UWP 25418 001 Elevated Water Tank 5000L CR02 PDF
UWP 25418 001 Elevated Water Tank 5000L CR02 PDF
UWP 25418 001 Elevated Water Tank 5000L CR02 PDF
Min.25mm
PIPE CLAMP -
SEE DETAIL 2
c F 65 330mm LONG MGI PIPE PIECE THREADED BOTH ENDS - - * - 2no 3 STRUCTURAL STEELWORK:
f f
3.1 ALL STRUCTURAL STEELWORK GRADE 300W
G 65 1020mm LONG MGI PIPE PIECE THREADED BOTH ENDS - - * - 1no
ACCORDING TO SABS 1431.
BOLT DETAIL
1500
H 65 MGI CONICAL SEAT UNION - - * - 1no 3.2 STEELWORK GENERALLY OF WELDED CONSTRUCTION
OUTLET
U WITH SITE CONNECTIONS BOLTED.
1:5 U J 65 MGI BARREL NIPPLE - - * - 1no UNLESS OTHERWISE SHOWN ARE :
c
K 65 BRASS FEMALE THREADED FULLWAY GATE VALVE - - - - 1no
ALL HOLES 12 DIA. FOR M10 BOLTS
ALL BOLTS GRADE 4.8
1350
L 65 2000mm LONG MGI PIPE PIECE THREADED BOTH ENDS - - * - 1no ALL GUSSETS 6mm PLATES
ALL WELDS 6mm FILLET
M 65 65x65x65ND MGI FEMALE EQUAL TEE - - * - 2no
H SECTION H-H LEGEND: N 65x50 65x50ND MGI REDUCING BUSH - - * - 2no
3.3 ALL STEELWORK SHALL BE SUPPLIED, FABRICATED
DELIVERED AND ERECTED IN ACCORDANCE WITH
1:5 SABS-1200H AND SABS-0164 1984.
a : 80 x 80 x 6 HRA (45B/M $)
PIPE CLAMP - O 50 MGI BARREL NIPPLE - - * - 1no 3.4 SITE WELDING OF STEELWORK SHALL NOT BE
b : 40 x 40 x 6 HRA (23B/M $)
2700
SEE DETAIL
PERMITTED WITHOUT THE ENGINEERS APPROVAL.
ELEVATION TYPICAL LUG DETAIL (6x) c : 125 x 75 x 10 HRA (45B/M $)
d : 30 x 6 F (25B/M $) POSITION OF 5000 LITRE
P 50 BRASS FEMALE THREADED FULLWAY GATE VALVE - - - - 1no
3.5 CORROSION PROTECTION:
1:5 1:5 POLYETHYLENE WATER TANK Q 50 50NDx50BSP MALE ADAPTOR COMPRESSION FITTING - - - - 2no 3.5 .1 PAINTWORK IN WORKSHOP:
e : 40 x 40 x 3 HRA (23B/M $) (FITTING `W') EPOXY COATING SHALL BE AN APPROVED
1500
4500
f : 125 x 50 x 20 x 2,5 CRLC R 50 600mm LONG HIGH DENSITY POLYETHYLENE TYPE IV CLASS 6 PIPE
(TO SABS 533) - - - - 2no TWO COMPONENT, POLYAMIDE CURED PIPE
COATING. IT SHALL BE APPLIED IN THE
NOTE:
1350
S 50x40 50NDx40BSP MALE ELBOW COMPRESSION FITTING - - - - 2no WORKSHOP BY SPRAYING TO A FINAL
NM PLUGGED OUTLET FOR
HRA = HOT ROLLED ANGLE O FUTURE EXTENSION THICKNESS OF NOT LESS THAN 300 MICRON.
