Audit Report
Audit Report
Audit Report
Report# DTG/01/1214
DTG/01/1214 1 of 6
Table of Contents
Objective........................................................................................................3
Scope of Audit.................................................................................................3
Current NALG Environment................................................................................4
Findings and Recommendations.........................................................................5
Action Plans.....................................................................................................6
DTG/01/1214 2 of 6
Objective
The objective of the VMware environment audit is as follows:
Scope of Audit
The scope of the audit is:
Review and analyze the complete IT Infrastructure environment. It shall
include but not limited to the following areas: Network Infrastructure, Storage
Infrastructure, Systems Analysis and Virtualization Implementation.
To perform other procedures if deemed necessary to achieve the audit
objectives.
DTG/01/1214 3 of 6
Current NALG Environment
The current NALG Environment consists of the following Hardware:
NetApp Storage FAS2240 with Dual FC controller 24x600GB HDD
VMware Infrastructure consisting of
o Physical Machines
Two Fujitsu Primergy RX 300S7 (SN: YLAR025138 and YLAR025139)
o Virtual Machines
Ten Virtual Machines:
HRPR (AX Dynamics 2009, Windows 2008 standard)
Emiserver (MS GP 9, Windows 2003 Server)
Travesvr (Oracle)
Focusserver (SQL, windows 2003 Server)
Hrserver (DHCP, Windows 2003 Server)
Domain (Windows 2003 Server)
Veeam
Vcenter
Windows XP
Network Infrastructure
Two HP E2910-24G al switches
Veeam Backup Infrastructure
DTG/01/1214 4 of 6
Findings and Recommendations
No. Findings Recommendations
1. The ESXi Hosts do not have Raid configured in Raid-1 is recommended for the ESXi hosts for the local
the Local Disks disks.
2. The memory of the VMware environment is Upgrade the RAM from 32 GB to 64 GB on both the
hitting more than 50%. In case of any host failure hosts
the other host cannot take the load of all the VMs
3. The network infrastructure is flat. It contains only To create multiple vlans, as per the requirement, at
one subnet with all the devices in it. least 4 vlans are required. Changes needs to be done
in the firewalls, DNS, etc.
4. Virtual Switches are not configured as per There is a change in the network design required to do
recommended methodology this in order to let vlans into the VMware
Infrastructure.
5. Backup server is a VM with Veeam software. It It is highly recommended to keep the backup server to
does not take application level backups be physical and outside the VM environment. The
software needs to be upgrade to enterprise level to
take application and NetApp File Server backups.
6. NetApp storage reaching its limits. Certain configuration needs to be done in order to
better utilize the storage.
DTG/01/1214 5 of 6
Action Plans
The following action plans should be carried out:
DTG/01/1214 6 of 6