Plumbing - Check List - Flat

The document outlines quality check items for various stages of water supply piping, soil and waste piping, and installation of sanitary fixtures and faucets. It includes checks for material verification, layout marking, support provisions, joint sealing, hydraulic testing and commissioning at different stages of laying pipes and installing fixtures to ensure compliance with specifications and drawings.

Uploaded by

Md Abdul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views3 pages

Plumbing - Check List - Flat

The document outlines quality check items for various stages of water supply piping, soil and waste piping, and installation of sanitary fixtures and faucets. It includes checks for material verification, layout marking, support provisions, joint sealing, hydraulic testing and commissioning at different stages of laying pipes and installing fixtures to ensure compliance with specifications and drawings.

Uploaded by

Md Abdul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Item of Work: Water Supply Piping

Before laying of pipes


S.No
Item description Status Remarks
1 Is the marking of routes of pipes on site verified before
chasing of walls is taken up?

2 Are the vertical levels of pipes verified as per the approved


shop drawing?

3 Is the material of the pipe used of the approved make and


as per the specifications?
4 Are necessary sleeves / cutouts provided in walls where
the pipes are shown passing through the walls?

During laying of pipes


S.No
Item description Status Remarks
1 Is the provision of tees, elbows, reducers and adaptors
appropriate as per the drawings?
2 Is the provision of valves appropriate as per the drawings?

3 Is concealed pipework coated with anti - corrossive


bitumen paint as specified?
4 Is primer (of zinc chromate / red oxide / as specified)
applied on exposed pipework?
5 Is enamel paint (specified no: of coats and of aproved
quality) applied over primer for exposed pipework?
6 Are hot water pipes insulated with closed cell electrometric
synthetic rubber tube as per specifications?

After laying of pipes


S.No
Item description Status Remarks
1 Are proper clamps provided to support the pipes?

2 Is pipework in shaft / terrace supported by means of MS


structural supports and clamps?
3 Is the water supply system hydraulically tested?
4 Have the gaps (if any) at sleeves / cutouts after laying of
pipes been sealed?
5 Have identification marks for hot water supply pipes been
marked?
6 Is the flow directions marked?
Item of Work: Soil, Waste and Vent Piping
Before laying of pipes
S.No
Item description Status Remarks
1 Is the marking of routes of pipes on site verified
before chasing of walls is taken up?
2 Are the vertical levels of pipes verified as per the
approved shaft drawing?
3 Is the material of the pipe used of the approved make
and as per the specifications?
4 Are necessary sleeves / cutouts provided in walls
where the pipes are shown passing through the
walls?

During laying of pipes


S.No
Item description Status Remarks
1 Are pipes laid in sunken floors encased in concreting
adequately as specified?

2 Are pipes underslung from ceiling have proper MS


structural supports and clamps?
3 Is the spacing between the supports and clamps
proper?
4 Is the provision of tees, elbows, reducers and
adaptors appropriate as per the drawings?
5 Is the provision of valves appropriate as per the
drawings?
6 Is primer being applied on exposed pipes?
7 Is specified number of coats of enamel paint applied
over primer on exposed pipes as per the
specifications?
8 Is the concealed pipework being coated with anti -
corrossive paint as per the specifications?

After laying of pipes


S.No
Item description Status Remarks
1 Is the drainage system hydraulically tested?
2 Have the gaps (if any) at sleeves / cutouts after
laying of pipes filled with cement concrete and sealed
with an approved sealant?

3 Is the flow directions marked?


Item of Work: Installation of Sanitary fixtures and Faucets
Before installation
S.No
Item description Status Remarks
1 Are the sanitary fixtures / fittings delivered at site
of the approved make, color and model no:?
2 Is the layout marking for plumbing fixtures
complete?
3 Is the hydraulic testing of pipes completed and
found satisfactory?

During installation
S.No
Item description Status Remarks
1 Is the location, alignment and elevation level of
the fixture straight and true as per the drawings /
details?

After installation
S.No
Item description Status Remarks
1 Have the joints / gaps between the fixtures and
the walls filled with the sealing agent as per the
specifications?
2 Is connection to water supply, waste, soil and
vent pipes complete?
3 Is the testing and commissioning of the system
complete?