This inspection checklist is for silos 36 and 37 at the Grain Terminal expansion project in Aqaba, Jordan. The inspection covers rebar placement and checks that the rebar meets specifications based on approved drawings. Items like spacing, bending, overlaps, and securement are checked. Upon completion, the contractor's quality control engineer must accept the work before it can be approved by the employer's representative.

Uploaded by

EbrahimAbuZaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
3K views1 page

Check List For Rebar & Formwork

This inspection checklist is for silos 36 and 37 at the Grain Terminal expansion project in Aqaba, Jordan. The inspection covers rebar placement and checks that the rebar meets specifications based on approved drawings. Items like spacing, bending, overlaps, and securement are checked. Upon completion, the contractor's quality control engineer must accept the work before it can be approved by the employer's representative.

Uploaded by

EbrahimAbuZaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

AQABA NEW PORT PROJECT-Package2, Grain Terminal Expansion

INSPECTION CHECK LIST


Request From: WIR Ref. No.: GT2-WIR-C-0123
Inspection Date: 30-Jun-18 Inspection Time: Site: Grain Terminal
ITP No.: Drawing No.:
Inspection Details:
Structure Name: Slipform Location: SILOS No. 36&37
Status of Inspection: Perform Witness Hold Random Inspection Review

Sl.No Item Checked PASS FAIL comments


I. REBAR CHECK
1 steel are placed as per approved drawing
2 steel rebars are straight
3 steel rebars are rust ,crack and oil free
4 spacing of rebar
5 Bar bending & rebar overlap as per approved drawing
6 number. and dimension of rebar
7 Clearance of rebar satisfactory & concrete spacers check (adequate)
8 Location, dimension & elevation of embedded items, anchor bolts
9 Rebar tied properly
10 Cleaning

Repetition of Inspection
No. Repetition Date Time Items to be inspected Requested by Contractor

Comments for inspection (If any) :

Construction (Name, Date & Signature) Rejected


Accepted
Survey (If required) (Name, Date & Signature) Rejecte
Accepted
d
Electrical(If required) (Name, Date & Signature) Rejecte
Accepted
d
Mechanical(If required) (Name, Date & Signature) Rejecte
Accepted
d
CONFIRMATION OF CONTRACTOR'S CC -QC ENGINEER
Inspected by Contractor CC -QC Engineer

The Works are : Rejected


Accepted

Name, Signature & Date of QC Engineer


If Rejected by Contractor, it shall not be forwarded to ER for inspection until corrected.

EMPLOYER REPRESENTATIVE APPROVAL


Comments

Finally the works are: Accepted Rejected

Name, Signature & Date of ER responsible Engineer.