40) Api 653 Day 3 Book (1-56)
40) Api 653 Day 3 Book (1-56)
API 651
-
21) Fe Fe +2 + e , here electrons are released at the anode, so it is called
anodic reaction
- -
22) O2 + 2 H2O + 4 e 4 OH , Here electrons are used up at cathode. So it
is called cathodic reaction
24) Code for internal Cathodic Protection is NACE RP 0575, & RP 0388
25) Pure hydrocarbon fluids are non corrosive,. But Oxygen, water, steam,
H2S, SO2 are highly corrosive
27) Clean sand alone will not eliminate the need for corrosion protection
28) Corrosion more when pH is less than 5, Corrosion is constant for Ph values
between 5 & 8. Corrosion decreases for pH values greater than 8
pH less than 7 it is acidic , ph = 7 is neutral, pH greater than 7 is
alkaline .
35) Deep impressed current anodes are filled with Carbonaceous Back Fill
40) Tank pad: Material immediately adjutant to the exterior of the tank
41) Water stay at the bottom of the tank due to difference in solubility and
specific gravity
API 652
26) Lining is needed if minimum thickness of the tank bottom is less than 2.5 mm
or if it is suspected Corrosion may affect before the next inspection
27) Thin film means epoxy amine & thick film means epoxy
29) Tank bottom lining should cover the entire tank bottom and it should cover
18 to 24 inches in the shell ie Tank bottom lining should extend 18 to 24
inches up the shell of the tank
30) I mil = 25 Micro meter, or 1mm = 40 mil,
31) Breathing of tanks can produce corrosion
32) Corrosion of CS tank bottom can be as high as 2 mm/year
33) Excess flexing of tank bottom can create cracks, although some flexing can
always occur
34) Thickness of lining means dry film thickness only,
35) Thin film lining is for new tanks and tanks having minimal corrosion
Adv: Lower cost, Easier to apply, Easier to remove, MFL will be more accurate
Dis adv: It needs more thickness of bottom plate ie 0.1 inch,
More prone to mechanical damage,
Rough weld surface and weld spatter can produce Holiday
Solvent in thin film lining may go and settle at the bottom and delay the cure
Presence of moisture will cause amine blush,
Eg of thin film lining: Epoxi amine for tem 1660 Deg F to 220 Deg F
37) Factors that affect coating: Temperature, Internals present, service changes
& Construction details
a. Difference (in ºF) between the relative humidity value and the
internal tank air temperature.
b. Difference (in ºF) between the internal tank air temperature and the
substrate (steel) temperature
c. The temperature at which moisture condenses from the
atmosphere.
d. The moisture content value at which adhesion between the liner
and the substrate cannot be achieved.
a. _____________________________________________
b. _____________________________________________
c. _____________________________________________
Answer: ____________________________________.
10) When considering the need for an internal lining, make selections
from below as some of the more important.
ASME SCE V
area of interest
Back scatter – dark image of B in light
24 Art 2 Sec V T – 284 Acceptable
back ground
Selection of IQI based on thickness(hole
25 Art 2 Sec V - Table T – 276
type/wire type)
26 Establishment of written procedure for PT Art 6 Sec V T –621.1 Yes
Procedure qualification – if change
27 Art 6 Sec V T – 621.2 Yes
required in table T – 621
Pentrants,
emulsifier,
28 Equipment for PT Art 6 Sec V T – 630
solvents,
developer
Control of contamination sulphur shall not
29 Art 6 Sec V T – 641 1% of the residue
exceed by weight
Cleaning and dry and free min distance
30 Art 6 Sec V T – 642 1”
from the examination area
Water washable,
Technique for PT total 6 types (visible &
31 Art 6 Sec V T – 651 post emulsify and
fluorescent
solvent removal
61) PT Dwell time for weld 5 mts, and Dwell time for base metal 10 mts
62) DEV time for High temp alloy is 7 mts
63) In MT pie guage has 8 pie sections
64) RT : Ir 192 : .25 inch to 3 inch, Co 60 1.5 Inch to 7 inch
Wire Peni A .0032 inch to .010 inch , B = .010 to .032 inch, C= .032 to .
