Excessive cranking time before the engine starts (5-6 seconds) on a cold start or
after a hot soak.
In most cases, diagnosis shows fault code 2FBF as the only fault stored in the DME with
SES lamp illumination.
SITUATION II
The customer may complain of the following:
Diagnosis shows fault code 29DC (Cylinder injection cut-out, pressure too low in high-
pressure system) and/or 2FBF (Fuel pressure on-release injection, pressure too low), and in
some cases, also in conjunction with 29F1 (Fuel high-pressure, plausibility) and 29F2 (Fuel
high-pressure, fuel pressure undershot).
In some cases, misfire faults for various cylinders (e.g., FC 20D1, 29CF, 29D2, 29CE,
29D0, 29CC) are also stored in MSD80/MSD81.
CAUSE
Possible causes may include:
6. IMPORTANT:
When programming vehicles equipped with the MSD81 DME, make sure that the
DME control module is marked for programming in the measure plan (yellow
mark in the control module tree and a “P” symbol). If the DME is not marked, you
have to select it manually for programming in the control module tree (click on the
module and mark the “program” checkbox), and then determine the measures plan.
For E89 vehicles where the customer complains of “Long Cranking Time” and only
the fault code 2FBF is stored in the DME with the SES illuminated, proceed as
follows:
1. Install a calibrated manual fuel pressure gauge
(e.g., P/N 83 30 0 491 260 pressure gauge from
the K-L-Jetronic special tool kit P/N 83 30 0
491 259), connected with the three-way adapter
tool 135 270, into the low-pressure fuel supply
line as follows:
1. Use the current ISTA diagnosis software. Perform test module B1214_DI KDR
(Fuel Pressure Control).
3. Perform all applicable steps of the High-pressure Fuel test module B1214_DI KDR.
Pay attention to all questions being displayed during diagnosis and answer them
correctly. Important Note:
Important Note:
When comparing the measured fuel pressure with the engine running at idle speed,
make sure to let the fuel pressure stabilize for approximately 60 seconds prior to the
final reading. Otherwise, an implausible value (around 150 bars) is going to be
entered into the test, resulting in inaccurate diagnosis (defective high-pressure
pump).
4. After completion of all diagnostic steps, end the test module and enter the “fault
feedback” screen. Enter the result of a diagnosis process into the Diagnosis Code
dialog box and obtain a “Diagnostic Code”. In case no failure can be currently
detected in the high-pressure fuel system, enter the last option “No fault found” into
the dialog box.
In certain cases, the HDP fault may be reproduced only when the engine is under
load. In order to replicate the complaint, it may be necessary to road-test vehicle
with the manual fuel pressure gauge installed. The excessive low-pressure fuel
fluctuation (between 5.0 and 7.0 bars) would indicate incorrect operation of the fuel
delivery system.
Starting on November 1st, 2010, TC authorization is NOT required for the HDP
pump replacement. For details related to the “N54 Fuel System TC Action”, refer to
SI B13 08 09.
8. If the High-pressure Fuel Pump needs to be replaced, use the updated part P/N 13
51 7 613 933, which incorporates the latest improvements to internal sealing. For
the pump replacement procedure, refer to REP 13 51 017.
Note:
The repair instructions have been updated with the release of the special tool P/N 83
30 0 496 939. The special tool accommodates easy removal of the engine harness
block, located under the intake manifold. Consequently, the removal of the intake
manifold is no longer necessary when replacing the HDP on the N54 engine.
9. After replacement, clear the adaptation values of the high-pressure flow control
valve in the DME by selecting the path:
o Activities / Service Functions
o Drive
o Motor Electronics
o Adjustment Programs
o Delete Adaptations / variants, and then Test plan
o Reset adaptive values.
10. IMPORTANT NOTE:
In addition, vehicles which have had the HDP pump replaced have to be
reprogrammed afterwards with ISTA/P 2.40.2 (or higher). The target integration
levels should be:
IMPORTANT:
When programming vehicles equipped with the MSD81 DME, make sure that the
DME control module is marked for programming in the measure plan (yellow
mark in the control module tree and a “P” symbol). If the DME is not marked, you
have to select it manually for programming in the control module tree (click on the
module and mark the “program” checkbox), and then determine the measures plan.
