Check List For Inspection Before Approval To Concrete or Pouring of Concrete

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Name of the Work: Four Laning of Hyderabad – Bangalore Section

Km: 336.000 to km: 376.000 of NH-7 Package-ADB-II/C-13

NATIONAL HIGHWAYS AUTHORITY OF INDIA


Package C-13

Consultant: Scetauroute S.A France & Nice Pvt. Ltd (JV)


Contractor: Continental Engineering Corporation

CHECK LIST FOR INSPECTION BEFORE APPROVAL TO CONCRETE /


POURING OF CONCRETE

Activity Details:

Date : Time : Item No. :


Chainage : Side/Lane : Layer :
Length : Width : Thickness :

Sl. Checked by Confirmed by


No Description Engineer/
Contractor
Consultant
1 Method statement approved
Batching Plant mixers in working order. (Separate
2
dispenser for admixture, if required, available)
Water, sand, coarse aggregate, cement, admixture
3
approved, storage of aggregate and cement
Water, sand, coarse aggregate, admixture, cement
4
stock sufficient
Concrete conveying arrangement (including transit
5 mixers) available in working condition and of sufficient
capacity
6 Form work / Scaffolding approved
7 Reinforcement approved
8 Pre-Stressing sheathing approved
Concrete gang present, including carpenter, steel
9
fixer, mechanics and electricians
10 Access like walkways are provided
11 Safety arrangements adequate
12 Lighting provided
Name of the Work: Four Laning of Hyderabad – Bangalore Section
Km: 336.000 to km: 376.000 of NH-7 Package-ADB-II/C-13

13 Curing arrangements made / Laboratory notified


a) Check whether the concrete is not segregated
during pour. The height of dropping is
14 controlled. It should not exceed 2 – 3 m.
b) Check whether the concrete is poured in layers
of about 300mm
a) check that the vibrator is applied systematically
15 to compact uniformly and adequately
b) Avoid over vibration
16 Cold joints are not allowed to be developed
The forms are not displaced or deformed during the
17
concrete pour and vibration
The concrete is poured within the allowable time limits
18
from the time of batching
19 Concrete cubes will be taken as required

Status : Approved [ ] Not Approved and resubmit check list [ ]

Note : ‘√ ’ for compliance ‘X’ for non-compliance

For the Contractor For the Consultant