10 inch , D= 0.10 to .32 inch
66) In MT if the voltage is more than 25 volts , do not use copper tips, Use Al
or Steel or Lead tips, because deposit of copper over the objects will
occur.
ASME SEC V QB
All Questions Are Closed Book
Note: Some questions in this section are true/false or essay type questions,
instead of multiple choice. Historically, it has been shown that test questions on
ASME V involves a good deal of theory that cannot adequately be explore
through multiple choice questions (although multiple choice question only will be
on the test)
7. A wire IQI shall be placed adjacent to the weld, with the wires parallel to
the weld
a. True
b. False
Name, date Part No etc need not appear as the radiographic images. But they
should be permanently marked on the film
14. D.C. yokes may be used for detecting subsurface discontinuities, per
ASME V?
a. True
b. False
Yokes are only for surface defects whether DC or AC
15. When coatings are applied to enhance contrast, the procedure must be
demonstrated that indications can be detected through the coating
a. True
b. False
16. How many total liquid penetrant techniques are listed in ASME V?
a. 4
b. 6
c. 2
d. 1
18. Water washable penetrant shall be removed with a water spray not
exceeding 60 psi and 100ºF
a. True
b. False
23. When a PT test cannot be conducted between 50º - 125ºF, what must be
done, per ASME V?
a. The procedure must be qualified
b. The surface must be re-cleaned
c. The test cannot be conducted
d. None of the above
25. The scope of the ASME Boiler and Pressure Vessel, Code, Section V
includes
a. NDE acceptance criteria
b. How to perform NDE to achieve a desired result
c. Where to do NDE (i.e. what weld to examine)
d. Who can be the Authorized inspector
29. What materials require the use of tested and certified liquid penetrants as
to the contaminants in the penetrant
a. Nickel alloys
b. Austenitic stainless steel alloys
c. Ferritic / martensific stainless steel
d. Both a and b above
32. What designation is used to indicate the penetrameter is on the film side?
a. An “F”
b. An “E”
c. A “D”
d. An “FS”
34. Why must the surface be closely observed during the application of the
PT developer?
a. To ensure proper coating application
b. To ensure excess penetrant removal
c. To allow proper characterization of discontinuities
d. To see the “groovy” lines form
38. When are location markers placed on the film side in SWV for curved
surfaces?
a. Concave side is toward the source
b. Source-to-material distance greater than IR
c. A cobalt source is used
d. Both a and b above
42. Name one typical discontinuity detectable by the liquid penetrant method
a. I.P. on an NPS 2 girth weld
b. I.F. at the root of an NPS 2 girth weld
c. HAZ surface cracks on a NPS 2 girth weld
d. Slag inclusions on a NPS 8 longitudinal weld
43. What is to be done to excess penetrant remaining on the surface after the
specified penetration time as elapsed?
a. It must be removed
b. It can remain on the part
c. It must be developed
d. It must be removed with water only
44. A single film technique was used to make a radiograph using a Cobalt-60
source. The minimum permitted density in the area of interest is:
a. 4.0
b. 1.8
c. 2.0
d. 1.3
e. None of the above
45. A radiograph is made using an X-ray source and two films in each film
holder. If the film is to be viewed separately the minimum permitted
density would be.
