0% found this document useful (0 votes)
83 views1 page

Resource Managment

Resource Managment
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views1 page

Resource Managment

Resource Managment
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

T.B.

AFLAJ 26-Jun-10 1

Resource Name Budgeted Budgeted Cost Activity ID Activity Name WBS Name Budgeted Resource Price / Unit Start Finish Budgeted Units 2010 2
Units Units / Time Type Jan
May Jun Jul Aug Sep Oct Nov Dec
AFLAJ RESOURCES --- SR1,993,144.00 26-Jun-10 11-Dec-10 --- --- --- --- --- --- ---

Carpenter 1278 SR173,808.00 26-Jun-10 08-Nov-10 30 211 297 311 341 88

Carpenter 320 SR43,520.00 5.1.A RC WALLS CONSTRUCTION 8/d Labor SR17.00/h 28-Jul-10 05-Sep-10 32 248 40

Carpenter 40 SR5,440.00 5.1.B PC SLOPE CONC CONSTRUCTION 4/d Labor SR17.00/h 03-Sep-10 12-Sep-10 40

Carpenter 660 SR89,760.00 5.1.C RC ROOF SLAB CONSTRUCTION 11/d Labor SR17.00/h 10-Sep-10 08-Nov-10 231 341 88

Carpenter 48 SR6,528.00 5.1.A10 Blinding concrete & Primer paint CONSTRUCTION 6/d Labor SR17.00/h 26-Jun-10 04-Jul-10 30 18

Carpenter 210 SR28,560.00 5.1.A20 R.C Raft foundation CONSTRUCTION 7/d Labor SR17.00/h 05-Jul-10 08-Aug-10 161 49

Steel Fixer 1430 SR194,480.00 05-Jul-10 08-Nov-10 377 353 271 341 88

Steel Fixer 320 SR43,520.00 5.1.A RC WALLS CONSTRUCTION 8/d Labor SR17.00/h 28-Jul-10 05-Sep-10 32 248 40

Steel Fixer 660 SR89,760.00 5.1.C RC ROOF SLAB CONSTRUCTION 11/d Labor SR17.00/h 10-Sep-10 08-Nov-10 231 341 88

Steel Fixer 450 SR61,200.00 5.1.A20 R.C Raft foundation CONSTRUCTION 15/d Labor SR17.00/h 05-Jul-10 08-Aug-10 345 105

Unskilled labour 1486 SR142,656.00 26-Jun-10 08-Nov-10 10 383 353 311 341 88

Unskilled labour 320 SR30,720.00 5.1.A RC WALLS CONSTRUCTION 8/d Labor SR12.00/h 28-Jul-10 05-Sep-10 32 248 40

Unskilled labour 40 SR3,840.00 5.1.B PC SLOPE CONC CONSTRUCTION 4/d Labor SR12.00/h 03-Sep-10 12-Sep-10 40

Unskilled labour 660 SR63,360.00 5.1.C RC ROOF SLAB CONSTRUCTION 11/d Labor SR12.00/h 10-Sep-10 08-Nov-10 231 341 88

Unskilled labour 16 SR1,536.00 5.1.A10 Blinding concrete & Primer paint CONSTRUCTION 2/d Labor SR12.00/h 26-Jun-10 04-Jul-10 10 6

Unskilled labour 450 SR43,200.00 5.1.A20 R.C Raft foundation CONSTRUCTION 15/d Labor SR12.00/h 05-Jul-10 08-Aug-10 345 105

Labour of water proofing Subcontractor


195 SR23,400.00 07-Nov-10 11-Dec-10 144 51

Labour of water proofing Subcontractor 180 SR21,600.00 5.1.D EPOXY+BIT PNT CONSTRUCTION 6/d Labor SR15.00/h 07-Nov-10 06-Dec-10 144 36

Labour of water proofing Subcontractor 15 SR1,800.00 5.1.E TEST CONSTRUCTION 3/d Labor SR15.00/h 07-Dec-10 11-Dec-10 15

Materials --- SR1,458,800.00 26-Jun-10 06-Dec-10 --- --- --- --- --- --- ---

Renforce Concrete SRC 2510 SR577,300.00 05-Jul-10 08-Nov-10 1069 579 329 424 109

Renforce Concrete SRC 1350 SR310,500.00 5.1.A20 R.C Raft foundation CONSTRUCTION 45/d Material SR230.00/M3 05-Jul-10 08-Aug-10 1035 315

Renforce Concrete SRC 340 SR78,200.00 5.1.A RC WALLS CONSTRUCTION 9/d Material SR230.00/M3 28-Jul-10 05-Sep-10 34 264 43

Renforce Concrete SRC 820 SR188,600.00 5.1.C RC ROOF SLAB CONSTRUCTION 14/d Material SR230.00/M3 10-Sep-10 08-Nov-10 287 424 109

Normal Concrete SRC 540 SR108,000.00 26-Jun-10 12-Sep-10 169 101 270

Normal Concrete SRC 270 SR54,000.00 5.1.A10 Blinding concrete & Primer paint CONSTRUCTION 34/d Material SR200.00/M3 26-Jun-10 04-Jul-10 169 101

Normal Concrete SRC 270 SR54,000.00 5.1.B PC SLOPE CONC CONSTRUCTION 27/d Material SR200.00/M3 03-Sep-10 12-Sep-10 270

Reinforcement Steel 260 SR728,000.00 05-Jul-10 08-Nov-10 89 64 41 52 13

Reinforcement Steel 110 SR308,000.00 5.1.A20 R.C Raft foundation CONSTRUCTION 4/d Material SR2,800.00/Ton 05-Jul-10 08-Aug-10 84 26

Reinforcement Steel 50 SR140,000.00 5.1.A RC WALLS CONSTRUCTION 1/d Material SR2,800.00/Ton 28-Jul-10 05-Sep-10 5 39 6

Reinforcement Steel 100 SR280,000.00 5.1.C RC ROOF SLAB CONSTRUCTION 2/d Material SR2,800.00/Ton 10-Sep-10 08-Nov-10 35 52 13

Epoxy for water tank 1300 SR45,500.00 07-Nov-10 06-Dec-10 1040 260

Epoxy for water tank 1300 SR45,500.00 5.1.D EPOXY+BIT PNT CONSTRUCTION 43/d Material SR35.00/M2 07-Nov-10 06-Dec-10 1040 260

Date Revision Checked Approved


26-Aug-10 Rev 1 Preared by:Panning & cost Dpt
checked by : Engr Nabeel