JSA For Installation of Out Door Units

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4
At a glance
Powered by AI
The key takeaways from the document are job safety analysis procedures for installation of outdoor AC units including potential hazards and controls at different job steps.

Potential hazards of working at height mentioned are falling from height and falling of materials.

Controls mentioned for working at height are using approved scaffolding, inspection of scaffolding, using safe access, wearing fall protection equipment like harness, restricting access and establishing drop zones.

f _____

JOB TITLE / AIM: JSA for Installation of outdoor units of split ACs in new project living container at PSS camp.
JSA DATE: 10/11/2006 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Selah- u -din SCRIBE: Masood Memon
PARTICIPANTS; Zahid, Asad najeeb
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.

1- Mobilization of workers, tools & Equipment


2- Working at Height
3- Installation of outdoor units of split ACs
4- Demobilization

Alternatives Considered: What are other possible means of achieving the job outcome?

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment and Unauthorised equipment/tools brought to site Before mobilizing any equipment/tools make sure
workers that the equipment is inspected.
All the hand tools must be colour coded prior to
mobilization.
Uninducted person mobilization on site Prior to work all worker must be inducted DEL &
BHPB
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. JSA was discussed to workers and
signed at the back.
2 Working at height Working at height/person falling 1- Ensure persons only stand on
approved scaffold plat form erected
around perimeter building
2- Scaffold shall be inspected by
competent person immediately prior
to use
3- Scaffold contain, sill sole bolt, base
plate, braces toe board, complete plat
form with secured planks, mid rail&
top rail.
4- Ensure stand by vehicle available at
area at the all time
5- Ensure persons of mind during lift
activity
6- All persons to have green card for
working at height. Only current
green-tagged scaffold can be
accessed.
Use of shortcut access Always every person shall use safe access of
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
scaffold.
Poor house keeping Keep good house keeping as to save falling and
tripping hazards by proper training to personnel by
toolbox talk.
Unskilled workers worked on scaffold Competent / trained worker participate this
activity.
Workers will be aware about such activity by
conducted toolbox talk.
Worker carry green ID card with stamp.
Worker shall not allow work at height without
green card.

Heat Stress/Exhaustion Ensure potable water/sufficient shelter is available


in each area where workers are doing the job. First
aid kit available at site.
Tripping Hazards Ensure drop zones are in place at the all times
Ensure that the materials shall be placed in proper
location that it will not create tripping hazards
Ensure that drop zone shall be established to
manage the hauling of the materials and restrict
access
Ensure that area at bottom of the scaffold is drive
Fall of workers and materials For purpose of decent & ascent will be use scaffold
safe access.
Ensure that the materials shall be place in proper
location that it will not create tripping hazards.
Ensure that a drop zone shall be established to
manage the hauling of the materials and restrict
access.
Ensure that the area at bottom of the scaffold is
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
drive.
Unwounded material used Sound material shall be used and inspected prior to
use
Unbalance surface of post stand Scaffold shall be erected proper balance, levelling
and smooth surface.
3 Installation of outdoor units of split Hand Injury Ensure proper hauling of materials/get help if
ACs required/Wear hand gloves.
Heat Stress/Exhaustion Ensure potable water/sufficient shelter is available
in each area where workers are doing the job. First
aid kit available at site
Loose Clothing No loose clothing/scarf shall be worn at site

Dust Wear dust mast

Work start without PPE’s Prior to work all PPE’s must be wear

Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site

4 Demobilization Poor house keeping Housekeeping shall be conducted after completing


the job, and area must be clean