(Continuous or Shoot Mode) ? Certain Value System Is Ready
The document outlines the steps for preparing a steam sterilization system and running a sterilization cycle. It describes checking the water pressure and level, activating the steam generator if conditions are met, and verifying the system is ready if the start button is pressed. It then details the various phases of the sterilization cycle including sealing, purging, charging, sterilizing, exhausting, drying, and completing. It also lists the actions of different valves during each phase of the cycle.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
36 views2 pages
(Continuous or Shoot Mode) ? Certain Value System Is Ready
The document outlines the steps for preparing a steam sterilization system and running a sterilization cycle. It describes checking the water pressure and level, activating the steam generator if conditions are met, and verifying the system is ready if the start button is pressed. It then details the various phases of the sterilization cycle including sealing, purging, charging, sterilizing, exhausting, drying, and completing. It also lists the actions of different valves during each phase of the cycle.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
**Preparing the System:
If water pressure is low then give an alarm.
If water pressure is ok and water level is low then activate water pump till water level is ok. (Continuous or Shoot Mode)? When water level is ok and Steam Generator Pressure and Temperature is below Certain Value then activate steam generator. Once Pressure and Temperature are OK then activate bit System Is Ready. ** If start is pressed: A. If system is ready then: 1. If either door is not closed then close both doors. 2. When door is closed activate begin bit. B. If begin bit is active: I. If pressure switch is inactive (p< 10 psi); Activate Seal Phase. II. If pressure switch is active (p>=10 psi); wait 5 sec and activate purge phase. III. If purge phase is active wait for a Period then activate Charge Phase. IV. If chamber Pressure and Temperature is within range then activate Sterilization Phase. V. If sterilization period is complete then activate fast exhaust phase. VI. If pressure is less than 4psig then activate Vacuum Dry Phase. VII. If pressure is less than (25-28) INHG vacuum then start Air Break Phase. VIII. If pressure is more than 2 INHG then activate Retract Seal Phase IX. When pressure switch open wait 18 seconds then activate Complete Phase. C. When pressure is atm then activate bit Cycle Complete. **Valve action: S1: Air Break, Retract Seal. S2: Purge, Charge, Sterilization. S3: Purge, Fast Exhaust, Vacuum Dry. S4: Purge, Fast Exhaust. S7: S9: S35: Shoot for 1.5 sec in Activate Seal, rest of Activate Seal, Purge, Charge, Sterilize, Fast Exhaust, Vacuum Dry, Air Break. S37: 1.5 sec in activate Seal, Retract Seal, Complete.