RFB4 V0101 EN Pdfpep
RFB4 V0101 EN Pdfpep
RFB4 V0101 EN Pdfpep
Wiremold
60 Woodlawn Street
Product Environmental Profile
West Hartford, CT 06110
1.877.BY.LEGRAND (295.3472)
Wiremold® RFB4 Multi-Service Steel
www.legrand.us Recessed Floor Boxes
For information on Legrand PEP’s and other sustainability initiatives, scan the QR code to be brought to our Product
Sustainability page.
REFERENCE PRODUCT
Provides 4 wiring compartments for installation of power, communication and/or A/V devices, recessed in
Function concrete for a minimum period of 20 years. These compartments can be fed by conduits of various sizes (six
3/4" (19.1mm), six 1 1/4" (32mm), three 1" (25mm) and one 1/2" (12.7mm)).
Reference Product
PRODUCTS CONCERNED
The environmental data is representative of the following products:
Description
The environmenal data is representative of the following products:
RFB4, RFB4-4DB, RFB4-SS
CONSTITUENT MATERIALS
This Reference Product contains no substances prohibited by the regulations applicable at the time of its introduction to the market.
It respects the restrictions on use of hazardous substances as defined in the RoHS directive 2011/65/CE.
Packaging as % of weight
Paper 9.1%
Wood 7.0%
PE 0.6%
Total plastics 17.6% Total metals 65.6% Total other and packaging 16.8%
Estimated recycled material content: 21% of weight.
MANUFACTURING
This Reference Product comes from a site that has initiated an environmental certification.
DISTRIBUTION
Products are distributed from logistics centers located to optimize transport efficiency. The Reference Product is therefore transported over
an average distance of 621 miles [1000km] by truck from our warehouse to the local point of distribution into the market in North America.
INSTALLATION
For the installation of the product, only standard tools are needed.
USE
Servicing and maintenance:
Under normal conditions of use, this type of product requires no servicing or maintenance.
Consumable:
No consumables are necessary to use this type of product.
END OF LIFE
Development teams integrate product end-of-life factors in the design phase.
• Hazardous waste* contained in the product: no hazardous waste
(*) Hazardous waste as defined by European Commission decision 2000/532/EC.
• Recycling rate:
Calculated using the method described in the IEC/TR 62635 technical report, the recyclability rate of the product is estimated as 91%.
This value is based on data collected from a technological channel using industrial procedures. It does not pre-validate the effective use
of this channel for end-of-life electrical and electronic products.
Separated into: (% mass of Reference Product)
- Plastic materials (excluding packaging) : 17%
- Metal materials (excluding packaging) : 65%
- Packaging materials (all types of materials) : 9%
ENVIRONMENTAL IMPACTS
The evaluation of environmental impacts examines the stages of the Reference Product life cycle: manufacturing, distribution,
installation, use, and end of life. It is representative of products marketed and used in North America.
Manufacturing Packaging taken into account. As required by the PEP ecopassport program all transport for the manufacturing of the
Reference Product, including materials and components, has been taken into account. The waste generated during
manufacturing phase has been taken into account.
Distribution Transport between the last distribution center and an average delivery to the sales area.
Installation Installation components not delivered with the product are not taken into account. The end-of-life of the packaging
is taken into account at this phase.
Use • Under normal conditions of use, this type of product requires no servicing or maintenance.
• No consumables are necessary to use this type of product.
• Product category: envelope (as enclosure…)
• Use scenario: No energy consumption during the 20 year working life. This modelling duration does not constitute a
minimum durability requirement.
• Energy model: Electricity Mix (US) - 2009
End of life The default end of life scenario maximizing the environmental impacts.
Software used EIME V5 and its database “CODDE-2015-04” and the indicators defined in the PCR ed 3 in alignment with the EN15804
standard
Global warming 1.49E+01 kgCO2 eq. 1.40E+01 94% 6.23E-01 4% 3.85E-02 < 1% 0.00E+00 0% 2.26E-01 2%
Ozone depletion 1.73E-06 kgCFC-11 eq. 1.73E-06 100% 1.26E-09 < 1% 3.14E-10 < 1% 0.00E+00 0% 2.89E-09 < 1%
Acidification of soils
3.84E-02 kgSO2 eq. 3.45E-02 90% 2.80E-03 7% 1.86E-04 < 1% 0.00E+00 0% 9.26E-04 2%
and water
Water eutrophication 7.39E-03 kg(PO4)3- eq. 5.15E-03 70% 6.43E-04 9% 2.01E-04 3% 0.00E+00 0% 1.40E-03 19%
Photochemical ozone
4.00E-03 kgC2H4 eq. 3.71E-03 93% 1.99E-04 5% 1.32E-05 < 1% 0.00E+00 0% 7.03E-05 2%
formation
Depletion of abiotic
1.00E-03 kgSb eq. 1.00E-03 100% 2.49E-08 < 1% 1.73E-09 < 1% 0.00E+00 0% 1.12E-08 < 1%
resources - elements
Total use of primary
6.56E+02 MJ 6.43E+02 98% 8.81E+00 1% 5.54E-01 < 1% 0.00E+00 0% 3.19E+00 < 1%
energy
Net use of fresh
1.39E-01 m3 1.39E-01 100% 5.57E-05 < 1% 1.36E-05 < 1% 0.00E+00 0% 1.05E-04 < 1%
water
Depletion of abiotic
resources – fossil 1.84E+02 MJ 1.72E+02 93% 8.75E+00 5% 5.37E-01 < 1% 0.00E+00 0% 3.06E+00 2%
fuels
Water pollution 9.52E+02 m3 8.13E+02 85% 1.02E+02 11% 5.84E+00 < 1% 0.00E+00 0% 3.00E+01 3%
Air pollution 2.51E+03 m3 2.46E+03 98% 2.55E+01 1% 4.85E+00 < 1% 0.00E+00 0% 1.75E+01 < 1%
The values of the 27 impacts defined in the PCR-ed3-EN-2015 04 02 are available in the digital database of pep-ecopassport.org website.
The values of these impacts are valid for the context specified in this document. They must not be used directly to draw up the environmental
balance sheet for the installation.
90%
80%
70%
60%
End
of
life
Use
50%
Installation
Distribution
40%
Manufacturing
30%
20%
10%
0%
GWP ODP A EP POCP ADPe PE FW ADPf WP AP