0% found this document useful (0 votes)
207 views6 pages

HORDY Design Example

The document provides design details for various structural elements of a building, including: - A one-way slab system with a thickness of 80mm and main reinforcement of φ8 bars at 260mm spacing - Ribs within the slab with dimensions of 120mm x 330mm x 270mm and reinforcement of φ10 and φ12 bars - Secondary beams with dimensions of 380mm x 330mm x 270mm and reinforcement of 4φ16 and 5φ16 bars - Main beams with dimensions of 1000mm x 330mm x 270mm and reinforcement of 11φ20 and 16φ20 bars

Uploaded by

brian1mugadza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views6 pages

HORDY Design Example

The document provides design details for various structural elements of a building, including: - A one-way slab system with a thickness of 80mm and main reinforcement of φ8 bars at 260mm spacing - Ribs within the slab with dimensions of 120mm x 330mm x 270mm and reinforcement of φ10 and φ12 bars - Secondary beams with dimensions of 380mm x 330mm x 270mm and reinforcement of 4φ16 and 5φ16 bars - Main beams with dimensions of 1000mm x 330mm x 270mm and reinforcement of 11φ20 and 16φ20 bars

Uploaded by

brian1mugadza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

EXAMPLE :

Design the slab shown as a one-way joist floor ( hordi system ).


Total D.L. = 6 kN/m2, L.L. = 3 kN/m2.
fc’ = 28 N/mm2, fy = 420 N/mm2.

Design of Slab :
Slab thickness = 80 mm

Slab reinforcement = ( As ) shr


= 1.8 h = 1.8 ( 80 ) = 144 mm2/ m
( 8 @ 340  147 mm2/ m )
1
But max. bar spacing = spacing between ribs
2

 USE   8 @ 260

1
Design of Ribs :

Ribs Dimensions :
b = 120 mm, h = 330 mm, d = 270 mm
LOADS :

Ultimate load on slab = 1.4 (6) + 1.7 (3) = 13.5 kN/m2


Load on ribs from slab = 13.5 (0.52) = 7.02 kN/m
Weight of ribs = 1.4 (24) (0.12 x 0.33) = 1.33 kN/m
 Ultimate load on each rib = 7.02 + 1.33 = 8.35 kN/m
MOMENTS :
1
Positive Mu = ( 8.35 ) ( 5.2 ) 2 = 14.11 kN. m
16
Required As = 144 mm2 ( 2 10  158 mm2 )
158
Check  = 120 x 270 = 0.0049

1.4
min = f = 0.0033 [ min ( O.K. ) ]
y

1
Negative Mu = ( 8.35 ) ( 5.2 ) 2 = 20.53 kN. m
11
Required As = 214 mm2 ( 2 12  226 mm2 )

 USE 2   10 Bottom reinforcement,


and 2   12 Top reinforcement

CHECK SHEAR :

1
Reaction = ( 8.35 ) ( 5.2 ) = 21.71 kN
2
Vu @ a distance “d” from support
= 21.71 - 8.35 ( 0.27 ) = 19.46 kN

2
 Vc = 0.85 ( 0.17 28 ) ( 120 x 270 ) / 1000
= 24.77 kN
 Vc
 Vu   Vc  Provide minimum shear reinforcement
2
Use 8 stirrups  Av = 100 mm2
Av f y 100 x 420
Required spacing =   1029 mm
0.34 b 0.34 x 120
d 270
But maximum spacing = = = 135 mm
2 2

 USE   8 @ 150

Design of Secondary Beams :


Beams’ Dimensions :
b = 380 mm, h = 330 mm, d = 270 mm
Beam span ( to face of column ) = 5.9 m
Assume beam supports a 200 mm wall, 2.8 meters high
LOADS :

Load on beam from slab =13.5 (0.78) =10.53 kN/m


Weight of beam = 1.4 (24) (0.38 x 0.33) = 4.21 kN/m
Weight of wall = 1.4 ( 3.77 x 2.8 ) = 14.78 kN/m
 Ultimate load on beam = 10.53 + 4.21 + 14.78 = 29.52 kN/m

MOMENTS :
1
Positive Mu = ( 29.52 ) ( 5.9 ) 2 = 64.22 kN. m
16
Required As = 668 mm2 ( 4 16  804 mm2 )
804
Check  = 380 x 270 = 0.0078 min ( O.K. )

3
1
Negative Mu = ( 29.52 ) ( 5.9 ) 2 = 93.42 kN. m
11
Required As = 1002 mm2 ( 5 16  1005 mm2 )

 USE 4   16 Bottom reinforcement,


and 5   16 Top reinforcement

CHECK SHEAR :

1
Reaction = ( 29.52 ) ( 5.9 ) = 87.08 kN
2

Vu @ a distance “d” from support


= 87.08 - 29.52 ( 0.27 ) = 79.11 kN

 Vc = 0.85 ( 0.17 28 ) ( 380 x 270 ) / 1000


= 78.45 kN  Vu
 Provide minimum shear reinforcement
Use 8 stirrups  Av = 100 mm2
Av f y 100 x 420
Required spacing =   325 mm
0.34 b 0.34 x 380
d 270
But maximum spacing = = = 135 mm
2 2

 USE   8 @ 150

4
Design of Main Beams :

Beams’ Dimensions :
b = 1000 mm, h = 330 mm, d = 270 mm
Beam span ( to face of column ) = 6.2 m
Beam supports a 200 wall, 2.8 meters high
LOADS :

Load on beam from slab = 13.5 ( 6.2 ) = 83.70 kN/m


Weight of beam = 1.4 (24) (1.0 x 0.33) = 11.09 kN/m
Weight of wall = 1.4 ( 3.77 x 2.8 ) = 14.78 kN/m
Weight of ribs = 11 (1.4) (24) (0.12 x 0.33 x 5.2) / 6.2
= 12.28 kN/m

 Ultimate load on beam = 83.70 +11.09+14.78 +12.28 = 121.85 kN/m

MOMENTS :
1
Positive Mu = ( 121.85 ) ( 6.2 ) 2 = 292.75 kN. m
16
Required As = 3205 mm2 ( 11  20  3454 mm2 )

1
Negative Mu = ( 121.85 ) ( 6.2 ) 2 = 425.81 kN. m
11
Required As = 4988 mm2 ( 16 20  5024 mm2 )

Check  max = 0.0213


5024
= 1000 x 270 = 0.0186 max ( O.K. )

 USE 11   20 Bottom reinforcement,


and 16   20 Top reinforcement

5
CHECK SHEAR :

1
Reaction = ( 121.85 ) ( 6.2 ) = 377.74 kN
2
Vu @ a distance “d” from support = 377.74 - 121.85 ( 0.27 ) = 344.84 kN
 Vc = 0.85 ( 0.17 28 ) ( 1000 x 270 ) / 1000 = 206.45 kN  Vu
 Shear reinforcement is REQUIRED

Use 8 double loop stirrups  Av = 4 x 50 = 200 mm2


Vu =  ( Vc + Vs )  Vs = (Vu +  Vc ) / 

344.84206.45
Vs = = 162.81 kN
0.85
Av . fy . d 200 x 420 x 270
Required spacing = = 162.81 x 1000
= 139 mm
Vs
d 270
But maximum spacing = = = 135 mm
2 2

 USE   8 @ 130 “ double loop stirrups “