Project: Proposed I-Tower 3 Subject: Structural Requirements For Sub Structure 1. Formworks and Concrete
Project: Proposed I-Tower 3 Subject: Structural Requirements For Sub Structure 1. Formworks and Concrete
Project: Proposed I-Tower 3 Subject: Structural Requirements For Sub Structure 1. Formworks and Concrete
B. SBR
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2 2.3 0.8 6.88 3.68
WALLS 6.3 6.25 0.25 78.75 9.84
TOP SLAB 0 0 0 0 0.00
C. EQT
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 21.655 1 0.8 36.248 17.32
WALLS 15.7 5.325 0.25 167.205 20.90
SUMPIT 0.9 0.9 0.4 1.44 0.32
TOP SLAB 21.655 1 0.15 21.655 3.25
D. CCT
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 3.5 5.4 0.8 14.24 15.12
WALLS 14.3 5.325 0.25 152.295 19.04
BAFFLE WALLS 8.4 3 0.1 51.9 2.52
SUMPIT 0.9 0.9 0.4 1.44 0.32
TOP SLAB 3.5 5.4 0.15 18.9 2.84
E.EFF
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2.95 1.75 0.8 6.12 4.13
WALLS 7.65 5.325 0.25 81.4725 10.18
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
F. SET
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 4.9 1.75 0.8 9.24 6.86
WALLS 7.65 5.325 0.25 81.4725 10.18
PARTITION 1 1.4 0.8 0.15 2.69 0.17
PARTITION 2 1.4 3.4 0.15 10.75 0.71
TOP SLAB 4.9 1.75 0.15 8.575 1.29
G. COAG TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2.85 1.3 0.15 3.705 0.56
WALLS 2.95 1.35 0.25 7.965 1.00
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
G.FLO-1 TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 1.35 1.3 0.15 1.755 0.26
WALLS 2.15 2.85 0.25 12.255 1.53
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
H.FLO-2 TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 1.35 1.3 0.15 1.755 0.26
WALLS 2.15 2.85 0.25 12.255 1.53
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
H.OTHERS
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
EFF-COAG SLAB 1.3 1.5 0.15 1.95 0.29
EFF-COAG WALL 1.3 2.15 0.15 6.43 0.42
OVER ALL TOP 0 0 0 0 0.00
I.FIRE TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 37.1068 1 0.4 13.4992 14.84
WALLS 33.75 4.5 0.25 303.75 37.97
SUMPIT 0 0 0 0 0.00
TOP SLAB 37.1068 1 0.15 37.1068 5.57
J. CISTERN
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 13.7 5.675 0.2 7.75 15.55
WALLS 38.75 3.925 0.25 304.1875 38.02
SUMPIT 1.2 1.2 0.4 3.84 0.00
PEDESTAL 38.75 1.2 0.25 93 11.63
TOP SLAB 13.7 5.675 0.15 77.7475 11.66
K.TOTAL
FORMS CONCRETE
2,092.78 357.07
LOCATION: CISTERN
DIAMETER UNT.WT. QTY. LENGTH TOTAL WT. DESCRIPTION
16 1.578 388 5.538 3,390.72 VERTICAL BARS
12 0.888 38 6 202.46 HORIZONTAL BAR
12 0.888 38 3.7 124.85 HORIZONTAL BAR
12 0.888 76 5.18 349.59 HORIZONTAL BAR
12 0.888 38 1.8 60.74 HORIZONTAL BAR
12 0.888 38 6 202.46 HORIZONTAL BAR
12 0.888 38 4.3 145.10 HORIZONTAL BAR
12 0.888 38 2 67.49 HORIZONTAL BAR
12 0.888 162 0.8 115.08 CORNER BARS
10 0.616 236 1.7 247.14 CRANKED
10 0.616 50 3.4 104.72 SUMPIT CRANKED
10 0.616 25 1.85 28.49 SUMPIT STRAIGHT
10 0.616 50 2.2 67.76 SUMPIT CRANKED
10 0.616 50 0.6 18.48 SUMPIT DIAGONAL
10 0.616 78 1.85 88.89 SUMPIT HORIZONTAL
12 0.888 104 6 554.11 SHORT SPAN (TOP&BOTTOM)
12 0.888 52 3.7 170.85 SHORT SPAN(TOP&BOTTOM)
12 0.888 138 4.18 512.23 LONG SPAN(TOP&BOTTOM)
TOTAL 6,451.17 KG
TOTAL 32,144.53 KG
PROJECT: PROPOSED I-TOWER 3
OWNER: COMMUNITY SUITES REALTY DEVELOPMENT CORP.
