RWOMWODPrint PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Approved

Larsen & Toubro Limited, Construction.


PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Work Order - EG247WOD8000068

Job Address : LE170268 - Beur Sewerage Network-Patna - Beur Sewerage Network Project - L&T Construction, Plot No-1884, Near
Primary School, Beur Jail Road, Anishabad, Patna, Bihar, India, 800002
Vendor Address : S0121078 - BHARTI AIRTEL LIMITED ( BHUBHANESWAR ) - PLOT NO E13/1, BASEMENT FLOOR,, PATIA,
CHANDRASHEKHARPUR,, BHUBHANESWAR, ORISSA, INDIA , 751024, UTPAL NANDI, 9831049169,
[email protected]
Payment Centre : SZ000010 - Shared Services Centre - Accounting Center

Company PAN No : AAACL0140P Vendor PAN No : AAACB2894G - VALID

WOR Number : EG247WOR8000073 Dt: 27-Jun-2018 WO Number : EG247WOD80000 Dt: 27-Jun-2018


68
WO Period From : 01-Apr-2018 To: 20-Mar-2020 WO Type : Service WO Status : Active

Amendment No : 0 Dt: Bill Type : Running

DLP Period : DLP Date :

Payment Terms : (1) 100.00% On Execution 0 Days Credit by Cheque

Nature Of Work : Internet service providing

Remarks : 4096 KBps internet bandwith at -Beur more, Near water tank, Beur, Patna- 800002

Supply From : 10AAACB2894G1Z2 Supply To: 10AAACL0140P1ZY

Values In : INR

Item Details

UOM Rate

Sl.No Item Code Item Description Mark Up SAC Code


Quantity Amount

WORK CATEGORY : Commercial


Nos 28750.00
services. APPLICATION :
Communication Expenses NATURE OF
SERVICE : Leased Line Charges SCOPE
1 190000000000391 0 9984
INVOLVES : Internet Bandwidth
DIFFERENTIATOR : 3. - 8.000 230000.00
Quaterlyrecurring charges for internet
leasedline bandwidth (4 MBPS)-
WORK CATEGORY : Commercial
Nos 5000.00
services. APPLICATION :
Communication Expenses NATURE OF
SERVICE : Leased Line Charges SCOPE
2 190000000000392 0 9984
INVOLVES : Internet Bandwidth
DIFFERENTIATOR : 4. - One 1.000 5000.00
timecharges for internet leased
linebandwidth (4 MBPS)-
Work Order
235000.00
Value :

Recommended By: For Larsen & Toubro Limited, Construction.

Report Generated at 21-Jan-2020 2:50:05 PM Page 1 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG


Approved

Larsen & Toubro Limited, Construction.


PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamilnadu, India

CIN - L99999MH1946PLC004768

WOM Work Order - EG247WOD8000068

Tax Details

Sl.No Description Billed Tax Amount Balance Tax Amount Total Tax Amount

1 CGST (9 %) 18192.48 2957.51 21149.99

2 SGST (9 %) 18192.48 2957.51 21149.99

Tax : 42299.98

Total : 277299.98

Standard Deduction Details

Sl.No Deduction Type Description Percentage Effective From Effective To Date


% Date

1 INCOME TAX TDS 10.00 01 Apr 2019 31 Mar 2020

2 INCOME TAX Surcharge on TDS 0.00 01 Apr 2019 31 Mar 2020

3 INCOME TAX Cess on (TDS+Surcharge) 0.00 01 Apr 2019 31 Mar 2020

4 LOWER IT TDS 0.10 29 Apr 2019 31 Mar 2020

5 LOWER IT Surcharge on TDS 0.00 01 Apr 2019 31 Mar 2020

6 LOWER IT Cess on (TDS+Surcharge) 0.00 01 Apr 2019 31 Mar 2020

Additional Terms & Conditions

Sl.No Component Description & Value

1 DETAILS OF WORK : Providing internet connection leased line bandwidth (4 MBPS)

2 PRICE & VALIDITY : 1. Quaterly recurring charges for internet leased line bandwidth (4 MBPS): 2 years * ?
1,15,000.00 = ? 2,30,000.00 2. One time charges: ? 5000
3 ADVANCE TERMS : There shall not be any advance payments.

4 TAXES & DUTIES VARIATIONS : Quoted rates are exlcusive of taxes and Duties. GST shall be paid to you at
the rates applicable
5 QUANTITATIVE PAYMENT TERMS : 100 % payment shall be released

6 SUBMISSION OF INVOICE : Invoice shall be submitted quaterly.

7 TERMINATION OF CONTRACT : In case of poor progress of your work affecting our contract with our employer
and/or if the Quality of your service falls below the expected standards in such cases, we reserve the right to
suspend your operation, fully or partly, without assigning any reason. Payment on such a contingency shall be
made to you for the actual work done at that stage, deducting any loss that we may have to suffer due to your
default as per the calculations by EIC. On such occasions, decision of project manager shall be final. All disputes
arising out of this work order failing amicable settlement at site shall be referred to the Cluster Head ±L&T
Construction ±WET IC at Kolkata Cluster and the decision is final and binding both parties. In case it fails, the
dispute shall be referred to arbitration. The arbitrators shall appoint an umpire. In the event the arbitrators not
reaching an agreement, the decision of the umpire shall be final and conclusive. The arbitration proceedings
shall be governed in accordance with the Indian Arbitration Act 1996 or any statutory modifications thereof for
the time being in force and such arbitration shall take place in Chennai.

Recommended By: For Larsen & Toubro Limited, Construction.

Report Generated at 21-Jan-2020 2:50:05 PM Page 2 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG

You might also like