P T 50 1714mm LONG HIGH DENSITY POLYETHYLENE TYPE IV CLASS 6 PIPE
SUPERIMPOSED POSITION OF QUANTITIES FOR SINGLE TANK STAND F = FLAT BAR 3.5 .2 PAINTWORK AFTER ERECTION:
Y (TO SABS 533) - - - - 1no
TANKSTAND L CRLC = COLD ROLLED LIPPED CHANNEL Q a) AFTER INSTALLATION ANY CHIPS OR
ITEM DESCRIPTION LENGTH No.OFF U E
B/B = BACK TO BACK ( 6 ) 100-500 U 50 90 DEGREE ELBOW COMPRESSION FITTING - - - - 2no SCRATCH MARKS SHALL BE MADE GOOD
BASE PLATE 80 x 80 x 6 HRA 300mm 4 F
COLUMN 80 x 80 x 6 HRA 4000mm 4 B/M = BACKMARK ON SITE WITH BRUSH APPLIED EPOXY
S E V 65 3150mm LONG MGI PIPE PIECE THREADED BOTH ENDS - - * - 1no
STRUT 40 x 40 x 6 HRA 1580mm 10 $ = UNLESS OTHERWISE SHOWN A R A PAINT.
FLOOR BEAM 125 x 75 x 10 HRA 2200mm 2
C B W - 5 000 LITRE POLYETHYLENE WATER TANK (2040mm HIGH x 1800mm b) AN INTERIM LAYER ACCORDING TO
PLANK 125 x 50 x 2 CRLC 2700mm 11 A DIAMETER), COMPLETE WITH 50x40 NOM.DIA NYLON REDUCING
K SABS 681 TYPE I SHALL BE APPLIED
VERT.BRACING 30 x 6 F 2180mm 12 WATER TANK TO BE SUITABLY BUSHES, SEALED INTO ALL INLETS AND OUTLETS, INCLUDING
J VERT.BRACING 30 x 6 F 2150mm 4 HELD IN POSITION ON PLATFORM TO A FINAL THICKNESS OF 25 MICRON.
A 40 NOM.DIA GALV'D PLUG FITTED TO OPENING ABOVE INLET.
H HORI.BRACING 40 x 40 x 3 HRA 2200mm 4 USING MIN. 2 x STRANDS 4,0mm 3.5 .3 FINAL FINISHING LAYER:
PIPE CLAMP 80 x 80 x 6 HRA 100mm 6 GALVANISED STEEL WIRE FIXED
63ND PVC CLASS 6
PIPELINE FROM BOREHOLE
B TANK TO BE SUPPLIED COMPLETE WITH SUFFICIENT
4mm DIA GALVANISED STEEL WIRE FOR ANCHORING A FINAL ENAMEL LAYER ACCORDING TO SABS
1500
PIPE CLAMP M10 U-SHAPED BOLT 125mm 6 TO TANK FIXING LUG AND PUMP STATION TO THE TANKSTAND PLATFORM AS DETAILED ON 630 GRADE 1 SHALL BE APPLIED WITHIN
WOOD BLOCK 140mm 6 PLATFORM SUPPORT BEAMS PLAN NO. 125 826/97ME - - - - 1set
FIXING PLATE 75 PL 6 75 LONG 75mm 8 24 HOURS AFTER THE INTERIM LAYER HAS
BOLTS M10 ST/STL 55mm 64 X 63 PVC CLASS 6 PIPING - - - - 12m BEEN APPLIED, TO A FINAL THICKNESS OF
G D 25 MICRON (COLOUR AS INSTRUCTED).
2600 Y 65 MGI HOLLOW PLUG - - * - 2no
PIPE CLAMP -
SEE DETAIL 37.5 37.5 PLAN MISCELLANEOUS FITTINGS
1) PIPE CLAMPS AS DETAILED ON PLAN No. 125 825/97ME - - - - 6no
4 GENERAL:
4.1 READ THIS PLAN IN CONJUNCTION WITH ALL
125 125 NOTE N.T.S.
THE RELEVANT DRAWINGS.
E ALL FLANGES TO BE DRILLED ACCORDING TO SABS 1123-1977 TABLE 11
1600 4.2 ALL DIMENSIONS IN MILLIMETERS.