After programming, the DME programmed number should be “7626000” or higher.
11. After programming, readapting the DME by means of a short test drive is
recommended:
o Bring the engine to the normal operating temperature.
o Drive the vehicle at a speed of between 50-60 mph and engine speeds of
2,000-3,000 rpm for approximately 3 minutes (use manual gear shifting, if
needed).
o Let the engine idle for approximately 5 minutes.
o If possible, to confirm repair effectiveness, let the vehicle sit overnight and
cold start it the next morning. Then let it idle for approximately 5 minutes.
PARTS INFORMATION
Part Number Description Quantity
13 51 7 613 933 HDP High-pressure Fuel Pump 1
13 53 7 582 770 ASA bolt M8x17.5 1
FOR SITUATION I (Long crank with FC 2FBF) corrected with programming (no
HDP replacement is required):
WARRANTY INFORMATION
Covered under the terms of the BMW New Vehicle Limited Warranty, or the Certified Pre-
Owned Program for all causes except a clogged fuel filter.
Defect 10 11 00 06 00
Code:
Labor Operation: Labor allowance to reprogram/recode vehicle
Refer To KSD2** Refer to KSD2
Additionally for
E89 (Z4)
Labor Operation: Labor Allowance:
WT (for the fuel pressure test, including installation of
13 99 000
the mechanical pressure gauge)
8 FRU
FOR SITUATION II (HDP replacement and where reprogramming may also be
required): Starting on November 1st, 2010, TC Part Replacement Authorization is
NOT required for the HDP pump replacement.
IMPORTANT:
As a commitment to our customers and to demonstrate confidence in our product, BMW
will extend the emissions warranty of the High-pressure Fuel Pump (HDP) of MY 2007,
MY 2008, MY 2009 and MY 2010 E60, E61, E90, E92, E93; MY 2008, MY 2009 and MY
2010 E82 and E88; MY 2009 and MY 2010 E89 and E71 vehicles equipped with the N54
engine from 4 years or 50,000 miles to 10 years or 120,000 miles, whichever comes first
(refer to SI B13 03 09).
The emissions warranty extension for this component applies to the above-listed models
only, and is transferable to any subsequent purchaser of these models. This extended
emissions warranty is applicable to vehicles registered in all 50 states. Warranty coverage
for all other parts is not affected. BMW will inform all affected owners of the above-listed
models of their extended High-pressure Fuel Pump warranty.
The following Warranty information should be used if High-pressure Fuel Pump (HDP)
replacement becomes necessary on MY 2007, MY 2008, MY 2009 or MY 2010 E90, E92,
E93, E60, E61, E82, E88, E89 or E71 vehicles equipped with N54 engines as outlined
above:
WARRANTY INFORMATION
Covered under the terms of the BMW New Vehicle Limited Warranty, or the 10 years /
120,000 mile BMW extended emissions warranty.
Defect
13 51 90 12 00
Code
Main Work
Diagnose and replace HDP pump. Delete DME fault
Labor Operation:
codes/adaption values.
00 58 272
Labor
Refer To KSD2**
Allowance:
+Associated
Work
Diagnose and replace HDP pump. Delete DME fault
Labor Operation:
codes/adaption values.
00 58 912
Labor
Refer To KSD2**
Allowance:
OR, if the reprogramming with ISTA/P 2.40.2 (or higher) after HDP replacement
is also required:
Main Work
Diagnose and replace HDP pump. Delete DME fault codes/adaption
Labor Operation:
values.
00 59 006 Reprogram vehicle including CAS
Labor Allowance: Refer To KSD2**
+Associated
Work
Diagnose and replace HDP pump.Delete DME fault codes/adaption
Labor Operation
values.
00 59 532 Reprogram vehicle including CAS.