a. 4.0
b. 1.8
c. 2.0
d. 1.3
e. None of the above
49. For an object of 1 inch thk , for 2-2T, when peni is placed on the film side
what is essential hole dia as per T 276
a. 20 thou
b. 40 thou
c. 60 thou
d. 50 thou
50. If For the object of 1 inch thk , for the peni to be placed on the source side
what is wire type peni and what are the wire should be visible
a. Set B , 9th wire
b. Set B 10th wire
c. Set B 11th wire
d. All
e. None
51. Pipe Single wall thk is 20 mm. Backing ring thk is 5 mm. Actual
reinforcement is 4 mm. Allowed reinforcement is 2.5 mm. If we are using
Double wall technique, which thk should be used for the peni selection
a. 20 mm
b. 22mm
c. 44 mm
d. 47.5 mm
52. Object thk is 50 mm. SOD is 300 mm. Source size is 5 mm. What is ug and
is it ok?
a. 0.5 mm, ok
b. 0.75 mm, not ok
c. 0.833 mm , not ok
d. O.833 mm, ok
53. Thk of the plate is 50 mm. SOD is 300 mm. Distance between the markers
on the film is 250 mm. What is minimum coverage required Fig
a. 10 mm
b. 5mm
c. 21mm
d. 25mm
54. The Following is the Test Meter Reading &Unit Meter Reading in the Amp-
meter of the Magnetizing equipment Is it Ok or Not?
55. There was a IR 192 RT film Having the OD minimum 2 and Maximum 3.5
and OD near Peni is 2.5. What is your opinion
a. OD is not ok in the lower limit
b. OD is not ok in the higher limit
c. OD is not ok in both the cases
d. OD is OK completely
56. The scope of the ASME Boiler and Pressure Vessel, Code, Section V
includes ( Art 1 T 110 &)
a. NDE acceptance criteria
b. How to perform NDE to achieve a desired result
c. Where to do NDE (i.e. what welds to examine)
d. All of above.
59. Which is/are advantage of magnetic particle testing over penetrant testing?
(Art 7 T 720)
a. It can detect surface discontinuities with foreign material imbedded in
them.
b. It is faster on individual parts.
c. It can detect near-surface discontinuities.
d. All of the above
60. Double wall Double image technique is used for the radiography of (T 271.2
b)
a. Plate welds
b. Tubular products with outer diameter less than 3.5 inch
c. Large pipes with outer diameter 200 mm and above
d. Heavy castings
62. The recommended minimum dwell time in minutes allowed for a material
made of high temperature alloy is:
a. 5 min
b. 15 min
c. 10 min
d. 6 min
63. A 1” thickness C.S. weld with 1/8” thk acceptable reinforcement was to be
radiographed. The applicable hole type penetrameter on (source side) and
essential hole shall be
a. ASME 30 - 2T
b. ASME 25 - 2T
c. ASME 20 - 2T
d. ASME 30 - 4T
66. Chose the correct option reg the number of peni and the peni designation
if 25 mm thk and 1 meter dia vessel is undergone panoramic single
exposure with ten films
a. Minimum two numbers of 20 peni placed at 90 deg to each other
b. Minimum three numbers of 25 peni placed at 120 deg to each other
c. Minimum 10 numbers of 25 peni at 36 deg to each other
d. Minimum 6 nos of 30 peni at 60 deg to each other
67. It takes 8 Micro seconds to reach the back of the steel plate and return
back what is thk of the plate
a. 10 mm
b. 24 mm
c. 2 inch
d. UT cannot be used in the steel plate
a) SWSI
b) DWDI Offset method
c) DWDI Superinposing shot method -C
d) DWSI
74) When D/d ratio is 10 Ug is 2 mm. When D/d ratio is 40 , is Ug ok as per the
ASME SEC V code
75) 12 inch dia- SS- schedule 80. DWSI was used. What is the hole type
that can be used as per ASME Sec V- Art-2-T 276
a) 80 mm. 1.02 mm
b) 88.9 mm, 0.5 mm
c) 80 mm, 0.5 mm
d) 88.9 mm, 1.02 mm
ASME SEC V QB
ANSWER KEY
35 B T 751
36 D T 720
37 C T 271.2 b2
38 D T 275.1
39 D T 274.1
40 A T 274.1
41 D UT 4.3
42 C T 620
43 A T 673
44 E The correct answer is –15% from the
