved with Comments Q Rejected bata by: |Checked by: |Approved by: Name “aerarsleed fol Name NOU So Sra aX Jame bate 29/09/19... Date: 5.0...08. Date bas Oliawivoals |Contractor Site/Project Manager BOTANIC Site Supervisor |BOTANIC _ Site Manager D0. & 4 aeProject’: ORKIDE VILLA-BOTANIC CITY Address - HighWay 68, Khan Chroy Chanva,PP Client : ORKIDE VILLA Contstruction Management : ORKIDE VILLA 3 Co., Ltd ray Contractor cONSTREE Ton INSPECTION CHECK LIST Inspection subject: Drainage, Cold&Hot and Rain Wator Pipe installation Request Ref. No. lov-MEPARA Date Building/Area/Location ShopHouse Cz FE/2g Type Of Work To Be camred out | S PES RIT Banplé ee ! GO,FM fA Fj2E) [Drawing No. ov ov a tee Contactor | Fret tst) | Second 24)! Remarks Inspection | tnapection YES| NO | YES] NO [YES] NO [1 [Check tobe sure that instalation condition is permed z L 2 |Check pipe installation in straight alignment and paralisl with |v 3 [sufficient space and leveling is corrected 4 |Check instalation material against approved 7 4 5 [Check installation against approved drawing ¥ 6 [Check the installation technical is accepted v al | 7" [Check installation workmanship is accented v [Check pipe fixing and support and accessories z 2, 3_ [Check for pipe proper slone against aporoval 7 410 [Check pipe cleanliness (No airy and damage) < 71 |Gheck pipe backfil appropriately (if underground) 7 42 |Check for pipe is ready to do testing Pe |Above-mentioned work will be READY for INSPECTION on Time: [Comment : ; = ee eis emaaaie 2 2 i =| Prepared by Inspected by JApproved by Contractor bs aaa lov nome IOV Representative Signation; >See Z) Signation =r Signation Name Ropleafs Name: (DS Name Meas Channi wah Position: eae peedor Position: pete £4 /o8/1g Date: 01.19 pate” 30. £. 1FProject : ORKIDE VILLA-BOTANIC CITY ‘Address : Highway 6B, Khan Chroy Chanva,PP Client : ORKIDE VILLA Contstruction Management : ORKIDE VILLA 3 Co., Ltd Contractor uJ ‘CONSTRUE iON INSPECTION CHECK LIST inspection subject : Drainage, Cold&Hot and Rain Water Pipe Installation |Request Ref. No. lOV-MEPIRA. [ae |Building/Area/Location Shop NoeSe Cy #124 ‘Type Of Work To Be Carried Out orbrad seen PaSrxel GENE 4; 2F [Drawing No. No. Items To Be Checked Contractor ov First (tt) Inapection ‘Second (2nd) Inapection NO [VES] NO |Check to be sure that installation condition is permited T [Check pipe installation in straight alignment and parallel with x [sufficient space and levelling is corrected [Check installation against approved drawing [Check the installation technical is accepted [Check installation workmanship is accented 1 2 3 4 [Check installation material against approved 5 6 7 8 [Check pipe fixing and support and accessories 9 [Check tor pipe proper slope against approval ee 10 |Check pipe cleantiness (No dirty and damage) 11 [Check pipe backfil appropriately (if underground) 12 |Check for pipe is ready to do testing STSTISISISTSISTSIS |Above-mentioned work will be READY for INSPECTION on Time: [Commer By yapercngdla z nialp a epraeT ae Prepared by Inspected by lapproved by \Contractor ae jOv wt [OV Representative Sianaton soe ignation Nem tl Name: HS tame: Meas Qrcaint oak E Position: Position: Sipe. \wd Position: (BP Sit M4049 Date: 7S 08, 1g Date: 95 ok a Date ort Remarks"MEP Work Accomplishment Report To: The Botanic Construction Project: Crkide vila the Botanic City Location: c4# 129 Al Floor stage MEP 39/08/2019 item [Dserpton Percentage Completed (Scope of Work) Ti [Plumbing Sistem 1 [Cold Water System Ay 2 [Drainage System Picture 1&2 Picture 38.4 Requested by Checked By: Verified by: Approved by: = Ot J Kagget Hs Hor fi F/09F Ad = 