Job Ref 22293
Triaxial Permeability Test
Borehole/Pit No. BH1
Site Name The Grove, Abington Road, Litlington Sample No. -
Project ID - Client J&M Contractors Depth m Ground Level
Sample Type B
Dark brown slightly gravelly slightly sandy silty CLAY with numerous
Soil Description
rootlets Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017
Orientation within original
Specimen Type/Preparation Remoulded Vertical
sample
In acordance with Clause
Specimen Details Initial Final Saturation Details 5.4.3
Height mm 115.0 - Initial Pore Pressure Parameter B 0.60
Diameter mm 105.0 - Final Pore Pressure Parameter B 1.00
Bulk Density Mg/m³ 1.70 1.76 Duration 3
Water Content % 33 34
Dry density Mg/m³ 1.28 1.31 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300
Cell Pressure applied kPa 400 Base Pressure kPa 350
kPa 300 Pressure Difference` kPa -50
Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
2 Duration Days 1
Duration Days
Coeffecient of Permeability at 200C 6.48E-10
Permeability Stage
7
5
Cummulative infrlow mL
0
0 50 100 150 200 250 300 350 400 450
Time (mins)
Test Report by K4 SOILS LABORATORY Checked and Aproved
Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email:
[email protected] Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)
Job Ref 22293
Triaxial Permeability Test
Borehole/Pit No. BH1
Site Name The Grove, Abington Road, Litlington Sample No. -
Project ID - Client J&M Contractors Depth m 1.00
Sample Type B
Off white silty sandy CLAY with numerous fmc and angular to sub-
Soil Description
angular mudstone fragments Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017
Orientation within original
Specimen Type/Preparation Remoulded Vertical
sample
In acordance with Clause
Specimen Details Initial Final Saturation Details 5.4.3
Height mm 115.0 - Initial Pore Pressure Parameter B 0.49
Diameter mm 105.0 - Final Pore Pressure Parameter B 1.00
Bulk Density Mg/m³ 2.02 2.09 Duration 3
Water Content % 20 22
Dry density Mg/m³ 1.68 1.71 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300
Cell Pressure applied kPa 400 Base Pressure kPa 350
kPa 300 Pressure Difference` kPa -50
Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
1 Duration Days 1
Duration Days
Coeffecient of Permeability at 200C 2.04E-09
Permeability Stage
18
16
14
12
Cummulative infrlow mL
10
0
0 50 100 150 200 250 300 350
Time (mins)
Test Report by K4 SOILS LABORATORY Checked and Aproved
Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email:
[email protected] Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)
Job Ref 22293
Triaxial Permeability Test
Borehole/Pit No. BH1
Site Name The Grove, Abington Road, Litlington Sample No. -
Project ID - Client J&M Contractors Depth m 2.00
Sample Type B
Light grey silty sandy CLAY with numerous fmc and angular to sub-
Soil Description
angular mudstone fragments Samples received 02/02/2017
Schedule received 03/02/2017
Test Method BS1377: Part 6 : Clause 5 1990 Date started 17/02/2017
Orientation within original
Specimen Type/Preparation Remoulded Vertical
sample
In acordance with Clause
Specimen Details Initial Final Saturation Details 5.4.3
Height mm 115.0 - Initial Pore Pressure Parameter B 0.36
Diameter mm 105.0 - Final Pore Pressure Parameter B 0.96
Bulk Density Mg/m³ 2.05 2.14 Duration 3
Water Content % 16 19
Dry density Mg/m³ 1.76 1.80 Permeability Stage
Cell Pressure kPa 400
Consolidation Stage Top Pressure kPa 300
Cell Pressure applied kPa 400 Base Pressure kPa 350
kPa 300 Pressure Difference` kPa -50
Ba ck Pressure
kPa 100 Mean Effective Stress kPa 75
Effective Pressure
1 Duration Days 1
Duration Days
Coeffecient of Permeability at 200C 1.53E-08
Permeability Stage
50
45
40
35
Cummulative infrlow mL
30
25
20
15
10
0
0 20 40 60 80 100 120 140
Time (mins)
Test Report by K4 SOILS LABORATORY Checked and Aproved
Unit 8 Olds Close Olds Approach
Watford Herts WD18 9RU Initials K.P
Tel: 01923 711 288
Email:
[email protected] Date 02/03/2017
MSF5-R35 Approved Signatories: K.Phaure (Tech.Mgr) J.Phaure (Lab.Mgr)