SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD WIRE - Rev-0
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD WIRE - Rev-0
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD WIRE - Rev-0
WIRE
1.0.0 DESIGN INPUT
LITL-021-ELV-302-R-003 REV - 00 1 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
1.3.6 Length of hardware Lh = 0.5 m
2.1.0 The design calculation for maximum sag of lower most conductor is based on the "Generation, Transmission
and Utilization of Electrical Power" by A. T. Starr
2.2.0
Maximum initial tension is assumed at 55˚ C temperature and Full Wind.
2.3.0
It may be noted that in short dead ended span, insulator strings have considerable effect on the sag of the
conductors. The conductor assumes one catenary and the insulator string another.
3.0.0 REFERENCES
3.1.0 Standards
IEC 60826
3.2.0 Books
Wi = nd x Wd = 99 x 1 = 99 kg
LITL-021-ELV-302-R-003 REV - 00 2 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Basic wind speed VRB = 40.2 m/s
Where,
where,
Drag Co efficient for conductor Cxc = 1 (As per IEC 60826, Clause 6.2.6, Pg no:49)
Ω = 90
Ω is the angle between the wind
direction and the conductor
Ac = 5.24465 kg/m
Wind Factor = 1
LITL-021-ELV-302-R-003 REV - 00 3 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Loading factor q1 = 2.55
f2 2x ( f2 - ( K1 - e x t x E)) = K2 x q 2 2
K1 = f1 - L 2x & 2x q1 2x E / 24 x( f1 ) 2
= 101.77
K2 = L 2x & 2x E / 24
= 1.56E+07
f2 2 x ( f2 - ( K1 - e x t x E)) = K2 x q2 2
691215.0649 = 15562490.15
LITL-021-ELV-302-R-003 REV - 00 4 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
f2 = 52.2743355350618 kg/cm2
Tension = 312 kg
Sag = 3.39567058909058 m
LITL-021-ELV-302-R-003 REV - 00 5 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
8.0.1 Total Sag at temperature = 75 with wind factor = 0
CONCLUSION
LITL-021-ELV-302-R-003 REV - 00 6 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
8.0.5 Height of Main Bus h = 15 m
Insulator sag of main bus (total sag - Sag -
8.0.6 = -48.66
Tension at specific conditions)
Vertical Clearance between lower most
8.0.7 Vclr = 5.449 m (taken from drawing)
Conductor and equipment
Minimum clearance between phase to phase for
8.0.7 = 4.2 m
400kV
Since the calculated vertical clearance between Equipment and Lower most conductor is greater than the
minimum clearance between phase to phase, The selected height of tower 22m is adequate.
LITL-021-ELV-302-R-003 REV - 00 7 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
LITL-021-ELV-302-R-003 REV - 00 8 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
1.0.0 DESIGN INPUT
1.1.10 Basic Wind Speed Vb = 40.2 m/s (AS PER TECH. SPEC)
LITL-021-ELV-302-R-003 REV - 00 8 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
1.3.6 Length of hardware Lh = 1.484 m
2.1.0 The design calculation for maximum sag of lower most conductor is based on the "Generation, Transmission
and Utilization of Electrical Power" by A. T. Starr
2.2.0
Maximum initial tension is assumed at 55˚ C temperature and Full Wind.
2.3.0
It may be noted that in short dead ended span, insulator strings have considerable effect on the sag of the
conductors. The conductor assumes one catenary and the insulator string another.
3.0.0 REFERENCES
3.1.0 Standards
IEC 60826
3.2.0 Books
Wi = nd x Wd = 165 x 1 = 165 kg
LITL-021-ELV-302-R-003 REV - 00 9 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Basic wind speed VRB = 40.2 m/s
Where,
m'sc = m's + ((np x mc) / (nc x Lc)) = 2.4 + ((7 x 1.999) / (4 x 48.742))
where,
Drag Co efficient for conductor Cxc = 1 (As per IEC 60826, Clause 6.2.6, Pg no:49)
Ω = 90
Ω is the angle between the wind
direction and the conductor
Ac = 6.31498 kg/m
Wind Factor = 1
LITL-021-ELV-302-R-003 REV - 00 10 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Loading factor q1 = 2.74
f2 2x ( f2 - ( K1 - e x t x E)) = K2 x q 2 2
K1 = f1 - L 2x & 2x q1 2x E / 24 x( f1 ) 2
= -2097.56
K2 = L 2x & 2x E / 24
= 4.79E+06
f2 2 x ( f2 - ( K1 - e x t x E)) = K 2 x q2 2
6612320.4954 = 4788043.57
LITL-021-ELV-302-R-003 REV - 00 11 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
f2 = 52.2743355350618 kg/cm2
Tension = 452 kg
Sag = 1.64043436575015 m
LITL-021-ELV-302-R-003 REV - 00 12 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
D3 = a1x(cosh(X/a1) - 1) = 182.85 x (cosh(24.41/182.85) - 1) = 1.64
CONCLUSION
LITL-021-ELV-302-R-003 REV - 00 13 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
8.0.5 Height of Main Bus h = 8 m
Since the calculated vertical clearance between Equipment and Lower most conductor is greater than the
minimum clearance between phase to phase, The selected height of tower 15m is adequate.
LITL-021-ELV-302-R-003 REV - 00 14 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
1.0.0 DESIGN INPUT
1.1.4 Basic Wind Speed Vb = 40.2 m/s (AS PER TECH. SPEC)
1.1.5 Span L 57 m
2.1.0 The design calculation for maximum sag of lower most Shield wire is based on the "Generation, Transmission
and Utilization of Electrical Power" by A. T. Starr
2.2.0 Maximum initial tension is assumed at 55˚ C temperature and Full Wind.
3.0.0 REFERENCES
3.1.0 Standards
IEC 60826
3.2.0 Books
LITL-021-ELV-302-R-003 REV - 00 14 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Basic wind speed VRB = 40.2 m/s
Where,
where,
Drag Co efficient for conductor Cxc = 1 (As per IEC 60826, Clause 6.2.6, Pg no:49)
Ω = 90
Ω is the angle between the wind
direction and the conductor
Ac = 1.73802 kg/m
Wind Factor = 1
LITL-021-ELV-302-R-003 REV - 00 15 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Loading factor q1 = 3.14
f2 2x ( f2 - ( K1 - e x t x E)) = K2 x q 2 2
K1 = f1 - L 2x & 2x q1 2x E / 24 x( f1 ) 2
= -527.63
K2 = L 2x & 2x E / 24
= 9.93E+07
f2 2 x ( f2 - ( K1 - e x t x E)) = K2 x q2 2
99335253.89 = 99335253.89
f2 = 338.631397040969 kg/cm2
LITL-021-ELV-302-R-003 REV - 00 16 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
Tension = 321 kg
Sag = 0.738 m
CONCLUSION
LITL-021-ELV-302-R-003 REV - 00 17 of 17
SAG TENSION CALCULATION FOR CONDUCTOR AND SHIELD
WIRE
LITL-021-ELV-302-R-003 REV - 00 18 of 17