NPTI Publications PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

,u ih Vh vkbZ

TRAINING & ACADEMIC CALENDER 2012-2013


izkoh.;a ijksio`fr'p

NPTI PUBLICATIONS

S.No. Title Price(Rs) Price


(US$)
A) THERMAL POWER PLANT
1 Power Plant Familirisation (Vol.I) 400 30
2 Power Plant Familirisation (Vol.II) 600 40
3 Power Plant Familirisation (Vol.III) 425 30
4 Power Plant Familirisation (Vol.IV) 400 30
5 Power Plant Operation 600 40
6 Thermal Power Plant Metallurgy 175 15
7 Ash Handling System 250 15
8 Fuel Handling System Operation ( Hindi) 250 15
9 Schematic Diagram ( 210 MW Thermal) 350 20
10 Fuel Handling System Operation 250 15
11 Environmental Mangement in Thermal Power Station 600 40
12 Thermal Power Plant Performance and Efficiency Monitoring 425 30
13 Thermal Power Plant Chemistry 350 20
14 500 MW Fossil Fuel Power Plant Simulator Operating Procedures 550 40
15 Atomspheric F B C Boilers 250 15
16 Boiler Feed Pump Design, Construction & Operation 250 15
17 Circulating F B C Technology 250 15
18 Power Station Safety 350 20
19 Safety in Power Station ( Hindi ) 200 15
20 210 MW Thermal Schematic Diagrams
( Combustion Engineering Boiler & KWU Turbine 200 15
21 HP - LP Bypass System 350 20
22 Pulverisers and Feeder 200 15
23 Pulverised Fuel Fired Boilers 350 20
24 KWU Steam Turbine Governing and Protection System 425 30
25 210 MW Turbo generator Operation and Stability 200 15
26 Lubrication System for Power Station 300 20
27 210 MW Simulator Training 550 40

96
TRAINING & ACADEMIC CALENDER 2012-2013

28 Steam Turbine for Power Generation 650 45


29 Vibration 200 15
B) HYDRO POWER PLANT
30 Hydro Power Plant Familiarisation 400 30
31 Hydro Power 2000: An Indian Persective 1000 60
32 Sitting Problems in Hydro Power Plants & Their Possible Solutions 495 35
33 Up - rating and Refurbishment of hydro Power Plants 495 35
34 Hydro Environment Interface 950 60
35 Small Hydro 595 40
C) COMBINED CYCLE GAS TURBINE POWER PLANT
36 Gas Turbine and Combined Cycle Power Plant 400 30
D) CONTROLS and INSTRUMENTATION
37 Controls & Instrumentation (Vol. I) 600 40
38 Controls & Instrumentation (Vol. II) 425 30
39 Controls & Instrumentation (Vol. III) 350 20
40 Data Acquisition System & Distributed Digital Control 250 15
41 Condition Monitoring of Power Transformers 250 15
42 Programable Logic Controller & Fuzzy Logic Controller and
their Applications in Instrumentation 250 15
43 Control Valves Selection and Siziling 300 20
44 Programable Logic Controls 350 20
E) REGULATORY ISSUES
45 Journal on ERC Orders-2nd Edition 595 40
F) MAINTENANCE MANUALS
46 Motor Maintenance 200 15
47 Battery Maintenance 250 15
48 Battery Maintenance (Hindi) 250 15
49 Valve Maintenance 350 20
50 Pump Maintenance 400 30
51 Pump Anurakshan (Hindi) 350 20
52 Relay Maintenance 200 15
53 Maintenance Planning & Cost Control 250 15
54 Maintenance of Power Transformers 350 20
97
,u ih Vh vkbZ
TRAINING & ACADEMIC CALENDER 2012-2013
izkoh.;a ijksio`fr'p

G) POWER PLANT AUXILIARIES


55 Fan & Heater 425 30
56 Fan & Heater (Hindi) 425 30
57 Compressor & Compressed Air 200 15
58 Valves 400 30
59 Power Station Pump 350 20
H) POWER SYSTEMS MANUALS
60 Electrical Protection System 350 20
61 Power System Studies and Load Dispatch 350 20
62 Emerging Trends in Power Distribution by Birinchi 595 40
63 Power Transmission & Distribution 495 35
64 Load Management in Power Sector 400 30
65 Static Excitation System 250 15
66 Energising Your Power Utility 395 30
I) SUB STATION MANUALS
67 O&M of EHV Sub-Station Vol. I 250 15
68 O&M of EHV Sub-Station Vol. II 200 15
J) RENEWABLE ENERGY SOURCES
69 Renewable Energy 595 40
70 Non Conventional Power Plant 350 20
K) ENERGY AUDIT MANUAL
71 Energy Conversation and Management 250 15
72 Energy Audit and DSM in Power Utilities 400 30
L) OTHER MANUALS
73 Computer Ka Aadharbhoot Gyan (Hindi) 250 15
74 National Training Policy for the Power Sector 200 15
75 Rashtirya Prashikshan Neeti (Hindi) 200 15
76 Environment Pollution & Pollution Control 250 15

01 Packing and forwarding charges r50/- per book payable extra.


02 Special Offer - The rebate of 10% will be given for the book purchased for library.
03 The payment may be made through Demand Draft in favour of "National Power
Training Institute" payable at Faridabad.

98

You might also like