94.19 eas onan[MEP Work Accomplishment Report To The Botanic Construction Project: (Orkide villa the Botanic Gty Location: (c1#129 al Roors tunit Stage: (Conduit piping System 19/08/2019 tem [Dseiption Percentage Compyeted (ope of Word [Conduit piping system BO. Picture 1&2 Picture 3&4 Requested by: Checked by: Verified by: ‘Approved by: a Sage LY. OY. (4 Yah, Mess alan 308.4 <=FtB OVIF No. oot IRA Number [ } q BOTANIC CONSTRUCTION & a a ty ENGINEERING CO., LTD. Rew Wo IRA Type: a cotgPRSS ow BOTANIC CITY PROJECT _ INSPECTION REQUEST & APPROVAL (IRA) REQUEST FROM CONTRACTOR Description of Works Ant rwd sreenns MF C10 &S) Location: Building / Level | Gra External Date: Time’ __] Related SURF: Drawing/Specs. Ref: Attachment: |Work Package No. |Work Package Name: _ 7 Fact INotes: al Gate [Pre-concrete inspection H/YS~— HIG? C 1083) Laboratory [~ |Contractor Site Engineer: Botanic Site Engineer: |signname/Date) (SignName/Date) REVIEW BY BOTANIC QAQC/CSA SUPERVISOR Rejected Inspection to be carried ox [—] Received less than 24Hrs. | (No Contractor's Engineer attended No Location indicated |Work not yet set up inspection not quired == (] Drawing not yet approved | ho Test equipment /Agency Inspection for confirmation | Material Not yet approved | Not approved material |Re-submission of IRA co No Primary test results attached |Not folow approved drawing [Reason fr e-submission [Others (write down in detai |Not folow specification ‘others, BOTANIC ToAtend[_] Re-Schedule[__] [Botanic CSA/MEP Site Supervisor Name/Date: Re-scheduled [Date [Reason for re-schedule: Date & Time of Inspection [rime INSPECTION REPORT (Enclose Inspection Result) Botanic "TEL, Le Engineer’s Comments: Sashleby hae fe Flog eppeved dog — ff remsn vrsterto] hel retary 7b she Status (Approved ‘Approved with Comments) Rejected Prepared by: Checked by: [Approved by: , vA Name: 2.232 ALC), Name Name bate 24 -O/'T [Date Date [Contractor Site/Project Manager IBOTANIC Site Supervisor Site ManagerProjec: ORKIDE VILLA-BOTANIC CITY Address - Highway 68,Khan Chroy Chanva,PP Client ORKIDE VILLA Contstruction Management ORKIDE VILLA 3 Co.,Ltd Contractor es) INSPECTION/TEST CHECK LIST Inspection/Test subject able for Electrica! System |Request Ref. No, OV-MEPIRAN. [Bae |Bullaing/Area/Location ShoPHouse Co Hd THES Cl0o$3) ‘Type Of Work To Be Carried Out [Drawing No. No. toms To Be Checked ov First (180) Inspection ov Second (2nd) Inapection YES | NO. YES[ NO Remarks 1 [No visible damage or impare safety 2 |Check for cable installation is protected against mechanical land visible supported 3 [Check for cable size LVEELV is to follow drawing approved \Check cable color code/specification as per dwg! single ‘diagram indication ICheck quantity and location of cabie is corrected \Check for property iabelling of cable |Check protective conductor devices are suttable and segure |Low voltage circuits seperated from extra low voltage gircui |Check cable of all phases and neutral of the circuit, Icontained in the same circuit 10 |Ensure cable property to be tested 11 |Ensure the spare cable is property OK for conn: 12 [Ensure the workmanship is OK 13 [Testing (Continuity Test) [circuit number to best tested oS SOT OS v < KAZ KEK 4 6h L LE[MEP Work Accomplishment Report Fed mer To: (ORKIDE VILA COTO SOLUTION Project: (Orkide villa the Botanic City Location Block €2 #145 147,149,151,153,255,157,159,161,163 MF 10units| Stage: MeP Date: 24/08/2019 Tem [osseription Percentage Completed (Scope of word TIL Mechanical Sytem 1 [Air Conction Copper Pipe 2 ventilation Exhaust Pipe Syatem Picture 1&2 Picture 3&4 Requested by Checked By: Verified by: ‘Approved by:(evi 3SNOH dOHS Auauaei9\\y3NazUD-L\dorjsaq\yeaydos-ues\siasn\:3 wmoamig | st ong ym B09 a | | wove | — | emer ovens | —— ato (600) 8 00617 =. A prunorn mina wen RH | coamewe | 2, || mummmewiiatenme | oe — equks vondio80 roauks | VeLSAS ONNOWIONOD UV "41s4s ONNOUIENOO IY va} = a sxsw WALSAS NOILVILLNA @ ONINOLLIGNGO IY 4”
