Method Statement Megger Testing

Uploaded by

Jemerald
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
242 views

Method Statement Megger Testing

Uploaded by

Jemerald
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

6/17/2019 method statement megger testing

Have any question?  (00) 201277767728  [email protected] Login | Pro le

PROJECT MANAGEMENT
Home Blog Project Management method statement megger testing

method statement megger testing


Posted by Categories Date Comments
HANY ISMAIL, MSC, PMP PROJECT MANAGEMENT JANUARY 17, 2013 3 COMMENTS

method statement megger testing for power cables &branch


circuit wiring, Megger Test Equipment,Cable Megger
Testing Procedure.

EQUIPMENT AND TOOLS megger testing:-


1. Megger Instrument shall be having valid calibration.

2. Megger-with range 500V/1000V shall be used for conducting the test.


https://planningengineer.net/method-statement-megger-testing/ 1/11
6/17/2019 method statement megger testing

Megger range 500 V shall be used for Wire testing

Megger range 1000 V shall be used for Cable testing

method statement megger testing

PRE – TEST PREPARATION megger testing:-

1. The leads used for connecting megger testing with the circuit should be fault free and the two
connecting leads should have electrical continuity. It is checked by touching the free ends of the leads
together while the megger button is pressed ON to check for zero resistance.

2. Check for PVC adopters are provided for cables and male adapter for all PVC conduits terminating in
the panel board.

3. Check the dressing is complete for all the wires in the panel boards

4. Con rm all the connections are completed before the testing.

ELECTRICAL CONTINUITY TEST megger testing;-

1. Connect the free megger test probes to any two conductors required to be tested.

2. With all the appliance connected or the two ends of the conductors shorted and all Switches
switched ON the reading shown on the megger should be zero. If the reading shows in nity then there
is an open circuit. The fault should be traced and recti ed.

3. For cables, the extreme ends of any two phase is shorted and when the test is conducted the reading
should be zero if the meter reads in nity or some value of mega ohms then there is a fault in the cable
and it should be recti ed. Same procedure shall be repeated for other 3 conductors of the cable.

SHORT CIRCUIT TEST / INSULATION RESISTANCE TEST;-

FOR WIRES;

https://planningengineer.net/method-statement-megger-testing/ 2/11
6/17/2019 method statement megger testing

1. For wires the circuit is tested, Megger range should be 500V

I. Between phase and neutral.

II. Between phase to earth

III. Between neutral to earth

With the other ends of the circuit conductor open the value should be in nity for all the test. If the value
is zero there is short circuit or the insulation of the wire is damaged and the wire is changed
accordingly.

FOR CABLES:-

For Cables the Megger range should be 1000V, and both the ends of the cable shall be kept open and
test shall be conducted between phases and neutrals as follows:

neutrals as follows:

i.RtoY

ii.RtoB

iii.YtoB

iv.RtoN

V.YtoN

vi.BtoN

all these reading should be in nity, if otherwise the cable ^ores/phases are faulty and should be
recti ed.

The test results shall be recorded in a format for Engineers reference and record. The format shall be
submitted to Consultant for approval in advance prior to perform the megger test operation.

Tag: cable, megger testing, method statement, method statement megger testing, test

https://planningengineer.net/method-statement-megger-testing/ 3/11
6/17/2019 method statement megger testing

Share:     

Hany Ismail, MSC, PMP

Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his
career back in 2003 as a site engineer, technical o ce engineer, planning engineer, planning
manager, and nally planning department manager where he has been involved in several
mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own
company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project
management from Liverpool University-UK 2013-2016, PMP certi ed from PMI-USA 2010, and
BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of
planning and project management training on his website planningengineer.net, YouTube
channel, and o ine courses since 2011. He enjoys teaching project management in simple
and practical way, and he developed several planning tools, techniques and courses.

