BOQ Site Devpt.
BOQ Site Devpt.
BOQ Site Devpt.
Page 1 of 15
Material Labor Equipment
ITEM ITEM / DESCRIPTION UNIT QTY AMOUNT
Unit/Cost Total Unit/Cost Total Unit/Cost Total
6.0 LINTEL BEAM (LB1 up to LB4)
Form Works 50 sqm 350.00 17,500.00 120.00 6,000.00 30.00 1,500.00 25,000.00
Rebar Works 3,072 kgs 45.00 138,240.00 8.00 24,576.00 2.00 6,144.00 168,960.00
GI tie wire #16 78 kgs 45.00 3,510.00 8.00 624.00 2.00 156.00 4,290.00
Concrete Works (3,000psi @ 28days) 21 cum 4,200.00 88,200.00 900.00 18,900.00 300.00 6,300.00 113,400.00
IV. CONTRACTORS TAX (12% of sum for Direct, Indirect & Contractors Profit) 988,484.53
Prepared by : 349,000.00
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 2 of 15
Project : San Fernando Substation Site Development Works
Subject : Itemized Cost Breakdown
Location : San Fernando Substation, Cebu
Date : July 15, 2017
Duration : 90 Calendar Days
Page 3 of 15
Material Labor Equipment
ITEM ITEM / DESCRIPTION UNIT QTY AMOUNT
Unit/Cost Total Unit/Cost Total Unit/Cost Total
6.0 LINTEL BEAM (LB1 up to LB4)
Form Works 50 sqm 300.00 15,000.00 100.00 5,000.00 10.00 500.00 20,500.00
Rebar Works 3,072 kgs 37.00 113,664.00 6.00 18,432.00 2.00 6,144.00 138,240.00
GI tie wire #16 78 kgs 37.00 2,886.00 6.00 468.00 2.00 156.00 3,510.00
Concrete Works (3,000psi @ 28days) 21 cum 3,900.00 81,900.00 800.00 16,800.00 200.00 4,200.00 102,900.00
IV. CONTRACTORS TAX (12% of sum for Direct, Indirect & Contractors Profit) 769,821.43
Prepared by : 349,000.00
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 4 of 15
Project : San Fernando Substation Site Development Works
Subject : Work Accomplishment Report
Location : San Fernando Substation, Cebu
Date as of : Oct. 14, 2017
Duration : 90 Calendar Days
Page 5 of 15
Previous This Period To date
ITEM ITEM / DESCRIPTION Wt%
% accom wt % % accom wt % % accom wt %
Prepared by : Noted :
Page 6 of 15
Project : San Fernando Substation Site Development Works
Subject : Work Accomplishment Report
Location : San Fernando Substation, Cebu
Date as of : Dec. 14, 2017
Page 7 of 15
Previous This Period To date
ITEM ITEM / DESCRIPTION Wt%
% accom wt % % accom wt % % accom wt %
8.0 STEEL WORKS
Steel Gate in automotive paint finish 4.80% 90% 4.32% 10% 0.48% 100% 4.80%
Steel Man Gate in automotive paint finish 0.27% 90% 0.24% 10% 0.03% 100% 0.27%
Electric motor for gate opener @ main gate only 1.58% 80% 1.26% 20% 0.32% 100% 1.58%
Manual / Mechanical device for gate opener @ main gate only 1.01% 80% 0.81% 20% 0.20% 100% 1.01%
2"x6" Rectangular Tube Louver Fence in paint finish 3.49% 60% 2.09% 40% 1.40% 100% 3.49%
Prepared by :
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 8 of 15
Project : Addendum Works - San Fernando Substation Site Development Works
Subject : Itemized Cost Breakdown
Location : San Fernando Substation, Cebu
Date : Aug 31, 2017
Duration : 45 Calendar Days
3.0 FOOTING - F1
Excavation 1.5 cum 100.00 150.00 300.00 450.00 600.00
Back Filling & Compaction 1 cum 120.00 120.00 250.00 250.00 370.00
Rebar Works 17 kgs 37.00 629.00 6.00 102.00 2.00 34.00 765.00
GI tie wire #16 0.5 kgs 37.00 18.50 6.00 3.00 2.00 1.00 22.50
Concrete Works (3,000psi @ 28days) 0.5 cum 3,900.00 1,950.00 800.00 400.00 200.00 100.00 2,450.00
Gravel Bedding 0.2 cum 1,350.00 270.00 120.00 24.00 250.00 50.00 344.00
Page 9 of 15