You might also like
The Subtle Art of Not Giving a F*ck: A Counterintuitive Approach to Living a Good Life
From Everand
The Subtle Art of Not Giving a F*ck: A Counterintuitive Approach to Living a Good Life
Mark Manson
Rating: 4 out of 5 stars
4/5 (5982)
Principles: Life and Work
From Everand
Principles: Life and Work
Ray Dalio
Rating: 4 out of 5 stars
4/5 (624)
The Gifts of Imperfection: Let Go of Who You Think You're Supposed to Be and Embrace Who You Are
From Everand
The Gifts of Imperfection: Let Go of Who You Think You're Supposed to Be and Embrace Who You Are
Brene Brown
Rating: 4 out of 5 stars
4/5 (1112)
Never Split the Difference: Negotiating As If Your Life Depended On It
From Everand
Never Split the Difference: Negotiating As If Your Life Depended On It
Chris Voss
Rating: 4.5 out of 5 stars
4.5/5 (898)
The Glass Castle: A Memoir
From Everand
The Glass Castle: A Memoir
Jeannette Walls
Rating: 4.5 out of 5 stars
4.5/5 (1737)
Sing, Unburied, Sing: A Novel
From Everand
Sing, Unburied, Sing: A Novel
Jesmyn Ward
Rating: 4 out of 5 stars
4/5 (1238)
Hidden Figures: The American Dream and the Untold Story of the Black Women Mathematicians Who Helped Win the Space Race
From Everand
Hidden Figures: The American Dream and the Untold Story of the Black Women Mathematicians Who Helped Win the Space Race
Margot Lee Shetterly
Rating: 4 out of 5 stars
4/5 (932)
Grit: The Power of Passion and Perseverance
From Everand
Grit: The Power of Passion and Perseverance
Angela Duckworth
Rating: 4 out of 5 stars
4/5 (619)
The Perks of Being a Wallflower
From Everand
The Perks of Being a Wallflower
Stephen Chbosky
Rating: 4.5 out of 5 stars
4.5/5 (2119)
Shoe Dog: A Memoir by the Creator of Nike
From Everand
Shoe Dog: A Memoir by the Creator of Nike
Phil Knight
Rating: 4.5 out of 5 stars
4.5/5 (546)
The Hard Thing About Hard Things: Building a Business When There Are No Easy Answers
From Everand
The Hard Thing About Hard Things: Building a Business When There Are No Easy Answers
Ben Horowitz
Rating: 4.5 out of 5 stars
4.5/5 (356)
Her Body and Other Parties: Stories
From Everand
Her Body and Other Parties: Stories
Carmen Maria Machado
Rating: 4 out of 5 stars
4/5 (831)
Elon Musk: Tesla, SpaceX, and the Quest for a Fantastic Future
From Everand
Elon Musk: Tesla, SpaceX, and the Quest for a Fantastic Future
Ashlee Vance
Rating: 4.5 out of 5 stars
4.5/5 (476)
Bad Feminist: Essays
From Everand
Bad Feminist: Essays
Roxane Gay
Rating: 4 out of 5 stars
4/5 (1058)
The Emperor of All Maladies: A Biography of Cancer
From Everand
The Emperor of All Maladies: A Biography of Cancer
Siddhartha Mukherjee
Rating: 4.5 out of 5 stars
4.5/5 (275)
Steve Jobs
From Everand
Steve Jobs
Walter Isaacson
Rating: 4.5 out of 5 stars
4.5/5 (814)
The Outsider: A Novel
From Everand
The Outsider: A Novel
Stephen King
Rating: 4 out of 5 stars
4/5 (1953)
Angela's Ashes: A Memoir
From Everand
Angela's Ashes: A Memoir
Frank McCourt
Rating: 4.5 out of 5 stars
4.5/5 (443)
Brooklyn: A Novel
From Everand
Brooklyn: A Novel
Colm Toibin
Rating: 3.5 out of 5 stars
3.5/5 (2029)
The Little Book of Hygge: Danish Secrets to Happy Living
From Everand
The Little Book of Hygge: Danish Secrets to Happy Living
Meik Wiking
Rating: 3.5 out of 5 stars
3.5/5 (424)
The World Is Flat 3.0: A Brief History of the Twenty-first Century