300
75 75
(STEEL SCREWED BOSS FLANGES - 1000/4) AND REFERED TO AS SABS
NGL E 1520
11 IN THE SCHEDULE OF FITTINGS
SUPERIMPOSED POSITION
D OF FLOOR AREA
CONCRETE THRUST
15000
BLOCK
590
TANK FIXING LUG
C
TB
OUTLET D SEE DETAIL TWL
b TANK FIXING LUG
V = 0,1 cu m a
GATE POSITION
a SEE DETAIL
CR02
(MAY VARY)
ELEVATED
C 2 C C C TANK
OUTLET e
e f f f f f f f f f f f f f
SECTION A-A
SCALE:1:25
1600
1520
2700
1520
b b 500mm x 600mm
LOCKABLE CAST
13 / FLOOR MEMBERS ex.:
125 x 75 x 20 x 2 CRLC
IRON COVER OVER
U U (10 x 2 700 long + FRAME.
1 x 1 650 long SINGLE TANK)
(13 x 2 700 long
POSITION OF 5 000 LITRE
15000
REST OF MULTIPLE TANKS)
T POLYETHYLENE WATER TANK T ELEVATED TANK
TANK FIXING LUG
(FITTING `W') SEE DETAIL
a a
b
TANK FIXING LUG
D SEE DETAIL
590
2065
FENCE
1032 1032 TO RETICULATION
90
D AND AS INSTRUCTED
LAYOUT PLAN E-E BY ENGINEER
1:25
FENCE
FLOOR LAYOUT
R S M M R 1:25
S
PLAN VIEW CHLORINATOR
NTS MANHOLE
16-05-2014 CHLORINATOR REVISED TO NEW DESIGN S.G.R.
400
45 75 CR02
PIPE CLAMP 50 F 5 x 100 LONG 500
PIPE CLAMP 10 30 5 30 45 WITH 1-12dia HOLE CHLORINATOR ADDED TO DETAILS
FOR 1-M10 BOLT
223 177 100 220mm THICK 04-12-2013 CR01 S.G.R.
50 F 5 x 100 LONG BRICK MANHOLE
f WITH 1-12dia HOLE RISING MAIN 8 BAR GLYCERINE 12-11-2013 CR00 ISSUED FOR CONSTRUCTION S.G.R.
50
b 23 FOR 1-M10 BOLT INLET
10
45
1100
b
45
35
30
175
REVISION TABLE
75
23
16
40
40
x 150mm 20MPa CONCRETE (TO COMPLY WITH SABS IMPLEMENTING AGENT TECHNICAL SUPPORT
65
e 75 PL 6 x 75 LONG d
A a b c WITH MESH REF 245 776-1975 CLASS 8)
125
125
b FULLY WELDED TO 'a'
17
PLASSON SADDLES WITH
WITH 1-12 DIA. HOLE FOR
79
STAINLESS STEEL BOLTS
60
1-M10 BOLT d
AND NUTS 20mm DIA HDPE
400
80 100 200 200 200 200 200 200 200 200 200 200 200 200 100 2700
140
VIEW B 10 35 35 550 1600 550 MVULA TRUST UWP CONSULTING (PTY)
