JSA For Concrete Pouring Using Crane and Bucket3

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

f _____

JOB TITLE / AIM: JSA for concrete pouring using crane and concrete bucket includes night works
JSA DATE: 03/07/06 JSA NO./ REVISION: 122
SUPERVISOR/ JSA LEADER: Zafar Iqbal SCRIBE: Hernand Suyom
PARTICIPANTS : M. Ramzan, Abdul Khalique, Imtiaz Ghani
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of equipment & workers
- Crane
- Transit mixer
- Bucket
- Wire rope & shackle
2. QC inspection for concrete quality prior to pouring
3. Concrete pouring using crane includes transit mixer concrete unloading to concrete bucket
4. Night working
5. Demobilization

Alternatives Considered: Concrete pump mixer breakdown

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment & Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
workers site that the E &P Personnel & BHP got inspected the
equipment. Checklist are in equipment

Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Ensure bringing of materials are secured and not
overloaded
Ensure a preparation area to keep the access clear
Workers starting the job unfit to work All personnel must undergo the fitness exam from
DEL company doctor & if not fit to work shall not
be allowed to work at the project site.
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Equipment failure Ensure equipment are being inspected prior to use
& on a daily basis
Ensure that banks person was provided prior to
mobilization
Equipment crane/transit mixer overturn
Ensure outrigger is fully extended, stable with
outrigger pad in place.
Ensure that bucket are check without leakage
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure area to be secured and barricaded during
preparation and placement of extendable hose
Unauthorised operator Ensure that enough man power was provided
during preparation
Ensure that operator are trained and experience in
the concrete pump operation
Ensure that no unauthorised person shall operate
the machine and stay near the machine
Ensure that no leakage from the chute, the tire has
been choke to ensure no movement will take place
during concrete pouring
No other person shall stay under the concrete
bucket during pouring
Ensure tag line was in place
Ensure a experienced rigger who will be the one
man signal man during bucket positioning and
pouring

Bucket failure Ensure that the bucket pad eye are inspected and
no sign of defects
Ensure that bucket locking device are safe and
secured prior to lifting
Ensure to established loading area for bucket and
transit mixer
Ensure that are was secured and barricaded
unauthorised person should not be at the working
area
Uncertified lifting gears Ensure that lifting gears are certified and inspected

Traffic Ensure that traffic movement has been establish to


allow smooth movement of vehicle and eliminate
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
equipment collision
Ensure to establish a standby parking area to
eliminate the traffic
Ensure that transit mixer driver are being oriented
about the traffic flow and follow the site seatbelt
policy/speed limit policy
Ensure that MSDS for cement are available at
Doctors office
Equipment stuck up
Ensure that equipment shall not access through
uneven/compacted soil
2 QC inspection for concrete quality Dust Ensure proper wetting of soil and workers are
prior to pouring wearing dust mask
Establish a check point for QC inspection
Heat Stress/Exhaustion Ensure that enough man power are present during
cement testing
Ensure enough ventilation and lighting are
available in testing area
Equipment failure
Ensure that concrete debris are contained in one
area
Ensure that a communication radio is available at
Miscommunication the area
Ensure that designated traffic man shall manage
the transit mixer movement and testing piece
sample preparation
No unauthorised person shall not allowed at the
testing area
Eye irritation/skin irritation Ensure workers are wearing hand gloves
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Ensure that equipment was inspected by equipment
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
supervisor & equipment inspection was in the
equipment
Personnel & equipment interface
Ensure that workers accessing the right walkway
and watch your steps.
Ensure that area was physically barricaded &
banks person was in place
Ensure that area for equipment & workers are
separated & vehicle access are identified
Ergonomics hazard
Ensure that workers are being oriented about the
proper positioning
3. Concrete pouring using crane Personnel & equipment interface Ensure that equipment and workers movement will
includes transit mixer concrete be observed no other workers shall stay on near the
unloading to concrete bucket machine during pouring
SIMOPS Ensure that proper distance of workers to the boom
arm pipe
Ensure a nylon rope was provided at the pump
Trips/falls
hose to control the boom arm movement
Ensure good communication between the rigger
and the operator
Ensure that a standby banks person shall be place
for transit mixer set up prior to the concrete
pouring to the concrete pump.
Ensure that sufficient lighting is in place.
Ensure that workers shall not stand underneath the
suspended boom arm of concrete pump especially
during transferring position from one place to
another.
Ensure that gum shoes was provided for worker
during concrete pouring
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure that enough man power was provided to
control the hose movement c/w nylon rope
Ensure that whenever a concrete pump equipment
failure, the operation must be stop unless otherwise
that the equipment shall operate/function smoothly.
Ensure that area have been provided with proper
access & egress
Ensure slow movement of workers while accessing
the area
Ensure that area secured & barricaded
Ensure potable water/sufficient shelter is available
Heat Stress/Exhaustion each area where workers are doing the job. First
aid kit available at site.
Ensure that equipment shall not position in the
unstable condition and banks man should be
Equipment fall over available at all times in the area
Ensure daily equipment inspection and any
Equipment failure defects found informed immediately the equipment
supervisor for repair.
Ensure that only designated access shall be used
going down and up the embankment
Ensure that no worker shall work without sufficient
Workers might fall over the working area
light.
Ensure that wearing of clear glass is a must after
dark.
Ensure proper tools are use for the job
Ensure that full supervision are in place
Ensure that excess materials shall removed far way
from the area
Ensure that excess materials after finishing the
pouring shall be return again to the transit mixer to
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
eliminate concrete debris in the area and
designated area for debris must be identified
Load might drop from from person(content of Ensure that the bucket will not fill over its capacity
bucket up & down or in mid air
Eye injury Ensure workers must not stand under the load
during up and down and wearing prescribe clear
glass
Backing of equipment Ensure access is clear and properly lit with full
time banks person and standby man in the
unloading.
4. Night working Poor visibility Ensure sufficient amount of lighting in the area
No work shall be performed if there if not enough
lighting
Trips/falls/waking over wet concrete/steel bar If access is not properly lit then a designated
assembly point shall be established with sufficient
light.
Ensure all excavations adjacent to the work area is
taped off with high visibility tape prior to
commencement of works.
A standby vehicle should be present at the area
A charge radio must be present at all times at the
Miscommunication area and any incident must be reported
immediately to BHPB personnel
Doctor will be on call in any case
Person working alone Employees will assure a buddy system
No worker shall work alone at the site
Snake bite Ensure that no workers shall work more than 14
hours and have 7 hours enough sleep
Ensure that special attention will be done for the
presence of snake in the area
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
5. Demobilization Poor Housekeeping Ensure that area was left clean and tidy