From Everand
The World Is Flat 3.0: A Brief History of the Twenty-first Century
Thomas L. Friedman
Rating: 3.5 out of 5 stars
3.5/5 (2272)
A Man Called Ove: A Novel
From Everand
A Man Called Ove: A Novel
Fredrik Backman
Rating: 4.5 out of 5 stars
4.5/5 (4851)
The Yellow House: A Memoir (2019 National Book Award Winner)
From Everand
The Yellow House: A Memoir (2019 National Book Award Winner)
Sarah M. Broom
Rating: 4 out of 5 stars
4/5 (99)
The Sympathizer: A Novel (Pulitzer Prize for Fiction)
From Everand
The Sympathizer: A Novel (Pulitzer Prize for Fiction)
Viet Thanh Nguyen
Rating: 4.5 out of 5 stars
4.5/5 (125)
Yes Please
From Everand
Yes Please
Amy Poehler
Rating: 4 out of 5 stars
4/5 (1949)
Devil in the Grove: Thurgood Marshall, the Groveland Boys, and the Dawn of a New America
From Everand
Devil in the Grove: Thurgood Marshall, the Groveland Boys, and the Dawn of a New America
Gilbert King
Rating: 4.5 out of 5 stars
4.5/5 (270)
The Art of Racing in the Rain: A Novel
From Everand
The Art of Racing in the Rain: A Novel
Garth Stein
Rating: 4 out of 5 stars
4/5 (4255)
A Tree Grows in Brooklyn
From Everand
A Tree Grows in Brooklyn
Betty Smith
Rating: 4.5 out of 5 stars
4.5/5 (1934)
Team of Rivals: The Political Genius of Abraham Lincoln
From Everand
Team of Rivals: The Political Genius of Abraham Lincoln
Doris Kearns Goodwin
Rating: 4.5 out of 5 stars
4.5/5 (235)
The Woman in Cabin 10
From Everand
The Woman in Cabin 10
Ruth Ware
Rating: 3.5 out of 5 stars
3.5/5 (2587)
A Heartbreaking Work Of Staggering Genius: A Memoir Based on a True Story
From Everand
A Heartbreaking Work Of Staggering Genius: A Memoir Based on a True Story
Dave Eggers
Rating: 3.5 out of 5 stars
3.5/5 (232)
Fear: Trump in the White House
From Everand
Fear: Trump in the White House
Bob Woodward
Rating: 3.5 out of 5 stars
3.5/5 (805)
Wolf Hall: A Novel
From Everand
Wolf Hall: A Novel
Hilary Mantel
Rating: 4 out of 5 stars
4/5 (4042)
On Fire: The (Burning) Case for a Green New Deal
From Everand
On Fire: The (Burning) Case for a Green New Deal
Naomi Klein
Rating: 4 out of 5 stars
4/5 (75)
Rise of ISIS: A Threat We Can't Ignore
From Everand
Rise of ISIS: A Threat We Can't Ignore
Jay Sekulow
Rating: 3.5 out of 5 stars
3.5/5 (139)
John Adams
From Everand
John Adams
David McCullough
Rating: 4.5 out of 5 stars
4.5/5 (2411)
Manhattan Beach: A Novel
From Everand
Manhattan Beach: A Novel
Jennifer Egan
Rating: 3.5 out of 5 stars
3.5/5 (883)
The Constant Gardener: A Novel
From Everand
The Constant Gardener: A Novel
John le Carré
Rating: 3.5 out of 5 stars
3.5/5 (108)
The Unwinding: An Inner History of the New America
From Everand
The Unwinding: An Inner History of the New America
George Packer
Rating: 4 out of 5 stars
4/5 (45)
The Light Between Oceans: A Novel
From Everand
The Light Between Oceans: A Novel
M.L. Stedman
Rating: 4.5 out of 5 stars
4.5/5 (789)
20210126-PPR Poligon
Document
3 pages
20210126-PPR Poligon
Hang Chetha
No ratings yet
HDPE New Price List Update
Document
7 pages
HDPE New Price List Update
Hang Chetha
No ratings yet
MEP Team PDF
Document
18 pages
MEP Team PDF
Hang Chetha
No ratings yet
Boq FHC
Document
3 pages
Boq FHC
Hang Chetha
No ratings yet
40 44
Document
5 pages
40 44
Hang Chetha
No ratings yet
How To Calculate Septic Tank Size - Civilology
Document
5 pages
How To Calculate Septic Tank Size - Civilology
Hang Chetha
No ratings yet
DB Board Excel Type - Rev 02
Document
1 page
DB Board Excel Type - Rev 02
Hang Chetha
No ratings yet
Soil Testing Document
Document
70 pages
Soil Testing Document
Hang Chetha
100% (1)
Little Women
From Everand
Little Women
Louisa May Alcott
Rating: 4 out of 5 stars
4/5 (105)