Thyssenkrupp Industrial Solutions (India) Job Safety Analysis 1 7

1. The document outlines a job safety analysis for hydro test and field instrument installation work for the BS VI PDR project at Indian Oil Corporation's Paradip Refinery. 2. Key hazards identified include exceeding the maximum allowable pressure, unattended pressurized tools/equipment, unsafe depressurization of hydrotest fluid, equipment damage, human negligence, mishandling of materials, and physical injury. 3. Control measures specified are obtaining work permits, properly barricading areas, using pressure relieving devices, qualifying personnel, inspecting tools, and having site engineers and HSE personnel monitor the work.

Uploaded by

abhijit jana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views4 pages

Thyssenkrupp Industrial Solutions (India) Job Safety Analysis 1 7

1. The document outlines a job safety analysis for hydro test and field instrument installation work for the BS VI PDR project at Indian Oil Corporation's Paradip Refinery. 2. Key hazards identified include exceeding the maximum allowable pressure, unattended pressurized tools/equipment, unsafe depressurization of hydrotest fluid, equipment damage, human negligence, mishandling of materials, and physical injury. 3. Control measures specified are obtaining work permits, properly barricading areas, using pressure relieving devices, qualifying personnel, inspecting tools, and having site engineers and HSE personnel monitor the work.

Uploaded by

abhijit jana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

11-2019

BS VI Project

Indian Oil Corporation, Paradip Refinery

Reference
thyssenkrupp
JOB SAFETY ANALYSIS BSVI-HSE-FORMAT-001/19. Rev.01
Industrial Solutions
(India) Page 1 of 7

Job area is considered: Establishment/Project: COMPOSITE JSA No.: TEL/COMPO/JSA/0


Job title: Hydro test and field instrument installation. Work for BS-VI PDR.
Contractor / Agency Performing Job: M/s Tuaman Engineering Limited Project No / FOA No: 25284124-8720-
CP-00000012/2019-20/FOA/112

Prepared By: Reviewed By: tkIS India: IOCL:

1. Jagadish Mallick 1. A.K.Bala 1. 1.


Person participating
2. Animesh Sinha 2. Souvik Dey 2. 2.
in Job Safety
Analysis. 3. 3. H.Pattnayak 3. 3.
4. 4.
5. 5.

JOB DESCRIPTION: Hydro test and field instrument installation.

Requirement of adding Personal Protection Requirement of adding special equipment or tool


Requirement of Working Permit Equipment.
(Check the relevant box) (Additional list)
Restricted space 1. Safety Shoe 1. Multi Gas Detector 5.
Heating job 2. Safety Helmet 2. 6.
Digging 3. Safety Goggles 3. 7.
Isolation / Energization 4. Hand Gloves 4. 8.
Other job 5. Dust Mask

JSA considering procedure Yes No Comment

BS VI Project Form: Job Safety Analysis


01-2019
11-2019
BS VI Project

Indian Oil Corporation, Paradip Refinery

Reference
thyssenkrupp
JOB SAFETY ANALYSIS BSVI-HSE-FORMAT-001/19. Rev.01
Industrial Solutions
(India) Page 2 of 7

Is JSA establishment participated by job implementing


group?

Is JSA considered by Job implementing group before


carrying out the job?

Is JSA sheet used/ consulted in work implementation?

Is the job carried out step by step?

Do you propose to improve JSA sheet (give in detail)

Is detail of any trouble showing

BS VI Project Form: Job Safety Analysis


01-2019
11-2019
BS VI Project

Indian Oil Corporation, Paradip Refinery

Reference
thyssenkrupp
JOB SAFETY ANALYSIS BSVI-HSE-FORMAT-001/19. Rev.01
Industrial Solutions
(India) Page 3 of 7

ACTIVITIES HAZARD/ DANGER CONTROL MEASURE ACTION

Separate the job into Describe all hazards identified for Describe fully all equipment, facility,
the main tasks and each task based on observations and/or procedure controls applicable
record them in and experience. for each hazard.
sequence.
Ensure permit prior to start the work.
Exceeding Maximum Allowable Pressure Ensure the pressure reliving device is set. Action taken by Site
Un-attended Pressurized Tool / Equipment Barricade the area properly.
Hydro Test Engineer & HSE
Changing the Duration of Hydrotest
Personnel
Unsafe Depressurization of Hydro test Fluid

Field Instrument Installation Equipment damage human negligence Proper access must be provided
Mishandling of material Use correct tools for the job to be inspected prior to use. Action taken by Site
Permanent disability or death Engineer & HSE
Physical injury Qualified person shall be available to perform the job. Personnel
Cut and injury while carrying and fitting works

Note: - If anything in this JSA requires modification/changes in course of time during execution of the job – another JSA will be done and modified points will be

added.

BS VI Project Form: Job Safety Analysis


01-2019
11-2019
BS VI Project

Indian Oil Corporation, Paradip Refinery

Reference
thyssenkrupp
JOB SAFETY ANALYSIS BSVI-HSE-FORMAT-001/19. Rev.01
Industrial Solutions
(India) Page 4 of 7

Prepared by Reviewed by Reviewed by Approved by


(Contractor) (Contractor) (tkIS / IOCL) (tkIS / IOCL)
Name: Name: Name: Name:

Designation: Designation: Designation: Designation:


Signature: Signature: Signature: Signature:

Date: Date: Date: Date:

BS VI Project Form: Job Safety Analysis


01-2019