Material Labor Equipment
ITEM ITEM / DESCRIPTION UNIT QTY AMOUNT
Unit/Cost Total Unit/Cost Total Unit/Cost Total
GI tie wire #16 4 kgs 37.00 148.00 6.00 24.00 2.00 8.00 180.00
Plastering Works 90 sqm 180.00 16,200.00 100.00 9,000.00 10.00 900.00 26,100.00
Painting Works 90 sqm 200.00 18,000.00 90.00 8,100.00 10.00 900.00 27,000.00
IV. CONTRACTORS TAX (12% of sum for Direct, Indirect & Contractors Profit) 158,780.36
Prepared by : 349,000.00
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 10 of 15
Project : Addendum Works - San Fernando Substation Site Development Works
Subject : Work Accomplishment Report
Location : San Fernando Substation, Cebu
Date : Dec. 1, 2017
3.0 FOOTING - F1
Excavation 0.05% 0.00% 100% 0.05% 100% 0.05%
Back Filling & Compaction 0.03% 0.00% 100% 0.03% 100% 0.03%
Rebar Works 0.06% 0.00% 100% 0.06% 100% 0.06%
GI tie wire #16 0.00% 0.00% 100% 0.00% 100% 0.00%
Concrete Works (3,000psi @ 28days) 0.20% 0.00% 100% 0.20% 100% 0.20%
Gravel Bedding 0.03% 0.00% 100% 0.03% 100% 0.03%
Page 11 of 15
Previous This Period To date
ITEM DESCRIPTION Wt%
% accom wt % % accom wt % % accom wt %
Concreting (3,000psi @ 28days) 15.55% 0.00% 100% 15.55% 100% 15.55%
Gravel Bedding 0.42% 0.00% 100% 0.42% 100% 0.42%
Plastering of exposed area 0.12% 0.00% 0% 0.00% 0.00%
Sika grout 212 (leveling) 1.81% 0.00% 0% 0.00% 0.00%
Hauling of Steel pole @ Veco Naga to San Fernando 9.03% 0.00% 0% 0.00% 0.00%
Erection of 95 ft Steel pole segmented type 7.58% 0.00% 0% 0.00% 0.00%
H.D.G. H.S. Anchor Bolt 16mmØ x 600mm x 50mm (32pcs) 0.65% 0.00% 0% 0.00% 0.00%
Installation of Climbing rungs 1.10% 0.00% 0% 0.00% 0.00%
Prepared by :
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 12 of 15
Project : Addendum Works - San Fernando Substation Site Development Works
Subject : Work Accomplishment Report
Location : San Fernando Substation, Cebu
Date : March. 12, 2018
3.0 FOOTING - F1
Excavation 0.05% 100% 0.05% 0% 0.00% 100% 0.05%
Back Filling & Compaction 0.03% 100% 0.03% 0% 0.00% 100% 0.03%
Rebar Works 0.06% 100% 0.06% 0% 0.00% 100% 0.06%
GI tie wire #16 0.00% 100% 0.00% 0% 0.00% 100% 0.00%
Concrete Works (3,000psi @ 28days) 0.20% 100% 0.20% 0% 0.00% 100% 0.20%
Gravel Bedding 0.03% 100% 0.03% 0% 0.00% 100% 0.03%
Page 13 of 15
Previous This Period To date
ITEM DESCRIPTION Wt%
% accom wt % % accom wt % % accom wt %
Concreting (3,000psi @ 28days) 15.55% 100% 15.55% 0% 0.00% 100% 15.55%
Gravel Bedding 0.42% 100% 0.42% 0% 0.00% 100% 0.42%
Plastering of exposed area 0.12% 0.00% 100% 0.12% 100% 0.12%
Sika grout 212 (leveling) 1.81% 0.00% 100% 1.81% 100% 1.81%
Hauling of Steel pole @ Veco Naga to San Fernando 9.03% 0.00% 100% 9.03% 100% 9.03%
Erection of 95 ft Steel pole segmented type 7.58% 0.00% 100% 7.58% 100% 7.58%
H.D.G. H.S. Anchor Bolt 16mmØ x 600mm x 50mm (32pcs) 0.65% 0.00% 100% 0.65% 100% 0.65%
Installation of Climbing rungs 1.10% 0.00% 100% 1.10% 100% 1.10%
Prepared by :
Bryan F. Villavert
Operation Manager
ELJ BUILDERS, INC.
Page 14 of 15
Project : Addendum Works #2 - San Fernando Substation Site Development Works
I. DIRECT COST
Supply & Spreading of Earthfill 389 cum 350.00 136,150.00 10.00 3,890.00 80.00 31,120.00 171,160.00
IV. CONTRACTORS TAX (12% of sum for Direct, Indirect & Contractors Profit) 22,167.86
Prepared by : 349,000.00
Bryan F. Villavert
Operation Manager