SUBJECT: STRUCTURAL REQUIREMENTS FOR SUB STRUCTURE
PREPARED BY:
PREPARED BY:
B. SBR
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2 2.3 0.8 6.88 3.68
WALLS 6.3 6.25 0.25 78.75 9.84
TOP SLAB 0 0 0 0 0.00
C. EQT
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 21.655 1 0.8 36.248 17.32
WALLS 15.7 5.325 0.25 167.205 20.90
SUMPIT 0.9 0.9 0.4 1.44 0.32
TOP SLAB 21.655 1 0.15 21.655 3.25
D. CCT
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 3.5 5.4 0.8 14.24 15.12
WALLS 14.3 5.325 0.25 152.295 19.04
BAFFLE WALLS 8.4 3 0.1 51.9 2.52
SUMPIT 0.9 0.9 0.4 1.44 0.32
TOP SLAB 3.5 5.4 0.15 18.9 2.84
E.EFF
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2.95 1.75 0.8 6.12 4.13
WALLS 7.65 5.325 0.25 81.4725 10.18
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
F. SET
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 4.9 1.75 0.8 9.24 6.86
WALLS 7.65 5.325 0.25 81.4725 10.18
PARTITION 1 1.4 0.8 0.15 2.69 0.17
PARTITION 2 1.4 3.4 0.15 10.75 0.71
TOP SLAB 4.9 1.75 0.15 8.575 1.29
G. COAG TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 2.85 1.3 0.15 3.705 0.56
WALLS 2.95 1.35 0.25 7.965 1.00
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
G.FLO-1 TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 1.35 1.3 0.15 1.755 0.26
WALLS 2.15 2.85 0.25 12.255 1.53
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
H.FLO-2 TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 1.35 1.3 0.15 1.755 0.26
WALLS 2.15 2.85 0.25 12.255 1.53
SUMPIT 0 0 0 0 0.00
TOP SLAB 0 0 0 0 0.00
H.OTHERS
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
EFF-COAG SLAB 1.3 1.5 0.15 1.95 0.29
EFF-COAG WALL 1.3 2.15 0.15 6.43 0.42
OVER ALL TOP 0 0 0 0 0.00
I.FIRE TANK
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 37.1068 1 0.4 13.4992 14.84
WALLS 33.75 4.5 0.25 303.75 37.97
SUMPIT 0 0 0 0 0.00
TOP SLAB 37.1068 1 0.15 37.1068 5.57
J. CISTERN
STRUCTURE LENGTH WIDTH DEPTH AREA VOLUME
BOTTOM SLAB 13.7 5.675 0.2 7.75 15.55
WALLS 38.75 3.925 0.25 304.1875 38.02
SUMPIT 1.2 1.2 0.4 3.84 0.00
PEDESTAL 38.75 1.2 0.25 93 11.63
TOP SLAB 13.7 5.675 0.15 77.7475 11.66
K.TOTAL
FORMS CONCRETE
2,092.78 357.07
LOCATION: CISTERN
DIAMETER UNT.WT. QTY. LENGTH TOTAL WT. DESCRIPTION
20 2.466 388 5.538 5,298.80 VERTICAL BARS
12 0.888 38 6 202.46 HORIZONTAL BAR
12 0.888 38 3.7 124.85 HORIZONTAL BAR
12 0.888 76 5.18 349.59 HORIZONTAL BAR
12 0.888 38 1.8 60.74 HORIZONTAL BAR
12 0.888 38 6 202.46 HORIZONTAL BAR
12 0.888 38 4.3 145.10 HORIZONTAL BAR
12 0.888 38 2 67.49 HORIZONTAL BAR
12 0.888 162 0.8 115.08 CORNER BARS
10 0.616 236 1.7 247.14 CRANKED
10 0.616 50 3.4 104.72 SUMPIT CRANKED
10 0.616 25 1.85 28.49 SUMPIT STRAIGHT
10 0.616 50 2.2 67.76 SUMPIT CRANKED
10 0.616 50 0.6 18.48 SUMPIT DIAGONAL
10 0.616 78 1.85 88.89 SUMPIT HORIZONTAL
12 0.888 104 6 554.11 SHORT SPAN (TOP&BOTTOM)
12 0.888 52 3.7 170.85 SHORT SPAN(TOP&BOTTOM)
12 0.888 138 4.18 512.23 LONG SPAN(TOP&BOTTOM)
TOTAL 8,359.26 KG