Copy (2) of JSA For Rebar Sizing Manual & Mechanical

This JSA document outlines the job steps and associated hazards for manual cutting and bending of steel. The three job steps are: 1) Mobilization of equipment and workers, 2) Rebar sizing and cutting using manual and mechanical methods, and 3) Demobilization. Potential hazards identified include hand and eye injuries, equipment failure, heat stroke, protruding rebar, and back injury. Controls include using proper PPE like gloves, safety glasses and shoes; ensuring equipment is inspected; prohibiting unauthorized persons in the work area; and orienting workers on safe postures.

Uploaded by

Mohammed Minhaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views4 pages

Copy (2) of JSA For Rebar Sizing Manual & Mechanical

This JSA document outlines the job steps and associated hazards for manual cutting and bending of steel. The three job steps are: 1) Mobilization of equipment and workers, 2) Rebar sizing and cutting using manual and mechanical methods, and 3) Demobilization. Potential hazards identified include hand and eye injuries, equipment failure, heat stroke, protruding rebar, and back injury. Controls include using proper PPE like gloves, safety glasses and shoes; ensuring equipment is inspected; prohibiting unauthorized persons in the work area; and orienting workers on safe postures.

Uploaded by

Mohammed Minhaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

JOB TITLE / AIM: Manual Cutting & using cutting machine/steel bending using bending machine/steel fixing, form

works
JSA DATE: 24/07/2006 JSA NO./ REVISION: 117
SUPERVISOR/ JSA LEADER:Shoaib SCRIBE: Abdullah Khan
PARTICIPANTS : Shoaib,
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
2. Rebar Sizing and Cutting manual/ Mechanicl handling of rebars
3. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
site that the E &P Personnel got inspected the
equipment. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.

Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site.
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Buried electrical services Ensure special precaution undertaken for the
presence of underground services in the area
2 Rebar sizing and cutting, manual Hand Injury Ensure proper hauling of materials/get help if
/Mechanical handling of rebars. required/Wear hand gloves.

Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
hand injury, eye injury req..Safety shoes, helmet, safety glass, gloves
Personnel and Equipment interface
Other workers not involved at the job must not be
come closer at the area
Area to be secured and barricaded
Unauthorized person not allowed to work on the
working area

Eye injury Workers working on the area will be required


to wear safety glass at all times
Scorpion tying
Protruding steel wire must be remove or kept
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
secure

Workers will inform and be aware about the


Snake bite presence of snake at the area. No killing of snakes.
Ensure good housekeeping

Tripping hazards Ensure that worker accessing the right path.

Poor housekeeping  Ensure proper placement of rebar materials

Provision of drinking water & shelter


Heat stroke
If workers experience dizzines inform
immediately the supervisor

Simops Other workers/contractors working on the area will


be inform and advised to stop if necessary

Protruding rebar Removal of the rebar manually must wear hand


gloves, placement of caps is necessary

Proper checking of equipment in daily basis by


Equipment Failure equipment supervisor

Fire No smoking policy shall be implemented

Workers might get pinch point to equipment No loose clothing must be wear from the area/
scarf are not allowed

Back injury Workers will be oriented about the proper posture


and positioning during the execution of the job.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
3. Demobilization Poor hosukeeping Ensure Proper Housekeeping