transmitted density through the body of the
penetrameter
45 B T 282.1
46 A TABLE T276
47 D T 923 For API J1
48 C T 952
49 B T 276
50 D T 233
51 B T 27.2 a & b
52 C T 274.1& T 274 . 2
53 C T 275
54 A T (761.1c)
55 C T 282.1 & T 282.2
56 B ASME V, Art. 1, Scope
57 B ASME V, Art. 7, T-761
58 C ASME V, Art. 7, T-752.2
59 D ASME V, Art. 7, Scope & Gen. Knowledge
60 B ASME V, Art. 2, T-271 (b)
61 A ASME V, SE 797, 8.5
62 C ASME V, Table T-672
63 A ASME V, Table T – 276
64 A ASME V, T-652
65 E T 764 1.1
66 B T 277.2
67 B SE 797- 4.1
68 C T 676.4
69 D T 675 Last Para
70 E T 762
71 E T-277.1.D
72 E T 223
73 C T271.2
74 B T 284
75 D API 574 Table + ASME SECV Art 2 -276
B API 574 Table 2 & ASME Sec V Art 2
76
T 274.2
7. A wire IQI shall be placed adjacent to the weld, with the wires parallel to
the weld
a. True
b. False
14. D.C. yokes may be used for detecting subsurface discontinuities, per
ASME V?
a. True
b. False
Yokes are only for surface defects whether DC or AC
15. When coatings are applied to enhance contrast, the procedure must be
demonstrated that indications can be detected through the coating
a. True
b. False
16. How many total liquid penetrant techniques are listed in ASME V?
a. 4
b. 6
c. 2
d. 1
18. Water washable penetrant shall be removed with a water spray not
exceeding 60 psi and 100ºF
a. True
b. False
23. When a PT test cannot be conducted between 50º - 125ºF, what must be
done, per ASME V?
a. The procedure must be qualified
b. The surface must be re-cleaned
c. The test cannot be conducted
d. None of the above
26. The scope of the ASME Boiler and Pressure Vessel, Code, Section V
includes:
a. NDE acceptance criteria
b. How to perform NDE to achieve a desired result
c. Where to do NDE (i.e. what weld to examine)
d. Who can be the Authorized inspector
31. What materials require the use of tested and certified liquid penetrants as
to the contaminants in the penetrant
a. Nickel alloys
b. Austenitic stainless steel alloys
c. Ferritic / martensific stainless steel
d. Both a and b above
37. What designation is used to indicate the penetrameter is on the film side?
a. An “F”
b. An “E”
c. A “D”
d. An “FS”
39. Why must the surface be closely observed during the application of the
PT developer?
a. To ensure proper coating application
b. To ensure excess penetrant removal
c. To allow proper characterization of discontinuties
d. To see the “groovy” lines form
44. When are location markers placed on the film side in SWV for curved
surfaces?
a. Concave side is toward the source
b. Source-to-material distance greater than IR
c. A cobalt source is used
d. Both a and b above
48. Name one typical discontinuity detectable by the liquid penetrant method
a. I.P. on an NPS 2 girth weld
b. I.F. at the root of an NPS 2 girth weld
c. HAZ surface cracks on a NPS 2 girth weld
d. Slag inclusions on a NPS 8 longitudinal weld
49. What is to be done to excess penetrant remaining on the surface after the
specified penetration time as elapsed?
a. It must be removed
b. It can remain on the part
c. It must be developed
d. It must be removed with water only
50. What must be done to ensure 100% coverage on any NDE method?
56. Where are RT location markers placed, on the part or on the radiograph?
65. What type of discontinuity is the magnetic particle method most sensitive
to?
66. What is the examination medium when using MT? What is the probing
medium when using MT? Exa medium is iron powder and probing
medium is Mag Field
67. When must ultrasonic equipment be calibrated?
68. How many IQ is should appear on each radiograph, except for panoramic
techniques?
