0% found this document useful (0 votes)
56 views2 pages

CV 5

This document provides work experience details for an individual from April 1977 to July 1991. It lists 6 positions held with various companies working on industrial construction projects in locations like West Java, Aceh, and Bali. For each position, it specifies the employer, dates of employment, job location, roles performed like welding various pipe sizes of materials like carbon steel and stainless steel in positions like uphill and downhill to codes like ASME and AWS. It also lists managers and supervisors for quality control roles.

Uploaded by

Bayu Jatmiko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views2 pages

CV 5

This document provides work experience details for an individual from April 1977 to July 1991. It lists 6 positions held with various companies working on industrial construction projects in locations like West Java, Aceh, and Bali. For each position, it specifies the employer, dates of employment, job location, roles performed like welding various pipe sizes of materials like carbon steel and stainless steel in positions like uphill and downhill to codes like ASME and AWS. It also lists managers and supervisors for quality control roles.

Uploaded by

Bayu Jatmiko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

13.

R M I PT CV 5 OF 6
APRIL 01, 1977 TO AUGUST 01,1977
LOCATION : GUNUNG SALAK, SUKABUMI WEST JAVA
JOB : GEOTHERMAL PLANT UNOCAL PROJECT.
CERTIFIED : NPS Ǿ 2” SS GTAW / SMAW UP HILL ASME IX (MIGAS)
SUV/QC/
MANAGER : FIRDAUS. MR MORRIS. A.RAHMAN YASIN TUANAYA.

14. TRUBA JURONG ENGINEERING PT.


JULY 15, 1996 TO DESEMBER 31,1996
LOCATION : KARAWANG WEST JAVA.
JOB : TEXMACO PTA PLANT PROJECT
CERTIFIED : 1. NPS Ǿ 2” CS. GTAW / SMAW UP HILL (6G) ASME IX
2. NPS Ǿ 2” SS . GTAW UP HILL (6G) ASME IX
3. NPS Ǿ 6” TITANIUM GTAW UP HILL (6G) ASME IX
SUV/QC/WE/
MANAGER : JOKO PRAYITNO./ BUDI CAHYADI./ SAMUEL DORGIS
TOTO PRATAMA KUMA

15. TRUBA JURONG ENGINEERING PT.


JULY 21,1995 TO JULY 1O, 1996
LOCATION : KARAWANG WEST JAVA
JOB : TEXMACO POLYESTER PLANT PROJECT
BOILER ,TURBINE,PIPING.
CERTIFIED : 1. NPS Ǿ 2” CS GTAW UPHILL (6G) ASME IX
2. NPS Ǿ 2” SS GTAW UP HILL(6G) ASME IX
SUV/QC/WE/
MANAGER : JOKO PRATITNO./ SUMAMORA PURWANTORO

16. TRUBA JURONG ENGINEERING PT.


APRIL 08, 1994 TO JUNE 17, 1995
LOCATION : ARUN LOCH SEUMAWE NORT ACEH - ACEH.
JOB ; MOBIL OIL BOOSTER COMPRESSION PROJECT
CERTIFIED : 1. NPS Ǿ 6” CS GTAW /SMAW UP HILL (6G) ASME IX
(MIGAS)
2. NPS Ǿ 6” SS GTAW /SMAW UP HILL(6G) ASME IX
3. NPS Ǿ 6” SS TP410 GTAW /SMAW UPHILL(6G) ASME IX
SUV/QC/WE/
MANAGER : JOKO PRAYITNO./IMAM EDY SUYONO /SAMUEL DORGIS
JONATHAN BADOY

17 PETROSEA PT
JULY 04,1991 TO NOV 12 , 1993
LOCATION : PAGERUNGAN ISLAND /BALI NORTH - EAS JAVA.
JOB : RCO/ ARBNI PLANT PROJECT. TRAIN A ,TRAIN B,
OIL/GAS TANK
PIPE SPOOL ,PIPE LINE,CASING RIG –WELL SIDE A &
WELL SIDE B
CERTIFIED :1 NPS Ǿ 8” CS SMAW UP HILL (6G) AWS D. 1.1 ( M I G A S )
2 NPS Ǿ 6” CS SMAW DOWN HILL (6G) API 1104 (M I G A S )
3. NPS Ǿ 8” CS GTAW / SMAW UP HILL (6G) ASME IX
4. NPS Ǿ 2” CS GTAW UP HILL (6G) ASME IX
5. NPS Ǿ 2” SS GTAW UP HILL (6G) ASME IX
6. PLATE T12 MM CS FCAW HORIZONTAL (2G) ASME IX
7. PLATE T12 MM CS FCAW UP HILL (5G) ASME IX
8. MIG CO2 ( W I R E F E E D E R )
9. G O U G I N G NON COMPRESSOR AA GRICON 53
10. WELDING HV 1200 / HV 800
SUV/QC/WE/
MANAGER : SABNIL. / MR. BILL ROMORO, MR JOHN MC. LEAN/
MR. TONY MASSON.

You might also like