Previous post Next post

method of statement for unit masonry method of statement for drainage pipe
January 17, 2013 installation
January 17, 2013

YOU MAY ALSO LIKE

https://planningengineer.net/method-statement-megger-testing/ 4/11
6/17/2019 method statement megger testing

Difference between Claim Power BI is the next level of data Planned Spen
Specialist and Delay Analyst analytics and visualization used to monit
3 March, 2019 20 February, 2019 7 February, 201

3 COMMENTS

Schmuelsons Reid June 10, 2013 Log in to Reply

Somebody with hands on experience please help me on this one. Considering the
high voltage involved I need to clarify and propose and calculate the risk, probability
and the severity of the works impact.

I Am Engineer June 2, 2015 Log in to Reply

Thank you for this very informative blog post. I am also a Civil Engineer and I am
currently into Mechanical and Electrical works. You are an inspiration to me!

Karuti Dickson Mashauri November 25, 2016 Log in to Reply

Am also a civil engineer at university of dar es salaam,i thanks to all who giving
more explanation for different de nition and principles.

https://planningengineer.net/method-statement-megger-testing/ 5/11
6/17/2019 method statement megger testing

LEAVE A REPLY

You must be logged in to post a comment.

Connect with:

 Login with Facebook  Login with Google

 Login with Twitter  Login with LinkedIn

No products in the cart.

Search … 

PLANNING COURSES

Arabic Planning Course for Non Planners

$50.00

Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

$500.00

Professional Planning Engineer (PPE) – Online Workshop

$335.00

https://planningengineer.net/method-statement-megger-testing/ 6/11
6/17/2019 method statement megger testing

Primavera Online Basic Course

$75.00

Golden Package Courses- 7 Courses & 5 Excel Tools

$185.00

Claims Management, Extension of Time (EOT) and Delays Analysis-Online


Workshop

$175.00

RECENT PLANNING JOBS

LOOKING FOR PLANNING ENGINEER FOR WITH 5 YEARS


OF EXPERIENCE FOR MAKKAH CITY -SAUDI ARABIA
SAUDI ARABIA

AL-AYUNI

FULL TIME

LANNING ENGINEER / DELAY ANALYST AT ORASCOM


CONSTRUCTION -EGYPT
EGYPT

ORASCOM CONSTRUCTION

FULL TIME

https://planningengineer.net/method-statement-megger-testing/ 7/11
6/17/2019 method statement megger testing

PLANNING ENGINEER & CONTROL MANAGER EPC


COMPANY -UAE
UAE

OKCONSULTS

FULL TIME

JUNIOR /FRESH PLANNING ENGINEER – UAE


UAE

PRIVATE

FULL TIME

PLANNING ENGINEER , 5-8 YEARS EXPERIENCE –


DAMMAM – SAUDI ARABIA
https://planningengineer.net/method-statement-megger-testing/ 8/11
6/17/2019 method statement megger testing

SAUDI ARABIA

AL MASHARIQ

FULL TIME

PLANNING ENGINEER ROADS AND INFRASTRUCTURE


SECTORS -ABU DHABI -UAE
UAE

TATWEER 

FULL TIME

PLANNING ENGINEER – OIL AND GAS – DUBAI BASED


UAE

HIRE RIGHTT

FULL TIME

PLANNING ENGINEER GHANTOOT GROUP BUILDING


DIVISION – UAE
UAE

GHANTOOT GROUP

FULL TIME

https://planningengineer.net/method-statement-megger-testing/ 9/11
6/17/2019 method statement megger testing

PLANNING ENGINEER MID LEVEL ARABIC SPEAKER


WITH GOOD ENGLISH – SAUDI ARABIA
SAUDI ARABIA

DE LEEUW GROUP

FULL TIME

EGYPTIAN PLANNING ENGINEER – ALEXANDRIA, EGYPT


EGYPT

TECHNIPFMC

FULL TIME

PLANNING ENGINEER EST.

 (00) 201277767728

[email protected]

FOLLOW US:

    

COMPANY

About Us

Contact Us

Terms of Service

Privacy Policy

Refund Policy
https://planningengineer.net/method-statement-megger-testing/ 10/11
6/17/2019 method statement megger testing

GET OUR FEATURED CONTENT

Your Name

Email Address

SUBSCRIBE

Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for

Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the

copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

Primavera p6 Training Planning Tools Planning Blog

https://planningengineer.net/method-statement-megger-testing/ 11/11

You might also like