76. Steel greater than ___1.5 inch as per code “thick should be radiographed
with a cobalt source.
a. True
b. False
80. From what type of material should shims be fabricated when they are to
be used to radiograph welds in pressure retaining items?
86. What is the minimum and maximum allowable density through the image
of the penetrameter for radiographs made with:
a. A 2000 kV tube?
b. Cobalt 60 (Co60)?
87. A single film technique was used to make a radiograph using a Cobalt-60
source. The minimum permitted density in the area of interest is:
a. 4.0
b. 1.8
c. 2.0
d. 1.3
e. None of the above
88. Under ASME Code Section V, what upper and lower density limits are
acceptable for viewing if the density through the body of the
penetrameter is 2.7? Assume single film viewing.
91. A radiograph is made using an X-ray source and two films in each film
holder. If the film is to be viewed separately the minimum permitted
density would be.
a. 4.0
b. 1.8
c. 2.0
d. 1.3
e. None of the above
93. A. What are hole – type penetrameters and what are they used for
B. What are wire penetrameters and what are they used for?
98. Describe how the following surfaces should be prepared for Ultrasonic
examination.
a. Contact surfaces
b. Weld surfaces
c. Base material
99. Why are lead intensifying screens used in the X-ray examination
process?
101. When reviewing a radiograph, a dark image of the letter B can be seen
on the film. Does this indicate an unacceptable radiograph?
103. A. If IQIs are not placed on the source side, what rules apply?
B. for materials being radiographed other than welds, where are the
IQIs placed?
104. If the density through the IQI is 2.50, what would the maximum
allowable density and minimum allowable density be through the weld
represented by this un-shimmed IQI?
105. On a set of cassettes containing film for a seam just radiographed you
notice the lead location markers (i.e. 1-2, 2-3 etc) are taped to the
cassettes. Would these radiographs be acceptable? NO Location
markers should be placed on the part . it can be on the film side of the
part or the source side of the part
109. An item is designed for 625 psig. The item will be tested at 1.5 x
Design pressure. What should the absolute minimum gauge range be on
a test of this pressure, per AXME V Appendix 10?
a. 0-1012 psig
b. 0-1518 psig
c. 0-2025 psig
d. 0-4050 psig
Pie gauge has 8 numbers of LOW CS Pie section of thk 1/32 inch . pie gauge
is best for dry method. It should be placed so that the copper side is away
from the inspected surface
ANSWER KEY
1. a
2. a
3. d
4. false
5. a
6. d
7. false
8. d
9. true
10. c
11. c
12. b
13. True
14. False
15. True
16. b
17. a
18. False
19. d
20. b
21. c
22. b
23. a
24. d
25. c
26. b
27. b
28. d
29. a
30. d
31. d
32. d
33. c
34. a
35. c
36. d
37. a
38. c
39. c
40. b
41. a
42. d
43. c
44. d
45. d
46. a
47. d
48. c
49. a
50. All examinations must overlap to ensure 100% coverage of the part
51. Grinding, machine, or other methods
52. Surface and slight subsurface indications
53. Color contrast or Fluorescent penetrant
a. Water washable
b. Post – emulsifying
c. Solvent removable
84. a) IQI
b) Densitometers or step-wedge comparison films.
87. e-The correct answer is –15% from the transmitted density through the body of
the penetrameter
91. b
92. a
93. A. An IQI is a small strip of material, fabricated of radiographically similar
material to the object being inspected, and having a thickness of
approximately 2% of the object being radiographed. The IQI has three
holes in it. The sizes of these holes are 1T, 2T and 4T where “T” is the
thickness of the IQI. The 2T is designated as the essential hole, i.e. the
hole whose image must appear on the radiograph. IQI thickness and
essential hole size requirements are listed in tables in Section V of the
ASME Code.
The IQI is identified with a number made of lead that is attached to the IQI.