V M10 U-SHAPED BOLT HAVING
125mm LONG LEGS OF WHICH THE
1:5 f f f f f f f f f f f f f f P.O. Box 8112 LTD
38 65 38
PIPE CLAMP
PIPE CLAMP
ENDS ARE THREADED FOR A A c c
Nahoon P.O. Box 19276
DISTANCE OF 50mm, COMPLETE 27 86 27 d b
WITH NUTS AND WASHERS c East London TECOMA
80 x 80 x 6 HRA COLUMN R=38 50mm WIDE x 70mm HIGH x 140mm
a
5201 5214
TANKSTAND LONG SHAPED HARD WOOD BLOCK
HAVING 2 x 12mm DIA. HOLES d Tel: (043) 726-2255/6/7 Tel: (043) 721-0186
20
18
DRILLED FOR ANCHOR BOLT Fax: (043) 726-2344 Fax: (043) 721-0288
23
1500
1500
K WELDED TO THE COLUMN AND b
1320
J 37
70
40
40
b
125
H
FOOTING. SHEET SIZE
105
G NAME SIGNATURE DATE
17
A0
1200 MAX.
25
e
40
a
DESIGNED S.RICHTER 16 MAY 2014
PIPE CLAMP - 80 x 80 x 6 HRA 100mm LONG d
PIPE CLAMP 6 SCALE
SEE DETAIL FULLY WELDED TO 'a' WITH 43 37 b
1-12 DIA. HOLE FOR M10 b b c D.DICKSON
d c DRAWN 16 MAY 2014
300 AS SHOWN
200
d
PIPELINE FROM BOREHOLE C = CONSTRUCTION
B B FOR 1-M10 BOLT VALIDATED
PUMP STATION AB = AS BUILT
X (No. REQUIRED : 8x)
C C
1500
1500
SEE FLOOR LAYOUT FOR
INLET
A POSITIONS
250
A
TB
V = 0,1 cu m BASE PLATE DETAIL 1 PIPE CLAMP DETAIL VIEW A
CONCRETE 1:5 CLIENT
THRUST BLOCK (4 OFF REQUIRED) (6 OFF REQUIRED)
500
E E
5700
5700
1:5 1:5
INLET AND OVERFLOW b
b
b b
b
b
SECTION B-B CR02
500
1:25
d
d
STORAGE SUMP AND IN-LINE CHLORINATOR DETAILS d
d
1650
TOP SLAB: (FLOATED FINISH)
1650mm x 1070mm x 150mm WITH 1210 a a a a
1500
1500
375 250 375
600mm x 600mm LOCKABLE
MANHOLE COVER AND FRAME DOSATRON OR SIMILAR 1000 SQUARE
FULLWAY GATE VALVE (TO COMPLY WITH
SABS 776-1975 CLASS 8) APPROVED NON-RETURN VALVE
PROJECT
8 BAR GLYCERINE PRESSURE GAUGE FOOTING DETAIL FOR
FILTER
b SANDY CONDITIONS b
ACCELERATED SCHOOLS INFRASTRUCTURE
RISING MAIN (PIPE DIA. VARIES)
b b
1:25
b b
DELIVERY INITIATIVE (ASIDI)
1070
630
300
300
220mm THICK BRICK MANHOLE (WITH 3 x 20 L CONTAINERS FILLED CONSTRUCTION OF WATER AND SANITATION
250
250
WITH CONCENTRATED ADDITIVE
200
200
WEEPHOLES AT INVERT) (BRICKWORK TO BE VALVE
INFRASTRUCTURE AT SCHOOLS IN THE
1000
1000
PLASTERED INTERNALLY AND EXTERNALLY)
EASTERN CAPE PROVINCE.
20mm HDPE
20mm HDPE
950
950
500
500
20mm OUTLET FROM INLET PIPE
700
700
20mm OUTLET FROM THE
TO THE CHLORINATOR THROUGH DOUBLE DOORS WITH LOCK DRAWING TITLE
CHLORINATOR TO THE INLET CABINET FASTENED TO GALVANISED METAL
PIPE THROUGH A 32mm SLEEVE A 32mm SLEEVE PROTECTION
200
200
FRAME AND FASTENED TO CONCRETE BASE
WITH FOUR STAINLESS STEEL BOLTS AND NUTS 1200 x 1200 x 100 20MPA 4.5m HIGH ELEVATED WATER TANK (5000 l)
CONCRETE BASE
POWDER COATED GALVANISED 20mm OUTLET FROM INLET PIPE TO THE
20mm OUTLET FROM CHLORINATOR TO
275 250 275 300 275 250 275 DETAILS AND SECTIONS
METAL CABINET TO HOUSE CHLORINATOR THROUGH A 32mm SLEEVE
THE INLET PIPE THROUGH A 32mm SLEEVE 800 720 800 800 720 800
CHLORINATOR. DOORS - DOUBLE 1000 x 1000 x 100 CONCRETE
WITH LOCK PROTECTION SIZE - 2320 2320
PLINTH FOR MOUNTING OF
1020(H) x 1000(WIDE) x 600(DEEP) CHLORINATOR
MATERIAL - 1.6mm THICK TYPICAL SECTION THROUGH CHLORINATING UNIT SECTION C-C SECTION D-D DBE DRAWING NUMBER
GALVANISED MILD STEEL 1:25
NTS 1:25
EMS NUMBER DISCIPLANE DRAWING NUMBER STATUS REVISION