0% found this document useful (0 votes)
96 views13 pages

7A.Protest Software Presentation MACROS-2

This document discusses macros and testing procedures for protective relays using DOBLE engineering software. It describes the LRAMPI, LRAMPV, and LRAMPF macros which can be used for pickup and dropout testing of current, voltage, and frequency relays. It also details the TIMEI, TIMEV, and TIMEF macros for definite time testing and provides an example of setting up a test using the ACTION macro to generate a current ramp and measure the operating time of a relay.

Uploaded by

madhan_22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views13 pages

7A.Protest Software Presentation MACROS-2

This document discusses macros and testing procedures for protective relays using DOBLE engineering software. It describes the LRAMPI, LRAMPV, and LRAMPF macros which can be used for pickup and dropout testing of current, voltage, and frequency relays. It also details the TIMEI, TIMEV, and TIMEF macros for definite time testing and provides an example of setting up a test using the ACTION macro to generate a current ramp and measure the operating time of a relay.

Uploaded by

madhan_22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Knowledge Is Power SM

Apparatus Maintenance and Power Management


for Energy Delivery

ProTesT: LRAMPI & TIMEI Macros

Kamin Dave
Application Engineer (Protective Relaying)
DOBLE ENGINEERING COMPANY
Macros:
¾ LRAMPI: Linear RAMP, current
¾ LRAMPV: Linear RAMP, voltage
¾ LRAMPF: Liner RAMP, frequency

¾ Application: Pickup & dropout test for current, voltage &


frequency relays

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
RELAY SETTING:
¾ Relay setting:
¾ I> = 0.2A
¾ t> = 45ms

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action Details:
¾ Offset current: 0.06A
¾ Offset duration: 10 cycles
¾ Delta current: 0.01A
¾ Delta Time: 10 cycles
¾ Current limit: 0.25A

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action:

Delta Time should me more


Than relay operating time

0.25A

0.06A

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
RAMP: GRAPH

E = 0.25A

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Test:

Ampl: ACTION

Source: I1

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Macros:
¾ TIMEI: Time test, current
¾ TIMEV: Time test, voltage
¾ TIMEF: Time test, frequency

¾ Application: Definite time test for current, voltage &


frequency relays

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action Details:
¾ Offset current: 0.06A
¾ Offset duration: 10 cycles
¾ Test current: 1.02A
¾ Maximum on Time: 10 cycles

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action:

0.2*5 = 1A

1.02A

0.06A

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action Graph:

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
Action Details:

Ampl: ACTION

Operating time: 26.20 mSec

Source: I1

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery
DOBLE ENGINEERING PVT. LTD
305-SAKAR, OLD PADRA ROAD,
VADODARA.
PH: (+91)(265) 655 77 15 & Fax: (+91)(265) 235 62 85
Cell: (+91) 94267 47545
E-MAIL: [email protected]
[email protected]
Website: www.doble.com

Knowledge Is Power SM
Apparatus Maintenance and Power Management
for Energy Delivery

You might also like