This number indicates the thickness of the IQI in thousandths of an inch.
B Wire type IQI use thin wires to ascertain sensitivity instead of holes. The
ability to see the wire required by the code indicates a quality radiograph.
94. The IQI should be placed the source side of the material being radiographed.
However, where inaccessibility prevents this, the IQI may be placed on the film
side of the material being radiographed provided a lead letter “F” at least as
high as the identification number is placed adjacent to the IQI.
96. A densitometer (or step wedge comparison film) shall be used for judging film
density requirements. Film density is a measure of overall darkening of the
radiograph, which is directly related to the sensitivity, definition, and overall
quality of the technique.
97. a) Shims may be used when necessary to produce a radiograph in which the
radiographic density throughout the area of interest is no more than minus 15%
from (lighter than) the radiographic density through the IQI.
98. a) The finished contact surface shall be free from weld splatter and any
roughness that would interfere with free movement of this search unit or impair
the transmission of ultrasonic vibrations.
b) The weld surfaces shall be finished so they cannot mask or be confused with
reflections from defects, and should merge smoothly into the surfaces of the
adjacent base materials.
c) The volume of base material through which the sound will travel in angle
beam examination shall be completely scanned with a straight beam search
unit to detect reflectors which might affect interpretation of angle beam results.
99. Lead foil intensifying screens used in the X-ray examination may be placed
directly in front of the film. The screen provides an intensifying action and in
addition, the back one acts as filter bay preferentially absorbing backscattered
radiation from the specimen thus improving image quality.
100. The two common radiographic sources in industrial use today are X-ray
machines and artificially produced radioactive isotopes of certain metallic
elements.
101. No.
102. The part is first thoroughly cleaned of oil, dirt, etc, then a liquid penetrant is
applied to the surface to be examined and allowed to enter the discontinuities.
All excess penetrant is then removed, the part is dried, and a developer is
applied. The developer functions both as a blotter to absorb penetrant that has
been trapped in discontinuities and as a contrasting background to entance the
visibility of penetrant indications. The dyes in penetrants are either color
contrast (visible under white light) or fluorescent (visible under ultraviolet light).
103. a) The penetrameter should be placed on the source side of the material
being radiographed. However, where inaccessibility prevents this, the
penetrameter may be placed on the film side of the material being radiographed
provided a lead letter “F” at least as high as the identification number is placed
adjacent to the penetrameter.
b) For material other than weld a source side penetrameter shall be placed
in the area of interest.
105. No Location markers that are to appear on the radiographic film should be
placed on the part being examined and not on the cassettes.
106. d
107. d
108. c
109. b
110. b
ASME SEC V QB
1. A filmside penetrameter can be used for :
a. Inaccessible welds (unable to hand place a source penetrameter)
b. All welds
c. All castings at any time
d. An alternative to a source-side wire penetrameter
10. What designation is used to indicate the penetrameter is on the film side?
a. An “F”
b. An “E”
c. A “D”
d. An “FS”
d. Toe cracks
13. When are location markers placed on the film side in SWV for curved
surfaces?
a. Concave side is toward the source
b. Source-to-material distance greater than IR
c. A cobalt source is used
d. Both a and b above
16. Name one typical discontinuity detectable by the liquid penetrant method
a. I.P. on an NPS 2 girth weld
b. I.F. at the root of an NPS 2 girth weld
c. HAZ surface cracks on a NPS 2 girth weld
d. Slag inclusions on a NPS 8 longitudinal weld
17. A single film technique was used to make a radiograph using a Cobalt-60
source. The minimum permitted density in the area of interest is:
a. 4.0
b. 1.8
c. 2.0
d. 1.3
e. None of the above
ASME SEC V QB
Answers
Q.NO. ANS
1 a
2 b
3 a
4 d
5 d
6 b
7 b
8 a
9 c
10 a
11 b
12 d
13 d
14 d
15 d
16 c
17 c
18 a