100% found this document useful (2 votes)
2K views1 page

PQCDMS

The document is a scorecard that tracks the key performance indicators (KPIs) and key achievement indicators (KAIs) for a manager model machine across several categories from August 2019 to March 2020. It measures metrics like overall equipment effectiveness, availability, performance, quality, production, breakdowns, defects, costs, schedule adherence, accidents, kaizens, and space savings. Targets are set and the actual performance each month is recorded to assess progress.

Uploaded by

Jm Venki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views1 page

PQCDMS

The document is a scorecard that tracks the key performance indicators (KPIs) and key achievement indicators (KAIs) for a manager model machine across several categories from August 2019 to March 2020. It measures metrics like overall equipment effectiveness, availability, performance, quality, production, breakdowns, defects, costs, schedule adherence, accidents, kaizens, and space savings. Targets are set and the actual performance each month is recorded to assess progress.

Uploaded by

Jm Venki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PQCDMS-13

PQCDSM Score card for Manager Model Machine

Category KPI/KAI Measure UOM Bench Mark Target Aug'19 Sep'19 Oct'19 Nov'19 Dec'19 Jan'19 Feb'19 Mar'19

OEE OEE %

Availability rate AR %

Performance rate PR %
P
Quality rate QR %

Production Monthly production Nos

Breakdown Breakdown occurrence No's

In house rejection %

Q Defects Rework %

Customer complaint No's

Maintenance cost Rs / Motor

C Cost Saving Lubrication cost Rs / Motor

Tool cost Rs / Motor

Plan Vs Actual %
D Schedule Adherence
Next process stoppage No's

Minor Accidents Nos

S Accident Major Accidents Nos

Unsafe conditions identified Nos

Kaizens No of kaizen /Person/Month Nos

One point lessons No of OPL /Person/Month Nos

M 1S Rating 1S score Nos

2s Rating 2S Score Nos

Space saving Actual Space saved Sq.Mtr