0% found this document useful (0 votes)
50 views

Resource Tracking

Resource Tracking
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Resource Tracking

Resource Tracking
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

T.B.

AFLAJ 26-Aug-10 1

Activity Name Budgeted Actual Cost Budgeted Actual Budgeted Units / Unit of Price / Unit Start Finish Units 2010 2011
Cost Units Units Time Measure
May Jun Jul Aug Sep Oct Nov Dec Jan
AFLAJ RESOURCES SR1,993,144.00
SR1,234,700.00 --- --- 29-Jun-10 A 28-Dec-10 Budgeted --- --- --- --- --- --- ---
Actual --- --- ---
Carpenter SR173,808.00 SR48,416.00 1278 356 29-Jun-10 A 25-Nov-10 Budgeted 9 187 181 285 341 275
Actual 8 187 161
RC WALLS SR43,520.00 SR13,056.00 320 96 8/d SR17.00/h 17-Aug-10 A 22-Sep-10 Budgeted 119 201
Actual 96
PC SLOPE CONC SR5,440.00 SR0.00 40 0 4/d SR17.00/h 20-Sep-10 29-Sep-10 Budgeted 40
Actual
RC ROOF SLAB SR89,760.00 SR0.00 660 0 11/d SR17.00/h 27-Sep-10 25-Nov-10 Budgeted 44 341 275
Actual
Blinding concrete & Primer paint SR6,528.00 SR5,440.00 48 40 6/d SR17.00/h 29-Jun-10 A 08-Jul-10 A Budgeted 9 39
Actual 8 32
R.C Raft foundation SR28,560.00 SR29,920.00 210 220 7/d SR17.00/h 06-Jul-10 A 10-Aug-10 A Budgeted 148 62
Actual 155 65
Steel Fixer SR194,480.00 SR81,056.00 1430 596 06-Jul-10 A 25-Nov-10 Budgeted 316 252 245 341 275
Actual 352 244
RC WALLS SR43,520.00 SR13,056.00 320 96 8/d SR17.00/h 17-Aug-10 A 22-Sep-10 Budgeted 119 201
Actual 96
RC ROOF SLAB SR89,760.00 SR0.00 660 0 11/d SR17.00/h 27-Sep-10 25-Nov-10 Budgeted 44 341 275
Actual
R.C Raft foundation SR61,200.00 SR68,000.00 450 500 15/d SR17.00/h 06-Jul-10 A 10-Aug-10 A Budgeted 316 134
Actual 352 148
Unskilled labour SR142,656.00 SR48,768.00 1486 508 29-Jun-10 A 25-Nov-10 Budgeted 3 329 252 285 341 275
Actual 2 291 215
RC WALLS SR30,720.00 SR9,216.00 320 96 8/d SR12.00/h 17-Aug-10 A 22-Sep-10 Budgeted 119 201
Actual 96
PC SLOPE CONC SR3,840.00 SR0.00 40 0 4/d SR12.00/h 20-Sep-10 29-Sep-10 Budgeted 40
Actual
RC ROOF SLAB SR63,360.00 SR0.00 660 0 11/d SR12.00/h 27-Sep-10 25-Nov-10 Budgeted 44 341 275
Actual
Blinding concrete & Primer paint SR1,536.00 SR1,152.00 16 12 2/d SR12.00/h 29-Jun-10 A 08-Jul-10 A Budgeted 3 13
Actual 2 10
R.C Raft foundation SR43,200.00 SR38,400.00 450 400 15/d SR12.00/h 06-Jul-10 A 10-Aug-10 A Budgeted 316 134
Actual 281 119
Labour of water proofing Subcontractor
SR23,400.00 SR0.00 195 0 24-Nov-10 28-Dec-10 Budgeted 42 153
Actual
EPOXY+BIT PNT SR21,600.00 SR0.00 180 0 6/d SR15.00/h 24-Nov-10 23-Dec-10 Budgeted 42 138
Actual
TEST SR1,800.00 SR0.00 15 0 3/d SR15.00/h 24-Dec-10 28-Dec-10 Budgeted 15
Actual
Materials SR1,458,800.00
SR1,056,460.00 --- --- 29-Jun-10 A 23-Dec-10 Budgeted --- --- --- --- --- --- ---
Actual --- --- ---
Renforce Concrete SRC SR577,300.00 SR414,460.00 2510 1802 06-Jul-10 A 25-Nov-10 Budgeted 949 527 269 424 342
Actual 1196 606
RC WALLS SR78,200.00 SR23,460.00 340 102 9/d cubic meterSR230.00/M317-Aug-10 A 22-Sep-10 Budgeted 126 214
Actual 102
RC ROOF SLAB SR188,600.00 SR0.00 820 0 14/d cubic meterSR230.00/M327-Sep-10 25-Nov-10 Budgeted 55 424 342
Actual
R.C Raft foundation SR310,500.00 SR391,000.00 1350 1700 45/d cubic meterSR230.00/M306-Jul-10 A 10-Aug-10 A Budgeted 949 401
Actual 1196 504
Normal Concrete SRC SR108,000.00 SR40,000.00 540 200 29-Jun-10 A 29-Sep-10 Budgeted 52 218 270
Actual 38 162

Date Revision Checked Approved


26-Aug-10 Rev 1 Preared by:Panning & cost Dpt
checked by : Engr Nabeel
T.B.AFLAJ 26-Aug-10 2

Activity Name Budgeted Actual Cost Budgeted Actual Budgeted Units / Unit of Price / Unit Start Finish Units 2010 2011
Cost Units Units Time Measure
May Jun Jul Aug Sep Oct Nov Dec Jan
PC SLOPE CONC SR54,000.00 SR0.00 270 0 27/d cubic meterSR200.00/M320-Sep-10 29-Sep-10 Budgeted 270
Actual
Blinding concrete & Primer paint SR54,000.00 SR40,000.00 270 200 34/d cubic meterSR200.00/M329-Jun-10 A 08-Jul-10 A Budgeted 52 218
Actual 38 162
Reinforcement Steel SR728,000.00 SR602,000.00 260 215 06-Jul-10 A 25-Nov-10 Budgeted 77 51 38 52 42
Actual 141 74
RC WALLS SR140,000.00 SR42,000.00 50 15 1/d Ton SR2,800.00/Ton
17-Aug-10 A 22-Sep-10 Budgeted 19 31
Actual 15
RC ROOF SLAB SR280,000.00 SR0.00 100 0 2/d Ton SR2,800.00/Ton
27-Sep-10 25-Nov-10 Budgeted 7 52 42
Actual
R.C Raft foundation SR308,000.00 SR560,000.00 110 200 4/d Ton SR2,800.00/Ton
06-Jul-10 A 10-Aug-10 A Budgeted 77 33
Actual 141 59
Epoxy for water tank SR45,500.00 SR0.00 1300 0 24-Nov-10 23-Dec-10 Budgeted 303 997
Actual
EPOXY+BIT PNT SR45,500.00 SR0.00 1300 0 43/d m2 SR35.00/M2 24-Nov-10 23-Dec-10 Budgeted 303 997
Actual

Date Revision Checked Approved


26-Aug-10 Rev 1 Preared by:Panning & cost Dpt
checked by : Engr Nabeel