Daily Activity Report: Coulomb Energy Technik, Inc

The document contains daily activity reports from March 17-27 for Mark V. Baniqued, a project engineer at Coulomb Energy Technik, Inc. The reports detail his daily tasks, such as meetings, report preparation, project coordination, and gathering files. They are approved by his supervisor John Jerome G. Dizon.

Uploaded by

John Jerome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views7 pages

Daily Activity Report: Coulomb Energy Technik, Inc

The document contains daily activity reports from March 17-27 for Mark V. Baniqued, a project engineer at Coulomb Energy Technik, Inc. The reports detail his daily tasks, such as meetings, report preparation, project coordination, and gathering files. They are approved by his supervisor John Jerome G. Dizon.

Uploaded by

John Jerome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

17/03/2020 9:00am Setup Workplace; Preparation for Meeting


10:00am‐12:00pm Meeting with Project Management Department
12:00pm ‐ 1:00 pm  Lunch Time
1:00pm‐3:00pm Make Report; Review and list Tasks needed to Accomplish by the PM Group
3:00pm ‐ 4:00pm Make an email for the updates in LTO projects
4:00pm ‐ 5:30pm Went to office to get the files needed for reference
5:30pm ‐ 6:00pm Prepare Equipment List as per instruction by Sir Jerome

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

18/03/2020 9:00am‐10:00am Coordination on LTO regarding on requirements on CFEIs


10:00am‐12:00pm Prepare progress reports and billing for SO2018‐047 Megapower Project (Alphaland Balesin)
2:00pm‐4:00pm Prepare progress reports and billing for SO2018‐037 Megapower Project (Alphaland Baguio)
4:00pm ‐ 6:00pm Revision of 5th Progress Billing for SO2018‐089 Aboitiz Project
6:00pm ‐ 7:00pm Reviewing the additional works for Aboitiz Project that subject for creation of proposals

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

19/03/2020 9:00am‐10:00am Follow up status to Ma'am Sushmita of Aboitiz regarding with Extended Pedestal Billing


10:00am‐12:00pm Prepare Progress Reports and Final Billing for Malvez Project
12:00pm ‐ 1:00 pm  Lunch Time
1:00pm‐3:00pm Gathering documents and reference for creation of electrical plan for Caramoan Projects
3:00pm ‐ 6:00pm Went to office to have an assitance to JFY regarding on myqnap acoount to have remote access on NAS

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

20/03/2020 11:00am‐12:00pm Reviewing of emails


12:00pm ‐ 1:00 pm  Lunch Time
3:00pm ‐ 6:00pm Went to office to get the files needed for reference / verification on RITM billing
7:30pm ‐ 9:45pm Conference call meeting with PM Team to wrap‐up our week
21/03/2020 2:00pm ‐ 4:00pm Went to office to convert PDF file to CAD at JVB Desktop (Caramoan Project) and to borrow PC monitor 

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

23/03/2020 10:00am‐11:30am Project updates


11:30am‐12:30pm Break
12:30pm‐1:30pm Preparation for the online meeting regarding Aboitiz 69kV Transmission Line Project
1:30pm ‐ 6:30 pm  Online meeting via Zoom with Sir Domeng, Sir Ruge, Sir Jerome and Royser Enterprise

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

26/03/2020 9:00am ‐ 11:00am Reviewing of Projects


11:00am ‐ 1:00pm Transferring of Maibarara BOQ into CETI's Proposal Template.
1:00pm‐2:00pm Break
2:00pm ‐ 6:00pm Revision of Project Progress Report for Aboitiz Project as per comments of Sir Domeng

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager
DAILY ACTIVITY REPORT

COULOMB ENERGY TECHNIK, INC.


Unit 4-L, Amber Place Bldg., Bayani Road,
AFPOVAI Ph. IV, Fort Bonifacio, Taguig City, Philippines 1630

(02) 804 - 1725 / (02) 697 - 6359


[email protected]

DATE TIME ACTIVITIES

27/03/2020 9:00am ‐ 10:30am Reviewing of Projects and went to office


10:30am ‐ 12:00pm Coordination to Sir Philip for some clarification matters on Caramoan Projects
12:00pm‐1:00pm Break
1:00pm ‐ 2:00pm Scanning of Billing documents for Wyeth
2:00pm ‐ 3:00pm Requesting Quotation to Sir Orly of Megamaster for Emergency Transformer Rental for Wyeth
3:00pm ‐ 4:00pm Follow‐ups on LTO Project Updates to Engr. Baby thru phone call
4:00pm ‐ 6:00pm Continuation on Revision of Project Progress Report for Aboitiz Project

PREPARED BY: APPROVED BY:

MARK V. BANIQUED, REE JOHN JEROME G. DIZON, REE
Project Engineer Asst. Project Manager